Development Commission Auto captions

Wednesday, March 5, 2025

6:30 PM · Council Chambers, 135 E. Sunset Way, Issaquah WA
Topic tracked across meetings:
Site Development Permit Application for Park Place Townhomes, Quasi-Judicial AB 6970 24/25
Section
2. APPROVAL OF MINUTES
2a
Minutes of January 15, 2025
packet pp.5–12
Staff report:
MINUTES DEVELOPMENT COMMISSION 6:30 p.m. – Wednesday, January 15, 2025
4. PUBLIC HEARING
4a
Site Development Permit & Preliminary Plat Application for Madison Lane Townhomes, Quasi-Judicial (A)
Emily Medina, Associate Planner Hossein Mansouri, Jamie Schroeder, and Peter Durland, Applicant Team Application No: SDP24-00008; PP24-00001 Location: 800 Front St. S. Parcel: 3424069188 Applicant: Hossein Mansouri, D.R. Horton Description: Site Development Permit and Preliminary Plat application for a unit lot Public Hearing Order: · packet pp.13–1042
Topics: Land Use
Staff report:
STAFF REPORT Site Development Permit and Preliminary Plat File No. SDP24-00008; PP24-00001 (PRJ23-00011) February 26, 2025
5. REPORTS
5a
City Council Update
6. OTHER BUSINESS / ANNOUNCEMENTS
6a
Upcoming Schedule
packet pp.1043
Staff report:
Development Commission 2025 Schedule (subject to change)
0:05 good evening and welcome I'd like to
0:07 call the March 5th city of isqua
0:09 development commission meeting to order
0:11 at 6:30 p.m. as a reminder we have a
0:14 remote aspect to our meetings this means
0:16 both staff and members of the public may
0:18 be participating in the meeting remotely
0:20 via WebEx for those attending remotely
0:23 if you have questions or issues please
0:25 send the host a chat message or email
0:27 staff at Christen l isua goov excused
0:31 absence for this meeting tonight is
0:33 commissioner Gilbert our first item of
0:36 business is to take action on the
0:38 meeting minutes for January 15th hope
0:40 we've had a chance to look them over are
0:42 there any corrections to the January
0:43 15th minutes in the agenda
0:47 packet hearing none the minutes are
0:49 approved as
0:51 submitted next I'd like to open the
0:53 floor for any members of the public in
0:54 person or virtually who like to make a
0:57 general comment not about the Madison
0:59 Lane Town Homes project but on General
1:02 topics there will be an opportunity
1:04 later in the meeting for those who' like
1:05 to comment about the project on
1:07 tonight's agenda Miss Jackson has
1:10 anybody signed up to make General Public
1:12 comments no chair okay thank you we'll
1:16 roll on into regular business and our
1:17 main agenda item for the evening pred
1:20 decision open record public
1:22 hearing the order for this hearing will
1:24 be as follows first the purpose of the
1:26 public hearing followed by our
1:28 appearance of fairness dis closures then
1:31 we'll open the public hearing with a
1:32 staff presentation followed by an
1:34 applicant presentation then we'll open
1:37 the floor for public comment there'll be
1:39 an opportunity for rebuttal by applicant
1:41 and then staff and then we'll close the
1:43 public hearing commission deliberation
1:46 will then be followed by action
1:48 including motions amendments and vote
1:50 and that will conclude the agenda item
1:52 on the Quasi judicial permit if for any
1:55 reason the hearing can't be completed
1:56 this evening it may be continued to a
1:59 specified date
2:01 purpose of this hearing this is the
2:03 formal public hearing for the Madison
2:05 Lane Town Homes development proposal
2:08 being considered as a preliminary plat
2:10 and site development permit application
2:12 for an 11 unit residential development
2:15 divided between two buildings located at
2:17 800 Front Street South purpose of the
2:20 hearing is to solicit public comment and
2:22 facilitate review discussion and
2:24 decision on the application by the
2:27 development
2:28 commission this is a qu judicial hearing
2:31 and so miss Medina please proceed with
2:34 our appearance of fairness
2:40 disclosures thank you chair
2:57 Sanford all right good evening
2:59 commissioner we'll start with the
3:01 appearance of fairness
3:03 um so as chair sford said quasi judicial
3:07 decisions require proceedings to be fair
3:09 in fact and appearance um expart
3:12 contacts are prohibited um and the test
3:15 is would a disinterested person knowing
3:17 the totality of a decision Maker's
3:19 personal interest in a matter be
3:20 reasonably justified in thinking that
3:22 partiality may exist uh decision makers
3:24 who have personal interest prejudgment
3:26 of issues or partiality are disqualified
3:28 from the proceedings
3:30 so I'm going to go through the questions
3:32 for the commissioner and I'm going to
3:34 stop at the end of each question and get
3:36 your response um as we go through these
3:38 um each of the Commissioners can just
3:40 respond out loud as we go through do you
3:43 have a personal interest Financial or
3:45 otherwise in the outcome no does your
3:48 employer have an interest Financial or
3:50 otherwise in the outcome no do you have
3:53 any familial social or business
3:55 relationships or connections with any of
3:57 the parties or non-parties who have an
3:59 interest in the outcome no do you have
4:02 any special knowledge about the
4:04 substantive or the merits of this
4:05 proceeding which would or could cause
4:08 you to prejudge the outcome
4:12 no will will there be any prospective
4:15 employment for you or your family as a
4:17 result of the decision no do you own or
4:20 control property within 300 ft of the
4:22 subject property no do you have any
4:25 expart Communications regarding this
4:27 project no
4:30 do you believe you can sit and hear this
4:31 matter fairly and impartially both as to
4:34 the respective positions of the
4:35 proponents and the opponents of this
4:37 matter
4:40 yes uh questions for the audience does
4:42 anyone in attendance wish to challenge
4:44 the the participation of any
4:45 commissioner based on the appearance
4:47 Airness
4:49 Doctrine thank
4:51 you all right I'm going to pass out our
5:10 okay thank you now we'll open the public
5:13 hearing at 6:37 p.m. first we'll proceed
5:17 with staff's presentation so miss Medina
5:20 while you're up there I will need to
5:22 swear you in please state your name and
5:24 position with the city for the record
5:27 Emily Medina associate planner with the
5:29 Community Development do you swear by
5:32 oath or affirmation the testimony you're
5:33 about to provide is true yes thanks
5:36 please proceed thank you chair Stanford
5:40 uh so as has been said today we are here
5:43 to talk about the Madison Lane Town
5:45 Homes uh so the there's two aspects to
5:50 this proposal um this is the preliminary
5:52 plat
5:53 24-1 and the site development permit
5:57 24-8 this is located at 800 Front Street
6:00 South and is in the Oldtown sub area it
6:04 is zoned mfh which is multif family high
6:07 and it is land use designated as multif
6:09 family residential just going to grab my
6:15 note so um the summary of this proposal
6:17 is it's two three-story buildings 11
6:20 residential units total there's common
6:22 amenity space at the rear of the site uh
6:25 water sewer storm water and Frontage
6:27 improvements in an internal access Drive
6:30 um which is entered on off of Front
6:32 Street so the site Zoning for this site
6:35 is 20 um the density allowed is 29
6:38 dwelling units per acre the site is7
6:41 Acres so a total of 20 units would be
6:43 permitted on site but 11 units um are
6:45 proposed meeting the density requirement
6:47 for the site beneath the maximum allowed
6:51 uh site and building designed all the
6:54 architectural elements adhere to the
6:56 standards both within the um site and
6:59 building design sections of our code
7:01 buildings are oriented towards the
7:03 adjacent Transportation facilities uh
7:05 all the main entries face the sidewalks
7:08 and each unit has its own separate entry
7:11 um each unit has weather protection at
7:13 its entrance there's ground level
7:15 transparency provided throughout the
7:17 development and there's no blank wall
7:19 that extends longer than 30 ft design
7:22 elements are repeated as you can see in
7:24 the exhibit there with modulation and
7:26 changes in materials um window patterns
7:29 and colors provided you can see up close
7:32 of those materials on the sample boards
7:33 going around and then the end units um
7:37 on either side of this development which
7:40 is unit 1 and 11 face the street and the
7:42 park
7:45 respectively uh parking meets all the
7:48 requirements the residential uh
7:50 requirements is 13 to 22 spaces allowed
7:54 and 22 are proposed one motorcycle space
7:57 is required and one is proposed for
7:59 bicycle spaces there was no short-term
8:01 requirement for this given its location
8:03 and use and then for longterm 11 are
8:05 required and 11 are proposed these
8:07 long-term spaces are within each unit's
8:11 garage landscaping and trees so the
8:14 whole site perimeter um has Type 3
8:16 landscaping around it um there's
8:18 specific requirements for type 3
8:20 landscaping and this includes 30%
8:22 Evergreen and uh be required throughout
8:25 and they are exceeding that with 54%
8:27 proposed um it is also requ that there
8:29 be one tree per 5,000 sare ft of
8:32 required Landscaping um and there's this
8:35 is far exceeded with one uh tree per 123
8:38 Square ft um of landscaping proposed
8:41 there are um there's a pathway at the
8:44 rear of the property you can see this
8:46 kind of just to the south of the play
8:48 area um this extends all the way back to
8:51 the rear property line with wood chips
8:53 proposed for the pathway um there is a
8:55 condition recommended regarding this um
8:58 that I will get into at the end end of
8:59 this presentation um this meets the
9:01 green necklace amenity requirement as
9:04 this uh site abuts the Rainer Trail
9:06 property um that is required for trees
9:10 it's a 35% retention requirement which
9:12 would be
9:14 182 um diameter of breast height inches
9:17 and 270 are proposed canopy coverage is
9:21 required at 33% um which would be
9:24 9,892 square ft and this is uh exceeded
9:28 by a total
9:31 26385 Square ft
9:34 proposed so this site is required to
9:37 provide community and amenity spaces
9:40 there is um given 11 units that means
9:42 1100 ft is required in 1490 ft² is
9:47 proposed um that's what's at the rear of
9:49 the site there is some passive area as
9:51 well as a play area and
9:54 benches um 30% of uh many SPAC is
9:58 required to be Landscaping this is
10:00 currently not met with how this is
10:02 proposed um but this could be easily met
10:05 by expanding the um amenity space to
10:08 include the area to the right this was
10:10 just a miscommunication between the
10:12 applicant and I have what could be
10:13 counted so it is conditioned to meet
10:15 that and I would expect them to be able
10:17 to easily meet that when they come in
10:18 for construction
10:20 permitting um we require 11 seating
10:22 units for the amenity area and 12 are
10:25 proposed and then 48 square ft per unit
10:28 of private outdoor ameni space which is
10:30 proposed with a balcony um for each unit
10:33 there's two way finding locations
10:35 proposed throughout the site and then
10:37 unit 11 is oriented towards the Rainer
10:40 Trail so that end unit on the um east
10:44 side of the property it faces out and
10:46 provides eyes on the community amenity
10:48 area and just has that interaction with
10:51 the Park
10:53 area so for Oldtown design standards um
10:57 similar to oh
11:00 Kristen you blocked my um it the front
11:04 entries are pedestrian oriented and
11:06 include weather protection and the
11:08 required architectural features this
11:10 includes things like lighting variety of
11:12 Paving patios uh low walls and Landscape
11:17 borders um Front Street transparency is
11:20 required at 15% so that's um the eye
11:24 level on the first level would require
11:25 15% be windows and uh 23% is proposed
11:30 and then the buildings do not contain
11:31 more than three main
11:38 colors um I seem to have lost control of
11:41 the main screen who's ever pulling up
11:43 the attendees sheet seems to be
11:46 controlling oh I oh there we go sorry
11:48 the attendees sheet was over top of my
11:50 presentation um so that that covers the
11:54 site development permit um in uh code
11:58 review and then the preliminary Ary plat
11:59 code review so um this is a Consolidated
12:03 review because the preliminary plat is a
12:05 level three review through the city and
12:07 the site development permit is a level
12:09 four they get Consolidated as only one
12:11 public hearing is allowed to be had when
12:13 it there's two permits um and so you
12:15 consolidate into the highest level of
12:16 review which is level four before the
12:18 development commission for review and
12:20 decision so for preliminary plat review
12:23 um the plat includes required and
12:24 appropriate Provisions for utility
12:26 streets open space and drainageways it
12:28 meets all applicable IMC standards
12:31 maintenance agreements will be recorded
12:33 with the final plat um which is
12:35 specified as recommended condition
12:36 number three and then all the lots are
12:39 developable there's no reasonable use
12:41 exception going to be required for this
12:43 and then all the unit lot subdivision
12:45 criteria are met which are further
12:47 broken down in the staff
12:50 report sea review happened in March and
12:53 a determination of non-significance was
12:55 issued three comments were received um
12:58 that sta responded to uh they are
13:00 included in your packet as exhibit U I
13:03 believe um the DNS was issued as all
13:06 impacts will be mitigated through code
13:08 requirements and the uh conditions on
13:11 this approval or the dis uh commission's
13:16 decision so following the publishing of
13:19 my staff report um the applicant
13:22 provided some comments um about two of
13:25 the conditions that um the city was
13:28 receptive to in a agreed that uh some
13:30 revisions to the condition should happen
13:32 so um condition number five wood chips
13:35 for pedestrian pathway that's what we
13:37 talked about in the south for the green
13:38 necklace amenity um when I originally
13:41 wrote the condition it was proposed to
13:43 have a requirement that the wood chips
13:45 be um kept in usable condition and
13:48 replenished annually and specifically
13:50 state that on the face of the plat as
13:52 well as the M maintenance agreement
13:54 within the cc&rs and I've revised that
13:56 to be more General that the a
13:59 requirement for maintenance of The
14:00 Pedestrian pathway shall be stated on
14:02 the face of the final plat and reference
14:04 a maintenance agreement with the cc&rs
14:07 so just making it a little more General
14:08 so simple on the face of the plat that
14:10 The Pedestrian pathway just is just to
14:11 be maintained and then the cc&rs can get
14:13 into the specifics of what that looks
14:15 like um just in case down the line if we
14:18 move from wood chips to something else
14:22 we don't have to do a plat amendment to
14:23 not allow them to do wood chips but
14:25 staff is recommending that maintenance
14:28 of The Pedestrian path way specifically
14:30 exist on the face of the plat as that
14:32 allows um the city to have
14:33 enforceability that the path be
14:35 maintained um as it is required to meet
14:39 that green necklace um amenity code
14:42 requirement and then the second is um
14:45 condition 12 and it's just a little
14:46 rewarding of the second sentence that
14:48 instead of having to provide
14:50 documentation demonstrating compliance
14:52 that the applicant um shall notify our
14:55 department of actions taken pursuant to
14:57 this condition to ensure comp clients um
15:00 and this is just in case nothing needs
15:01 to be done there wouldn't be any
15:03 evidence to show so it's just giving
15:05 just making sure that we're not backing
15:07 the applicant into a corner that they
15:10 isn't fair for them to get out of um so
15:12 that was run by our engineering
15:13 department and they agreed that the
15:14 revision to the condition made
15:19 sense thank you let me know if there's
15:21 any
15:22 questions questions on staff's
15:24 presentation
15:32 Comm Brennon and Mr just really quick um
15:34 procedural question so the this is a
15:37 level four approval permit approval
15:40 correct so it's for both the site
15:42 development permit and the pre pre
15:44 preliminary plat okay good thank
15:48 you just a general timing question so
15:51 sepa permit issued last
15:54 March and we're now in March of 25 is
15:57 that just kind of how long long it takes
15:59 to go through the whole process correct
16:02 so for this um permit we issued what's
16:05 known as an O the optional DNS process
16:07 so the sea determination was issued with
16:09 the notice of application so it was a
16:10 combined notice so it was issued pretty
16:13 early on in the process which is what
16:15 the state prefers if we can do it so it
16:17 just the process for sdp uh PP approval
16:22 takes about a year so that's just yeah
16:24 just about what the timeline takes great
16:27 thank you
16:31 other
16:34 questions I have several but they're
16:36 really on the staff report in detail so
16:39 I think I'm going to save them for a
16:40 little bit later during deliberation
16:42 time okay right thank
16:45 you thank
16:48 you now we will proceed with the
16:50 applicants presentation I will need to
16:53 swear you an uh please state your name
16:55 for the
16:57 record uh Peter derland I'm the attorney
17:00 for the
17:01 applicant thank you you swear by oath or
17:04 affirmation the testimony you're about
17:06 to provide is true I do thank you please
17:09 go ahead thank you uh good evening
17:12 Commissioners my name is Peter derland
17:14 as I just said and I'm the attorney for
17:15 the applicant uh with me is Hussein
17:18 mansuri um who is our project manager
17:21 he's going to explain some more of the
17:22 project details for you um other members
17:25 of our team include our civil engineer
17:27 Jamie Scher our architect Travis
17:30 McDonald and our entitlements manager
17:32 railan hulquist they're online um they
17:35 won't be part of our presentation but
17:37 they're here to answer any of your
17:38 questions if you have them um as City
17:41 staff has already uh provided a lot of
17:43 project details we're going to kind of
17:44 supplement um some of their findings
17:47 here um before we begin just wanted to
17:50 take a minute uh to note the approval
17:52 criteria that's before you uh today um
17:56 as staff noted it's a Consolidated level
17:58 four permit review for site development
18:00 permit and the preliminary plat uh
18:03 basically we're just here to ensure the
18:05 project complies with all requirements
18:07 under code um as the staff noted in the
18:11 report and presentation uh applicant uh
18:14 complies with all the applicable
18:15 regulations under code uh and we
18:18 respectfully ask that you approve the
18:20 project subject to conditions uh we'll
18:22 get into the two conditions that we
18:24 mentioned before uh we have a slight
18:26 difference with uh staff on condition
18:28 five but completely agree about
18:31 condition 12 so with that I'll turn it
18:33 over to Hussein to explain the
18:45 project good evening Commissioners uh
18:48 first of all uh I would like to thank
18:51 you for all just attending today's
18:54 meeting and I believe now it's time for
18:56 me just to
18:59 where okay uh we will also yes and could
19:02 you repeat your name please for the
19:04 record my name is Hussein
19:05 mansuri and do you swear by oath
19:08 affirmation the testimony you're about
19:09 to provide is true yes I do thank you
19:11 please proceed
19:13 uh my presentation will likely be
19:16 shorter than uh what Emily presented
19:19 right now and as she did a fantastic job
19:21 covering the all the keyn notes and
19:23 details of the project uh however I'm
19:25 here to answer any questions you may
19:27 have and also have my team members I
19:30 have Jamie our civil engineer here and
19:32 also as Peter mentioned we have Travis
19:34 architect and U our uh entitlement
19:37 manager railand just join online for
19:40 more detailed question if you guys have
19:42 any uh can I just move next one and uh
19:47 the property is currently awakened and
19:49 when we first saw this it uh we
19:51 recognized the opportunity to uh for to
19:55 improve the property this is and make
19:58 the space uh into a place where people
20:01 can leave and own homes throughout the
20:03 design process we work closely with
20:05 Emily and the city staff uh to ensure
20:08 that the project lines with the needs of
20:09 the neighborhood while also complying
20:11 with all necessary requirements per city
20:13 code our goal has always been to create
20:16 a product that feels like blank to the
20:19 neighborhood
20:21 one and uh as you can see from the side
20:26 plan Evolution Slide the project team
20:28 has
20:29 has uh responded to all comments
20:32 suggestions and requests made during the
20:34 review process to the develop a site
20:37 plan that complies with the zoning codes
20:39 and aderes to the guidelines set for the
20:41 Old Town neighborhood in response to the
20:43 comments that we received from the
20:45 city uh over the last year uh we've made
20:48 some key adjustments resulting reducing
20:51 the unit Counts from 12 to
20:53 11 and uh the front Improvement now
20:57 includes a new f 5 foot planter strips
21:00 along the uh Front Street South behind
21:04 the sidewalk as well as a ride we
21:09 dedication uh and also as you can see
21:13 here uh we do have the uh Amin space
21:16 located on the Eastern portion of the
21:18 property and uh also we provided uh a
21:24 pathway from the uh very end of the uh
21:29 close to the unit 11 all the way to the
21:32 Eastern property line uh to meet the
21:35 connectivity because of the having the
21:37 trail on the east side of the
21:39 property next slide and uh here is the
21:44 final site plans as you can see we have
21:47 two buildings 11 units uh total of 22
21:50 parking spaces and one guest
21:54 parking which can be uh designated as
21:59 back which will be designated as uh temp
22:03 loading and unloading uh during a
22:05 specific time during the day from 9:00
22:07 a.m. to 5:00
22:10 p.m. and uh all the units will be
22:13 accessed from the front of the street
22:15 from front of the buildings and except
22:17 two units uh unit one will be accessed
22:20 from the uh directly from the uh front
22:23 uh Front Street South and unit 11 will
22:25 be accessed from the east side of the
22:28 building
22:29 uh facing the Amin
22:32 space and also we've made sure that this
22:34 layout is f pedestrian friendly with a
22:38 clear connection from Front Street to
22:40 the interior of the project ensuring
22:42 ease of access for all residents and
22:45 visitors next slide
22:48 please and you've seen the elevations
22:51 before this is the building elevations
22:54 for building a and we've worked hard to
22:57 ensure these design fit within the uh
23:00 codee while also creating a project that
23:02 we can be proud of and I believe we
23:04 struck a good balance between the design
23:06 and the Code
23:09 Compliance next one
23:11 please and here is uh another couple of
23:15 elevations for Building B which is
23:17 located uh on the interior side of the
23:21 building interior side of the side and
23:24 next slide
23:26 please uh here is uh two conditions that
23:30 we would like to propose minor changes
23:32 and uh Peter can just take it from here
23:35 he's just going to go through the
23:36 changes that we
23:40 expect and I believe I'm still swor
23:43 in um so like I said before condition 12
23:47 uh we agree this is the same language
23:49 that uh you saw from the um updated
23:52 staff report um our only contention for
23:56 condition five is um um that it could
23:59 lead to problems down the road if we
24:01 includeed on the plat so that's the only
24:03 thing that uh we'd like to remove there
24:06 um we would still be required to
24:09 maintain it uh in the CC andrs because
24:12 it's still a condition of this
24:14 development however um we we just we
24:17 just think it'd be a lot simpler to keep
24:19 it off the final plat it can uh lead to
24:22 a lot of uh issues down the road I've
24:25 seen um plats from many many years ago
24:27 come back up and then the property
24:29 changes and then there's something else
24:31 that you have to go through uh such as a
24:32 plat Amendment which can get kind of
24:34 complicated and so we just want to avoid
24:36 that for any future owners um as we when
24:40 I was looking through code we think that
24:42 uh IMC
24:45 18346 D3 um is generally how this is um
24:50 being implemented the language there
24:52 says joint use agreements and
24:53 maintenance agreements as necessary to
24:55 include uh on the face of the plat we
24:58 think the ccnr uh provision um meets
25:02 that standard but that's the that's the
25:04 only change that we would have here and
25:06 happy to answer any questions that you
25:07 guys
25:14 have chair could you give the reference
25:17 again the code reference you just gave
25:19 sure uh 18 uh
25:23 060
25:27 D3 thank you
25:50 yeah while we looking that up and we may
25:53 come back to that question in a moment
25:56 uh we had some public comments
25:59 regarding uh control of storm
26:02 water in the uh staff report this is
26:05 section
26:07 13 um there was a letter from samamish
26:11 Plateau water regarding the storm water
26:13 system and a response to that in the in
26:17 the uh staff
26:18 report and also in the esa there's I
26:23 guess that's page 236 of
26:26 1043 it says based on site observations
26:29 and a review of the topographic map the
26:31 overall gradient appears to slope
26:33 slightly to the west of the property
26:35 surface water drainage is expected to
26:37 flow West but your sheet A2 seems to
26:40 show the opposite I'm not sure my
26:42 overall question is how can we ensure
26:44 that runoff from pollution generating
26:47 impervious service will be captured for
26:49 Bio retention I wonder if you could talk
26:52 maybe this is not the appropriate time
26:54 or maybe someone else can speak to this
26:57 but can you walk through the bio
26:59 retention and uh capture of impervious
27:02 surface runoff for us please in the
27:04 design uh sure so yeah I I am not the
27:08 expert on that so I can't run through
27:09 that for you I will say uh just on a
27:12 procedural level uh we did um address
27:15 that with the letter and so that's part
27:18 of the site conditions for approval here
27:20 but I can let um could let our expert
27:23 actually speak on that
27:31 thank you and if you could please
27:33 introduce yourself and I'll swear you in
27:35 uh my name is Jamie schroer I am civil
27:37 engineer with cph Consultants thanks do
27:40 you swear by oath or affirmation the
27:41 testimony you're about to provide is
27:43 true yes I do thank you pleas great um
27:47 you'd mention the the existing Topo of
27:50 the
27:50 site um it does go east I think that is
27:54 a typo talking about going west okay
27:56 because everything falls toward the
27:58 trailes to that side um in
28:02 general um the Topo and the the design
28:05 of the road is going to fall to the West
28:07 as well um so the pollution generating
28:10 portion which is the roadways driveways
28:13 all that that cars will drive on um
28:16 that's going to surface drain it it
28:18 basically goes U to the South along the
28:21 curb there's a curb cut and if you in
28:25 the let's see
28:29 sorry in the drainage plan you can see
28:32 there's a bar retension toward the end
28:34 of the driveway or toward the end of the
28:36 drive and that's that's collecting all
28:39 the surface drainage that's pollution
28:40 generating I wonder if we could see the
28:43 sheet the details the the retention
28:46 water retention there's one sheet that
28:49 specific Fus be sheet six of 22
29:03 right yeah so as you can see on this the
29:07 the track 99 what is it 999 that
29:10 includes the drive out the main Drive um
29:14 the sidewalk is at grade as well because
29:16 all the driveways to have a curb go up
29:19 and down there's just too many driveways
29:21 real close so the sidewalk is at grade
29:23 and then you have those driveways that
29:26 go off to each individual unit
29:28 um so the the driveways would flow away
29:31 from the buildings getting back to that
29:34 tract and then flow to the west and we
29:38 basically pitch everything to the
29:40 opposite opposite side it may go to the
29:43 center there's a there's a
29:45 CB um that you can
29:47 see there's it says flu line a little
29:50 bit to the right of your cursor there
29:53 but that's all flowing there and all of
29:56 that area collects and goes to the bio
29:59 retention which provides the water
30:01 quality which is a enhanced BMP for
30:04 water
30:05 quality okay and how about capture
30:07 toward the back of the property um that
30:10 that part is flowing back so it actually
30:12 kind of has a low point between the two
30:15 buildings so we will flow a portion of
30:18 that back to the east I'm sorry to the
30:22 West so we're flowing away from Front
30:25 Street um to about the end of unit six
30:29 there's a catch Bas in in there and then
30:32 the remainder of that drive is going to
30:33 come back um to the west and all that
30:37 will collect in that CB and then go into
30:39 the bio
30:40 retention okay thank you appreciate
30:44 that Mr chair can I have a quick
30:46 follow-up question on that yes I recall
30:48 the letter that you're referring to from
30:50 the sanish water and SE folks was
30:55 that um discharging into the groundwater
30:59 was their concern and so this system
31:02 still does that is that correct yeah
31:05 we're in a critical area uh recharge
31:07 area um and it's I I can't remember I
31:11 think it's split between a one and a
31:12 three however that works with the map
31:15 but we're kind of on the border of it um
31:18 but part of those conditions are um to
31:21 provide water quality for it which is
31:23 enhanced which we're doing with the bio
31:24 retention so everything that's pollution
31:27 generating um we'll go through that W
31:29 water quality and that bow retention the
31:32 remainder you can see to the very West
31:34 there's a trench so that's an
31:36 underground berri trench that's Rock for
31:39 infiltration and that only takes the
31:41 roof areas which are clean okay thank
31:45 but all of it infiltrates and finally to
31:48 clarify that the city does permit
31:50 infiltration in this particular instance
31:53 is that correct CH s so our storm water
31:55 engineer um with the city responded to
31:57 some am plateau and they exchanged um I
32:00 was on a couple emails back and forth
32:01 and it ended up with some Amish Plateau
32:04 being fine with what what was proposed
32:06 and um them and the our storm water
32:08 engineer uh with what is proposed by the
32:11 applicant
32:14 so other comments
32:23 questions commissioner
32:25 Morgan did you have one commissioner
32:27 morg
32:30 yeah I guess the question if you can go
32:32 back to the um the proposed changes to
32:43 the uh and I guess sorry uh before your
32:45 question I'd also uh just draw your
32:47 attention to in the public comments um
32:50 part of how we're addressing this is
32:52 this isn't the final uh design we would
32:55 still have to go through another round
32:56 of approval and part of what the
32:59 infiltration uh condition under I
33:01 believe it's 10 uh that's partially what
33:04 it's what it's there to address but
33:06 sorry okay so um could you pull up your
33:08 changes again to commissioner Moran you
33:11 want to see the applicant's changes the
33:13 applicant recommended changes correct
33:16 okay
33:23 last sorry give me one moment
33:30 nope that's the wrong
33:51 one so so the change would be that the
33:53 wood chip the maintenance of the trail
33:56 stated as a maintenance agreement within
33:58 the
33:58 ccnr and and if I understand right you
34:01 said it was 18
34:03 34060
34:05 d uh yes I believe
34:09 so so the the recorded unit subdivision
34:12 must
34:13 include and item three says joint use
34:15 agreements and maintenance agreements as
34:17 necessary MH
34:20 so the recorded unit subdivision so it
34:25 but you said but you don't want it on
34:26 the on the face of the plat but the so
34:30 this would put the a reference to the
34:33 ccnr agreement for the maintenance on
34:36 the face of the plat just not
34:38 specifically um just not specifically
34:41 this condition the one condition yeah
34:43 then a question for you can the cc&rs be
34:45 changed by the
34:46 homeowners uh yes they can okay are
34:50 there so theoretically could the
34:52 homeowners go in and change the ccnr and
34:55 say we don't have to maintain that trail
34:56 anymore I believe they could um and but
35:00 so part of this change is I believe um
35:03 we would still need to have everything
35:06 that's within those ccnr especially if
35:08 we have the wood chips for pedestrian
35:10 pathway reference for that ccnr uh on
35:13 the face of the
35:15 plan okay if if that makes sense um I
35:18 guess so but if it's referenced on the
35:20 ccnr but if they change the ccnr saying
35:22 they don't need it
35:24 anymore
35:26 then some body could look at ccnr say we
35:29 don't have to do that anymore uh there
35:31 is some potential for that yeah is there
35:34 a way to force something to remain in a
35:37 ccnr um yes uh I don't know off the top
35:41 of my head exactly how we would um
35:43 continue that but this would still be as
35:46 as proposed this is still going to be
35:48 part of the conditions for development
35:50 so we need to have that within the ccnr
35:52 when we when we draw them up yeah
35:55 curious if there's a there's a way to
35:57 state that there are some parts of a
35:59 ccnr that could not be changed by
36:02 homeowners I don't
36:07 know Mr chck and I followup question on
36:10 M Bren um can you talk a little bit more
36:13 about what the concern is I mean ongoing
36:16 maintenance is is the requirement yes
36:20 and um you know it's not an honorous
36:22 requirement no so I I just I'm trying to
36:25 understand what the concern is to have
36:27 that
36:28 condition which is specified in the code
36:30 stated on the plat yeah yeah so the the
36:33 concern there is that um if there is
36:35 going if if we need to transition away
36:39 from that on the property at any point
36:41 in time after this you would need to do
36:43 a plat Amendment which is a very
36:45 honorous and complicated process we just
36:47 kind of want to avoid that for the
36:48 Future Property Owners we have no issue
36:51 with this condition we just want to make
36:53 sure that the plat is is clean once it's
36:56 um once it's approved
36:59 so it um my understanding following up
37:01 to commissioner Morgan's question about
37:03 ccnr is that that is really in the
37:05 control of the homeowners the city
37:07 doesn't have a role once uh in the
37:10 process of creation and or Amendment
37:12 future Amendment so the this amendment
37:16 would take the city out of the loop if
37:18 there was a future Amendment to the ccnr
37:20 that changed that condition uh yes that
37:25 correct and again these are our proposed
37:27 changes um
37:29 understand thank
37:31 you wonder if there could be a separate
37:33 maintenance agreement not in the ccrs
37:36 that does specify this requirement that
37:38 is not and referred to from the surface
37:40 of the
37:42 plat that is also possible and the
37:44 applicant would be agreeable to such
37:46 such a thing we'd have to discuss with
37:48 the city of course
37:52 but any other questions for applicant
38:02 commissioner does
38:04 this the extent of the questions here
38:06 the presentation he doesn't get into the
38:08 further into the design we can you can
38:11 ask either now and we'll have another
38:13 opportunity during deliberation
38:14 commissioner so you could do questions
38:17 now or
38:18 later I I just have a general question
38:21 about parking um you know when people
38:24 have guests over you you've only got
38:26 maybe two spots in the driveway um
38:29 probably taken up by your personal
38:31 vehicle where where are the guests going
38:33 to park and are they allowed to park
38:36 along Front
38:41 Street sorry would
38:46 you so technically we have three parking
38:48 spots one on the driveway and two inside
38:51 the building inside the building there
38:52 would be tandem parkings so each
38:54 building has two parkings inside the
38:56 building at at the first floor the
38:58 ground floor and there is driveway which
39:00 would be available for any
39:02 guest and then the a followup is there
39:05 an ADA requirement for like a specific
39:09 Ada
39:10 spot we did not have any re any
39:14 requirements for the Ada yeah realizing
39:17 this is in a public space so I'm not
39:18 sure it's requirement or
39:21 not I don't believe so but at building
39:24 permit our building plans examiner will
39:26 review for ada8
39:29 requirements and then the this is kind
39:32 of directed to civil also um I assume
39:36 that trash pickup and um fire truck
39:40 turnarounds have all been encountered
39:41 for uh trash would be uh trash cans will
39:45 be placed inside the building there's a
39:48 designated area and during the days that
39:50 needs to be picked up they will be
39:51 brought up on the street and then taken
39:53 inside inside the garage so we have
39:55 designated area at the back side of the
39:59 uh I mean once you get in the inside the
40:02 garage it's going to be on the back so
40:03 that's they where they're going to keep
40:05 it I guess I'm just thinking from uh uh
40:08 the trash pickup companies sure so the
40:11 firet truck turnarounds in the plan set
40:13 and then we require um rology to sign
40:15 off on the pl and they do that during
40:17 the construction permitting so we have a
40:19 form that rology has to approve and sign
40:21 off
40:24 on then getting back to the storm water
40:27 um was there is there a requirement with
40:30 the city as far as capacity I mean if
40:33 it's a 10year storm or is it is it a 25
40:37 year then if it does exceed that I
40:40 assume just Overland flows to the creek
40:43 below or that drainage area to the
40:50 east uh correct the the city has
40:53 requirements for flow control that are
40:55 in the doe manual as well as there to
40:57 the storm water manual um flow control
41:01 technically you have to do from half the
41:03 2year half the 2-year Peak to the
41:06 50-year is what you have to meet
41:09 pre-existing conditions on um in this
41:12 case we're fully infiltrating so we have
41:14 soils conducive to infiltration so we
41:17 expect everything would fully infiltrate
41:20 but if something didn't like you said it
41:22 would continue and i' get my directions
41:25 mixed up but toward the railroad tracks
41:28 would flow that way if some but we don't
41:30 expect it would we're expecting it fully
41:32 infiltrate given the rates did um I did
41:36 notice that you had a very low water
41:38 table so you're probably right
41:42 um there was a comment about an adjacent
41:45 property with settlement issues I
41:46 noticed that the Geotech report only had
41:49 anticipated settlement of a half an
41:51 inch uh that's kind of outside of my
41:53 expertise
41:54 so probably would have to point back to
41:57 the Geotech report okay thank you thank
42:03 you any other questions
42:09 applicant I want I think I'll get into
42:11 it at this time instead of saving all
42:12 these for later uh Mr Hussein maybe may
42:15 be the most appropriate for this I'm
42:19 looking at uh sheet
42:21 two uh I'm I'm sorry applicant sheet
42:24 A2 in the packet um that building a west
42:30 elevation if we could pull that one
42:35 up so this would be the elevation that
42:38 faces Front Street from the first
42:40 building
42:53 okay right and looking at the West there
42:56 yeah the right the Front Street facing
42:58 that's lower right I guess
43:00 yeah so I guess my questions are trying
43:03 to get to your sense of the practicality
43:07 of these things um is the are there any
43:11 accent colors used in this design I know
43:13 they you're restricted to three primary
43:15 colors but did you consider any accent
43:17 colors for the
43:19 design uh I think it would be best if my
43:22 architect answer your questions which we
43:24 have him available online okay fine Mr
43:26 Travis
43:28 yeah my questions will be in the same
43:29 general yeah
43:36 area all right can you hear me yes okay
43:40 do I need to be sworn in for this uh yes
43:42 please take your name uh Travis McDonald
43:46 and you swear by o through affirmation
43:47 the testimony you're about to provide is
43:49 true I do yes thank you please go ahead
43:53 and Travis excuse me I have made you a
43:56 panel now so if you'd like you can turn
43:58 your camera on as well oh
44:04 okay there we
44:06 go um you're correct accent colors are
44:10 permitted uh in the Oldtown overlay
44:12 District here we did not propose any any
44:15 strong accent colors for this project
44:16 though we we kind of wanted to keep this
44:18 a little bit toned down um go with Warm
44:21 Neutral earth tones for the three uh
44:23 primary body colors and use um kind of a
44:26 dark uh charcool uh color for our
44:30 trim and um looking at the top Windows
44:34 there in the portion to the right are
44:37 those undivided Windows they appear to
44:39 be those top two windows on the right
44:42 side correct yeah all our all our
44:44 windows are proposed currently without
44:47 um simulated divided lights in them okay
44:50 did you consider division for those
44:52 windows or would there be a problem with
44:54 that um we could certainly cons consider
44:58 um this is just my opinion but um often
45:02 times those those tend to look a little
45:03 dated um but but we could certainly
45:06 consider it and see um how that might
45:08 affect this
45:09 elevation okay and I don't know if this
45:12 is the best sheet maybe sheet C1 it
45:15 shows details of the entrances we see at
45:18 B there's a 21in high concrete seal wall
45:23 that appears on most of the units uh
45:26 that are inward facing
45:27 is that same wall used on the west end
45:32 and the East End of these two buildings
45:35 or is that that same wall there or not
45:39 it is not is only it is only for the
45:41 private Drive facing entryways um these
45:44 ones have a have a different set of
45:46 features this one um the entryway for
45:48 for this street facing unit here is
45:50 lined with Landscaping not landscape
45:53 borders right and those are those are
45:55 all shrubs correct they're they're no
45:57 trees in that lining I think did you
46:00 consider using that uh 21in seal wall as
46:04 a opportunity for more variety as well
46:07 as Unity with the rest of the
46:09 design we did not um we we wanted to
46:12 maintain as a direct um pedestrian
46:15 Pathway to this entryway as possible um
46:17 for um just for visibility to the
46:20 entryway um so to incorporate a seat
46:22 wall like that um potentially would have
46:25 had us offset the entry um or offset the
46:28 pathway I should say um so it seemed
46:31 that the the landscape border was was
46:33 the preferred option for these um just
46:34 given their street facing nature okay
46:37 thank you that's all I had about that
46:38 thanks
46:42 okay any
46:43 [Music]
46:51 others since we have the AR since we
46:54 have the architect I'm just curious on
46:56 that same I guess if
46:57 you if you could scroll to the left a
47:00 bit showing the yes so that I think no
47:04 no no down below yeah the I guess the
47:06 rear elevation for those units it it
47:09 just sort of jumps out at me those um
47:12 the the T the lighter colored twostory
47:16 tall sections of the building um they
47:21 seem like a a very
47:25 tall you know light colored with nothing
47:28 there and did you consider the
47:31 possibility of some kind of band within
47:33 there to break up that
47:36 elevation um that that could be possible
47:39 you know we we tried to be a little lean
47:42 towards the modest side since this is
47:44 the rear elevation it is yeah heavily
47:47 screened from adjacent properties with
47:49 you know dense proposed Landscaping
47:50 along the property line so you know
47:52 again we're we're trying to be modest
47:54 with our treatment back here um uh
47:57 additional banding could could be a way
47:59 to further uh break those up but um okay
48:02 we weren't sure it was necessary I don't
48:04 I don't yeah and I don't think it's
48:05 necessary because of all the Landscaping
48:07 to be there but it's I guess at least a
48:08 suggestion for considerations thank you
48:12 appreciate that
48:15 yes other questions for
48:21 applicant hearing none thank you now
48:24 we'll move into the public comment
48:26 portion of the hearing uh Miss Jackson
48:29 has anyone signed up to comment on this
48:31 topic no
48:33 chair and no commenters signed up online
48:39 either no chair okay thank you so we can
48:43 skip the rebuttal section uh applicant
48:46 has no rebuttal to the comments that
48:47 were not
48:48 made so Commissioners are there any
48:51 objections to closing the public hearing
48:53 at this point
48:56 hearing no objections I'll now close the
48:58 public hearing at 7:21
49:03 p.m. so now it's time to move on to
49:05 deliberation portion of the meeting but
49:07 first we need to make a motion is there
49:10 a motion on the item before the
49:11 commission Mr chair Mr brenon I move
49:14 that the development commission approve
49:16 the preliminary plat and the site
49:18 development permit for Madison Lane Town
49:20 Homes numbers PP
49:24 24001 and sdp
49:29 24008 as described and evaluated in the
49:32 staff report dated February 26
49:35 2025 with exhibits U or a through U
49:39 subject to with the conditions therein
49:41 with amendments to conditions 5 and 12
49:45 as provided in tonight's staff
49:48 presentation I also move that the
49:50 development commission direct the
49:51 community Planning and Development
49:53 Department to prepare findings of fact
49:55 and conclusions
49:57 for the review and approval by the
49:59 development commission chairman
50:00 affirming the development commission
50:02 decision to approve the Madison Lane
50:04 Town Homes approval numbers pp24
50:09 00001 and sdp
50:14 24008 subject to the conditions listed
50:17 in the staff report dated February 26
50:20 2025 with exhibits a through U subject
50:24 to the conditions herein as uh with the
50:27 amendments to uh conditions 5 and 12 as
50:30 provided in tonight's uh staff
50:33 presentation and um as further amended
50:37 tonight if changes are made during
50:40 deliberations do I have a second
50:44 second second thank you is there a
50:48 discussion of the
50:52 motion um Emily could you pull up the
50:57 revised
50:58 Amendment or revised conditions
51:12 yes so I guess a question of the
51:15 revision that the applicant had for
51:19 condition
51:25 five I I feel it should remain on the
51:27 plat for the code
51:37 M Mr um Comm
51:39 Bren I understand the concern expressed
51:43 by the applicant um regarding having
51:46 something on the plat because that is a
51:48 fairly arduous process to go through
51:50 especially uh when you've got multiple
51:52 owners um once this project um is
51:55 completed
51:57 uh but that being said the language of
51:59 the code is fairly specific here too
52:01 regarding maintenance agreements um
52:03 being stated on the face of uh recorded
52:07 documents or recorded plats I guess my
52:09 concern is that I guess I two points one
52:11 that I made earlier is I don't think
52:12 this is an an honorous condition and I
52:15 don't know that it would change into the
52:16 future much I think this would be a
52:18 fairly um a fairly simple thing to do
52:23 over time uh and I this is going to be a
52:26 fair stable development um from what I
52:28 can see uh and uh the city's out of the
52:32 loop if the condition is just recorded
52:36 as part of the ccnr so I would agree um
52:40 with the condition as drafted by
52:47 staff and yeah Comm Mor I'm sorry um I
52:51 think I would agree the same thing in
52:53 reading the language says a recorded
52:54 unit lot subdivision must include
52:57 maintenance agreements as
52:59 necessary and just have a hard time
53:02 figuring out how you work around that
53:04 language so I would agree that should
53:07 stay as
53:19 stated should we have a motion to conf
53:22 affirm the condition as stated
53:28 uh Mr chair uh the motion included the
53:31 the staff proposed amendments to the yes
53:35 uh conditions so it's already in the
53:37 motion we've already covered it yeah
53:38 thank
53:41 you other
53:46 comments had a question I guess for
53:49 staff this would
53:52 be um looking at the transpo group here
53:56 review approval letter that's page 71 of
53:59 1043
54:32 great yes thanks so it says we request
54:35 the applicant provide a site distance
54:37 analysis of the driveway as part of
54:39 their site plan
54:40 application so my question is is that
54:43 represented as the site triangle that we
54:47 see on sheet C
54:49 2.0000 and others or do we need a
54:52 condition for this I believe it is shown
54:55 through that
54:56 okay and so the site triangle covers
55:00 this request site distance correct site
55:03 distance triangle covers was reviewed by
55:05 our CPD engineer okay thank you and then
55:08 I have another on code 18.
55:14 700.00 windows and doors for
55:20 multifam right
55:35 18700 what was the rest of that 70000
55:38 18700 100 all right do you want me to
55:41 share that on the screen uh yeah
55:49 please that's right hope it is I'm
55:52 looking at
55:55 B4 undivided Windows right divided
55:59 Windows must be used as appropriate to
56:01 the architectural style of the building
56:04 so uh as I asked before I'm kind of
56:06 looking for opportunities to add some
56:08 detail to the Front Street facing facade
56:11 there uh I wonder how we um did Staff
56:14 first of all uh consider this
56:17 requirement and I wonder how we
56:19 interpret as appropriate would one
56:22 divided window on the site be
56:24 appropriate or um
56:26 how do how do we meet the intent of this
56:29 sure um staff um concluded that it
56:31 complied as there was divided Windows
56:33 provided with the development but of
56:36 course when it comes to design there in
56:38 some of our design standards there is
56:39 some ambiguity to what exactly that
56:42 means um as appropriate so the
56:45 commission is always uh welcome and able
56:48 to add a condition if you would like to
56:50 see more divided Windows added to the
56:53 development thank you and I guess
56:57 commission um I'm having a little
56:59 trouble with the West End of building a
57:02 and it's facing on Front Street and the
57:04 sidewalk there and I'm wondering about
57:07 whether we've met the requirement for uh
57:11 an engaging and interesting uh side to
57:13 the street
57:15 there so the intent I think is
57:19 development should display an appealing
57:21 visually engaging Street Edge on all
57:23 sides that face streets avoiding a
57:25 backside appearance
57:26 so I'm looking at anything we could we
57:28 could do there uh wonder what your
57:31 opinion is on dividing some of those
57:33 windows there especially the ones the
57:35 the two upper
57:41 windows it's the one on the the bottom
57:43 right there
57:51 yeah um M morning um I guess what does
57:56 stand out to me is not necessarily the
57:58 divided windows but there's a fairly um
58:01 good siiz blank wall portion below the
58:04 two upper windows and the lower to the
58:06 right if there was another window added
58:08 in that area would that be the
58:11 requirement well you know uh I think the
58:14 requirement as written could have two
58:18 interpretations um that I I believe the
58:23 requirement said that structures must
58:25 have divided Windows as approp and the
58:29 decision is made as appropriate to the
58:30 architecture right so it doesn't
58:33 necessarily say that divided windows
58:36 will not be used it says simply that
58:39 they're used in a way that's appropriate
58:41 to the design yeah so I personally would
58:45 like to see a bit more variety in that
58:48 side and I wonder if anybody else had
58:49 that
58:50 sensor and yeah I agree about the blank
58:53 space there however it's less 30 ft
58:57 right the blank that blank
59:02 wall commissioner price uh well I would
59:05 I would have two comments I I guess the
59:07 first is is this is this engaging and is
59:09 there visual interest for this facade
59:11 facing this elevation um you know
59:15 arguably you don't you don't experience
59:17 the world in elevation you're going to
59:18 be driving or walking by this and I
59:21 think they did a good job of how they
59:24 designed the front the back and this
59:28 facade so you're you're going to see
59:30 that first third of the building as you
59:33 pass and then this elevation and then
59:36 coming the other way you'll see the back
59:37 you know you experience the world in 3D
59:40 so I think in in if you look at it in
59:42 that context I think it does a good job
59:44 and achieves so and
59:47 then are the windows appropriate to the
59:50 style that's a function of what style is
59:51 this building this is a you know I don't
59:55 know it's a quasi
59:58 traditional um leaning to contemporary
1:00:01 it's it's a it's a quiltwork of styles
1:00:05 that uh uh MO is very code driven has
1:00:09 pushed most buildings to look like this
1:00:11 and um I don't know if that's the
1:00:13 desired outcome I don't think it's an
1:00:14 unattractive building but it's not a a
1:00:18 traditional building in the true
1:00:20 traditional sense it doesn't fall under
1:00:23 under any of the other categories that
1:00:25 we we sometimes engage which is is it is
1:00:28 it arts and crafts is it Craftsman is it
1:00:30 Grange you know the there's no style
1:00:34 required here so therefore H you know I
1:00:38 think it's kind of up to them to a
1:00:40 degree um I think it does a good job of
1:00:44 meeting the Oldtown standards uh but I
1:00:47 don't I don't feel like it needs to go
1:00:50 as far as as having divided lights I
1:00:54 would also say and this is more of my um
1:00:57 pessimistic view is that buildings of
1:00:59 this quality aren't going to have
1:01:01 Windows of a certain quality that have
1:01:04 nice looking divided lights they're not
1:01:06 going to look that good um
1:01:09 so I would I would in my opinion I think
1:01:13 this is
1:01:16 fine any other
1:01:19 comments uh this is why I don't comment
1:01:22 on architecture
1:01:28 commissioner brenon uh Mr chair just a
1:01:30 quick comment I um kind of leaning to
1:01:33 commissioner price did a nice job
1:01:35 providing a characterization of what the
1:01:36 experience will be like I don't know
1:01:38 that divide divided Windows would make a
1:01:42 significant difference one way or the
1:01:44 other in this particular elevation of
1:01:46 those two upper Windows um so I'm I'm
1:01:50 satisfied with the design as presented
1:01:54 um uh understand the interest in trying
1:01:57 to break this up a little bit but you're
1:01:59 going to see more than just this
1:02:01 elevation as you're looking at this
1:02:03 development so um I'm comfortable with
1:02:06 this thank you okay good and I think
1:02:08 that the trees and the Landscaping are
1:02:10 really strong feature of this design and
1:02:13 you'll see a lot of that in this design
1:02:14 so that helps as
1:02:17 well any other discussion
1:02:21 comments Mr Rada I have a question for
1:02:24 staff um on the transportation study it
1:02:27 noted 77 trips and it didn't require a
1:02:30 traffic study um what what number of
1:02:34 trips would drive a traffic study that
1:02:36 was uh under
1:02:38 the Kimberly horn or Kimmy kimle horn
1:02:44 document give me one second to pull up
1:02:47 what you're looking at so I can make
1:02:48 sure I'm on the same page
1:02:59 um so the traffic study or excuse me our
1:03:02 traffic impact analysis when you have to
1:03:03 go from a traffic memo to a full-blown
1:03:05 traffic impact analysis I believe is
1:03:07 driven by PM peak hour trips versus um
1:03:10 total new trips if I'm correct yeah so
1:03:13 um since it's only six new PMP go trips
1:03:15 it didn't trigger the need for um a
1:03:18 full-blown traffic impact
1:03:20 analysis what's the is there a number
1:03:23 though that I could there is a number I
1:03:25 want to say
1:03:26 it's 30 I want to say it's 30 um I am
1:03:31 happy to ask our traffic engineer and
1:03:33 email you the answer to that one I
1:03:35 thought if it was eight there might
1:03:38 be I believe I believe it's higher than
1:03:40 that okay thank
1:03:44 you commissioner Bron yeah just a quick
1:03:47 followup so we we did on traffic so we
1:03:50 did receive comments and most of the
1:03:51 comments from the public were related to
1:03:53 you know the traffic on Front Street and
1:03:56 you know what's the city doing to
1:03:58 provide some relief is there anything
1:04:00 that you can tell us this evening that
1:04:03 would kind of respond to what the city
1:04:06 is doing uh to provide some relief on
1:04:08 Front Street sure um I can shed some
1:04:11 light on how we go about this and I'll
1:04:13 let Kristen jump in if she has more to
1:04:15 add to it so essentially when any devel
1:04:18 new development Redevelopment or change
1:04:20 in use comes into the city we require
1:04:22 they submit for what we call a
1:04:23 transportation concurrency application
1:04:25 um and that's the transportation
1:04:27 concurrency certificate that's one of
1:04:28 the exhibits so that con permit has to
1:04:31 come in with the development application
1:04:33 and when that comes in it's um has the
1:04:36 it manual the traffic uh Manual of the
1:04:39 different types of uses and they fill
1:04:41 out how many new um PM peak hour trips
1:04:45 are being um uh generated by this use
1:04:49 and then the city has what we call a
1:04:51 trip bank which has all of the available
1:04:53 number of trips um we have a trip bank
1:04:56 for Central isqua and a trip bank for
1:04:58 areas outside of Central isqua and a
1:04:59 trip bank for our Das separately I
1:05:02 believe um so then those trips are
1:05:04 deducted from the trip trip bank and the
1:05:08 trip Bank makes sure that our um streets
1:05:11 don't fall below level of service
1:05:13 standards which for the Citywide is a
1:05:15 level of service D that's our required
1:05:18 level of service standards with a couple
1:05:19 intersections are allowed to fall a
1:05:21 little bit more below that that's in our
1:05:22 code so um the there has to be enough
1:05:26 trips if there's not enough trips you
1:05:28 don't get your development so um that's
1:05:31 essentially the conclusion here is there
1:05:32 was enough trips in the trip bank for
1:05:34 them to be issued their transportation
1:05:35 certificate which means that this
1:05:38 development is not going to cause um the
1:05:41 impacted streets and intersections to
1:05:42 fall below the city's standard level of
1:05:44 service great uh thanks for that and and
1:05:47 I do just uh bigger picture there's a
1:05:50 significant project underway out in uh
1:05:53 at The Interchange of Highway 18 in a
1:05:55 lot of the trips coming through isqua
1:05:58 along Front Street and now Hobart Road
1:06:00 are heading toward Highway 18 so um I
1:06:03 know the city the mayor and council
1:06:05 members were very active in getting that
1:06:07 project funded and so hopefully that
1:06:09 will provide uh some noticeable relief
1:06:12 uh when that is completed uh in the next
1:06:14 year or so so but yeah uh transportation
1:06:18 is the focal point for just about every
1:06:20 development I think that comes before
1:06:22 the commission and probably before in
1:06:24 front of the staff so thanks for the uh
1:06:26 information appreciate that
1:06:29 absolutely thanks commissioner and staff
1:06:31 I think it's important to have that as
1:06:32 part of the record
1:06:34 than any other
1:06:36 discussion regarding the main
1:06:41 motion M
1:06:46 Morgan hearing no further discussion
1:06:48 with deliberation concluded it's time
1:06:50 for the commission to take action on the
1:06:52 item before us and we're voting on the
1:06:54 main motion to remind us as commissioner
1:06:56 Brennan stated uh we're not going to um
1:06:59 force him to restate the entire long
1:07:01 motion but I think we're clear what
1:07:03 we're voting on all in favor of the main
1:07:05 motion say I I all opposed no the motion
1:07:10 is approved
1:07:12 unanimously this concludes the Madison
1:07:14 Lane Town Homes preliminary plat and
1:07:16 site development permit notice of
1:07:18 decision will be issued by staff within
1:07:21 7 Days moving on to city council updates
1:07:24 i' like the staff to to provide any
1:07:26 updates on city council
1:07:28 activities I don't have any updates for
1:07:30 you tonight oh okay too bad we have all
1:07:33 this time and no updates are there any
1:07:35 other items of business or announcements
1:07:37 from staff okay thank you thanks the
1:07:40 staff and the applicant and there being
1:07:42 no further business before the
1:07:44 commission I adjourn the meeting at 7:39

Attendance

Council / Members (5)
Sanford
Commissioners Brennan
Ikeda
Morgan
Price
Staff (2)
Christen Leeson, Principal Planner Amanda Jackson, Meeting
Records Assistant Emily Medina, Associate Planner 2. Approval of Minutes a) Minutes of January 15, 2025