Black Nugget Wall Project COM 0058

2 stops across 2 bodies · Jun 24, 2024 → Jun 24, 2024

Timeline

Each card is one meeting where this item was discussed, oldest first.

Jun 24, 2024 Mobility & Infrastructure Committee
In late 2023, the Administration began a preliminary design alternatives study for the TR 033 Black Nugget Retaining Wall Replacement project. The project addresses the deteriorating retaining wall on SE Black Nugget Road, behind Fred Meyer and Home Depot in North Issaquah. The existing retaining wall runs along the north/east side of the road and has a steep slope above it. The slope above the wa
Open meeting →
Jun 24, 2024 City Council Special Meeting
Open meeting →