Front Street Streetscape Phase 1 Project AB 7715

2 stops across 1 body · Jan 7, 2019 → Feb 5, 2019

Summary

The city proceeded with the first phase of Front Street streetscape improvements to enhance pedestrian and drainage conditions north of downtown. Council authorized the project in February 2019, building on 2016 work that widened sidewalks and installed irrigation infrastructure.

Timeline

Each card is one meeting where this item was discussed, oldest first.

Jan 7, 2019 City Council Regular Meeting Final action here
Action: Refer to Council Infrastructure Committee
Carried 6-0
In 2016, the City improved sidewalks and drainage along the east side of Front Street North between NE Alder and Sunset Way. This project corrected drainage problems, widened sidewalks, removed existing trees, and installed conduit under the new sidewalks to provide for irrigation to future landscaping. During 2016, an Olde Town Task Force developed the Downtown Streetscape Concept Plan for Front
Open meeting →
Feb 5, 2019 City Council Regular Meeting
Action: Authorize
Failed 1-6
In 2016, the City improved sidewalks and drainage along the east side of Front Street North between NE Alder and Sunset Way. This project corrected drainage problems, widened sidewalks, removed existing trees, and installed conduit under the new sidewalks to provide for irrigation to future landscaping. During 2016, an Olde Town Task Force developed the Downtown Streetscape Concept Plan for Front