Meeting concluded — minutes pending. The agenda below is what the City posted; minutes haven't been published yet. Issaquah approves Council minutes at the next meeting and ships them embedded in that next meeting's packet, so they typically land here 1–3 weeks after the meeting. Transcript and recording will appear once the City posts the YouTube video and our pipeline catches it.
Development Commission Auto captions

Wednesday, May 6, 2026

6:30 PM · Council Chambers, 135 E. Sunset Way, Issaquah WA
Section
2. APPROVAL OF MINUTES
2a
Minutes of November 19, 2025
packet pp.5–11
Staff report:
MINUTES DEVELOPMENT COMMISSION 6:30 p.m. – Wednesday, November 19, 2025
3. PUBLIC COMMENT
3a
Site Development Permit Application for The Trailhead Apartments, Quasi- Judicial (A)
Christen Leeson, Planning Manager Application No.: PRJ24-00020, SDP25- Location: 1550 Newport Way NW Parcel: 2924069002 Applicant: Nicole Winn, Weber Thompson Architects Description: Site Development Permit The proposed development includes an east- Public Hearing Order: · packet pp.13–2381
Topics: Land Use
Staff report:
STAFF REPORT Site Development Permit File No PRJ24-00020 / SDP25-00002 May 6, 2026
5. REGULAR BUSINESS
5a
Chair & Vice Chair Elections
Action · Emily Medina, Senior Planner · packet pp.2383–2384
Staff report:
Community Planning & Development P.O. Box 1307 Issaquah, WA 98027 425-837-3450 issaquahwa.gov
6. REPORTS
6a
City Council Update
7. OTHER BUSINESS / ANNOUNCEMENTS
7a
Upcoming Schedule
packet pp.2385
Staff report:
Development Commission 2026 Schedule (subject to change)
0:00 And will they signal?
0:03 >> Arsen, we're ready to go.
0:12 >> Okay. Good evening and welcome. Um, as
0:15 the development commission's chair and
0:16 vice chair are absent, I as the staff
0:18 liazison would like to call the May 6
0:20 city of Isiziqua Development Commission
0:22 meeting to order at 6:30 p.m. As a
0:26 reminder, we have a remote aspect to our
0:28 meetings. This means both staff and
0:30 members of the public may be
0:31 participating in the meeting remotely
0:33 via WebEx. For those attending remotely,
0:35 if you have questions or issues, please
0:37 send the host a chat message or email me
0:40 at emilymedisquawa.gov.
0:44 Excused absence for this meeting is
0:46 chair shore and vice chair Akita.
0:48 Alternate member Mayo is filling in this
0:50 evening as a regular member. Welcome,
0:52 Commissioner Mayo. Um as the
0:54 commissioner commission chair and vice
0:56 chair absent the commission members pre
0:58 present shall elect a temporary chair
1:00 who shall have full powers of the
1:02 position for this meeting only.
1:05 Please note an alternate member cannot
1:06 be selected per commission rules. First
1:09 I will take nominations for the
1:10 temporary chair. If only one person is
1:12 nominated a vote is not necessary. If
1:14 more than one person is nominated we
1:16 will put it to a vote. Uh can a
1:18 commissioner please put forth a
1:20 nomination? I put forth forth
1:23 Commissioner Morgan as uh temporary
1:26 chair for this evening's meeting.
1:28 >> Thank you, Commissioner Brennan. Any
1:29 objections or other nominations?
1:34 Great. Hearing none, Commissioner Morgan
1:36 will be our temporary chair for this
1:37 evening and I will pass the meeting over
1:39 to him. Thank you.
1:41 >> Great. Thank you, Emily. Um, first item
1:44 in business for us tonight now is
1:47 approval minutes uh to take action um on
1:51 the meeting minutes from November 19th,
1:53 2025.
1:55 It's been a minute. Uh I hope everyone's
1:58 had an opportunity to review the
2:00 minutes. Are there any corrections to
2:02 the November 19th minutes provided in
2:04 the agenda packet?
2:06 >> Mr. Chair, um there is an amendment that
2:09 I'd like to propose here. Um
2:14 the vice chair Iikita was attendant in
2:16 attendance at the last meeting and the
2:18 minutes do not reflect that. So I'd make
2:21 a motion to amend the minutes to add uh
2:24 vice chair Aikita as commissioners that
2:26 were present.
2:28 Thank you. There a second.
2:31 >> Second.
2:33 >> Any questions, comments? Hearing none.
2:36 All in favor say I. I. I.
2:38 >> I.
2:40 Motion carries.
2:43 Now take a motion on the main.
2:48 >> Mr. Chair, I move approval of the
2:50 meeting minutes from the Wednesday,
2:53 November 19th, 2025 meeting.
2:55 >> As amended.
2:56 >> As amended.
2:57 >> Thank you. We have a second.
2:59 >> Second.
3:00 >> Thank you. All in favor?
3:03 >> I.
3:04 >> No oppos. Meetings are approved. Thank
3:07 you.
3:09 Uh, next I would like to open the floor
3:12 for any members of the public in person
3:14 or virtually who would like to make a
3:16 general comment.
3:18 There will be a public hearing later in
3:19 the meeting for those who would like to
3:21 comment on the Trail Head Apartments
3:22 project. Miss Jackson, has anyone signed
3:25 up to make general public comments?
3:28 >> No, chair, they have not.
3:29 >> Thank you.
3:33 Anyone
3:36 else from the room
3:39 like to make general comments?
3:56 Oh, my name is Geraldine Kerry and my
4:00 address is 955 17th Place Northwest
4:03 Isakqua. I've been coming to these
4:05 meetings since I moved here in 1970
4:09 1980. So, I've been around a long time,
4:12 seen a lot of faces, and I'm here to
4:15 address um the trail heads uh building
4:19 development that is
4:22 going to be presented today. And I'm a
4:24 little bit nervous because I went on the
4:26 website and saw that there were two
4:28 buildings. So, I'm I was planning to
4:30 address the two buildings that are to be
4:33 developed. And I just now found out that
4:35 there's only one the north building
4:38 that's going to be addressed tonight.
4:41 But uh my concern is I'm really
4:45 want an input on and answers from the
4:48 city on parking. I think that's a major
4:51 issue in any development. And I think
4:54 when you have a lot of people moving in,
4:57 you need to provide parking. Not just a
4:59 place for them to live, but a place for
5:01 them to park. because if you don't
5:04 provide parking, it's going to influence
5:06 all the other people who are around in
5:09 the area. So, um I just want to make
5:13 sure and my questions are
5:17 if um the units don't have enough
5:22 parking places, where will these people
5:25 park? Will they park on the street? Will
5:27 they park on private property? and who
5:29 will enforce their parking when when um
5:33 they're using somebody else's space. My
5:37 main concern, not my main concern, but
5:39 I'm interested to know if these
5:42 um houses or apartments will have
5:45 assigned parking because if they have
5:47 assigned parking,
5:49 then it seems like um it would eliminate
5:54 some of the the confusion about where
5:56 people are going to park. But um I think
5:59 you need to seriously think about making
6:02 enough parking requirements so that the
6:05 whole neighborhood is not traumatized by
6:08 cars parking in their properties. Thank
6:10 you.
6:12 >> Thank you, Miss Carrie.
6:15 Are there any other comments from the
6:17 public?
6:19 General comments?
6:22 Hearing none, we'll move to the next
6:24 part of our meeting, which is the public
6:26 hearing. Uh for the agenda item uh it's
6:30 a preddecision open record public
6:32 hearing. The order of operation for this
6:34 hearing will be as follows. First the
6:37 purpose of the public hearing followed
6:39 by appearance of fairness disclosures.
6:43 Then we'll open the public hearing with
6:44 a staff presentation followed by an
6:47 applicant presentation.
6:50 Then open the floor for public comment.
6:52 Opportunity for rebuttal by applica by
6:55 applicant. Then staff will close the
6:57 public hearing. The commission will
7:00 deliberate and then take action
7:02 including motions, amendments,
7:04 discussion, and votes. Uh we'll then
7:06 conclude the agenda item on the quasi
7:08 judicial permit. If for any reason the
7:11 hearing cannot be completed this
7:12 evening, it may be continued to a
7:15 specified date.
7:17 The purpose of this public meeting is a
7:20 formal public hearing for the proposed
7:22 site development permit for trail head
7:24 apartments. The purpose of this hearing
7:26 is to solicit uh relevant public
7:28 comment, facilitate the review,
7:30 discussion, and decision on the
7:32 application by the development
7:33 commission. This is a quasi judicial
7:36 hearing.
7:38 Emily, please proceed with our
7:40 appearance of fairness doctrine.
7:45 >> Thank you, Chair Morgan.
7:53 Um, all right. So, I'm going to go
7:55 through a couple slides and if the
7:56 commissioners um want to ask a question
7:58 could speak into your microphone, make
8:01 sure it's on to affirm um or deny the
8:05 questions. So, quasi judicial decisions
8:08 context um requires proceedings to be
8:10 fair in fact in appearance. Exparte
8:12 contacts are prohibited. Um, and the
8:15 question to ask yourself would is, would
8:16 a disinterested person knowing the
8:18 totality of a decision maker's personal
8:20 interest in a matter be reasonably
8:22 justified in thinking that partiality
8:24 may exist? Decision makers who have
8:26 personal interest, prejudgment of
8:28 issues, or partiality are disqualified
8:30 from the proceedings.
8:38 Okay.
8:40 All right. Questions for the
8:41 commissioners. With regards to the
8:43 outcome of this proceeding, do you have
8:45 a personal interest financial or
8:47 otherwise in the outcome?
8:50 >> No.
8:50 >> No.
8:50 >> No.
8:53 >> Does your employer have an interest
8:55 financial or otherwise in the outcome?
8:57 >> No.
8:59 >> Do you have any familial, social, or
9:01 business relationships or connections
9:03 with any of the parties or nonparties
9:05 who have an interest in the outcome?
9:07 >> No.
9:07 >> No. Do you have any special knowledge
9:09 about the substantive or the merits of
9:11 this proceeding which would or could
9:13 cause you to prejudge the outcome?
9:15 >> No.
9:16 >> No.
9:20 >> Will there be any prospective employment
9:22 for you or your family as a result of
9:24 the decision?
9:25 >> No.
9:26 >> Do you own or control property within
9:28 300 ft of the subject property?
9:31 >> No.
9:32 >> Have you had any exparte communications
9:34 regarding this project?
9:37 >> No.
9:40 Do do you believe you can sit and hear
9:43 this matter fairly and impartially both
9:45 as to the respective positions of the
9:47 proponents and the opponents of this
9:49 matter?
9:51 >> Yes.
9:53 >> Questions for the audience. Does anyone
9:55 in attendance wish to challenge the
9:57 participation of any commissioner based
9:58 on the parents of fairness doctrine?
10:02 I see none.
10:06 All right, I will pass it off.
10:16 >> Hello. Uh, my name is Abby Weber. Um, I
10:19 am a senior planner with BHC
10:21 Consultants. Um I my company has been
10:23 providing consulting services to
10:30 just as a note we're opening the public
10:32 hearing at 6:40 p.m.
10:36 Oh,
10:41 next page. Thank you, Abby. Um
10:47 Abby, I'll need to swear you in. Please
10:48 state your name and position with the
10:50 city for the record.
10:52 >> Abby Weber, uh, planning consultant.
10:55 >> Do you swear by oath or affirmation that
10:57 the testimony you're about to provide is
10:59 true?
10:59 >> I do.
11:01 >> Thank you. Please proceed with your
11:02 presentation.
11:03 >> All right. Um, thank you. So, again, my
11:06 name is Abby Weber. I'm a planning
11:07 consultant working for the city of
11:09 Isiqua. I have been the primary planner
11:11 assigned to this project. Um, and I've
11:13 been working with the city for um, a
11:15 little over two years, I believe.
11:23 Oh, okay. Um, so, uh, the subject of
11:27 this public hearing this evening is, uh,
11:29 the Trail Head Apartments project. Um,
11:33 the site is located at 1467 Northwest
11:36 Maple Street. It is in the central, uh,
11:39 central Isiquest sub area in the urban
11:42 core zone or UC zone. The land use
11:45 designation is mixed use. Um there is an
11:49 existing type 2 green necklace trail
11:51 connection to the north of the site uh
11:53 called the Maple Juniper Trail. Um and
11:56 then a half block to the south of the
11:58 site, there is a type one connection um
12:00 that is planned along the north side of
12:02 Newport uh way northwest. Um and then
12:05 there's the existing Tibets Valley Park
12:07 located um half block to the south
12:09 across Newport Way.
12:15 So, the proposed development is of a um
12:18 eight-story mixeduse affordable housing
12:20 project. Um it contains 157 dwelling
12:23 units. Um one co-living suite with five
12:26 sleeping units. Um an approximately
12:28 10,000 square foot opportunity center.
12:31 162 total parking spaces. Um two
12:34 pedestrian passages along the um uh west
12:39 edge of the building along the south
12:42 edge of the building. So the site plan
12:43 that you are seeing on the screen now uh
12:45 north is actually oriented to the to the
12:47 left of the screen.
12:50 um a new public street is proposed um
12:52 that will result from a 30 and a half
12:55 foot um public dedication along the
12:58 eastern edge of the site. So that will
12:59 be called um 14th Avenue Northwest. Um
13:02 the project includes water, sewer, storm
13:04 water and frontage improvements um and
13:06 also wetland enhancements. Um and the
13:09 project also includes um approval of
13:11 three um deviations from public work
13:14 standards and we'll talk more about
13:15 those on a later slide.
13:23 Uh so this project began um with a
13:27 memorandum of understanding between the
13:29 city and King County housing uh housing
13:32 authority um in 2022. Um so this uh
13:36 memorandum of understanding outlined um
13:38 specific items for um development of the
13:41 site. So that included uh levels of
13:43 affordability and um a space for a
13:45 city-owned health center. Um, so that's
13:47 the opportunity center. Um, so, uh,
13:50 since then, um, uh, KCHA or the King
13:53 County Housing Authority identified, um,
13:55 several code requirements that were
13:56 prohibitive to development of the site
13:59 and state law actually authorizes, um,
14:02 cities to wave parts of their, um, land
14:04 use code um, for housing authority
14:07 buildings. Um so on uh in July of 2025,
14:11 the city um council approved um a
14:14 housing cooperation agreement and that
14:16 was included as exhibit A um to the
14:18 staff report. And so that uh agreement
14:21 waved or changed um eight code
14:23 requirements that apply to this project.
14:25 And so those are referred to also
14:27 referred to as deviations um throughout
14:30 the staff report.
14:34 So, um, these are the eight different
14:36 deviations that were granted. Um,
14:38 they're referred to as 1 through eight,
14:40 um, throughout the staff report, um, and
14:42 my presentation. Um, the first one
14:43 waved, um, a requirement for a fifth
14:46 fifth floor step back. Um, the second
14:48 one, um, combined, um, the requirement
14:51 for common and private outdoor amenity
14:52 space. Uh, the third one waved the 40%
14:56 ground level transparency requirement,
14:58 um, along certain facades. Uh the fourth
15:01 one allowed um the applicant to
15:03 substitute the evergreen sustainable
15:05 standards um in place of the lead
15:08 platinum standards that the city code
15:09 requires. Uh the fifth one waved um the
15:13 requirement for um uh retail to wrap the
15:17 structured uh parking garage. Uh the
15:20 sixth one waved tree retention
15:22 requirements. The seventh one reduced um
15:25 required transparency for facades um
15:28 facing natural areas. And the eighth one
15:30 allowed um uh bike storage facil uh the
15:34 bike storage room to face the natural
15:36 area with um limited transparency.
15:42 Uh so as I mentioned this is a 100%
15:44 affordable housing project at or below
15:46 80% area medium income. Um that's AMI.
15:50 Um this project is well as a mixeduse
15:53 project in the UC zone. Um this uh
15:56 project is subject to the occlusionary
15:59 zoning requirements and they have
16:01 selected option one um which requires
16:03 12.5% affordable housing at or below 60%
16:07 AMI. Um so of the total units 20 of them
16:12 will be um at or below 60% AMI. Uh so
16:16 because the project is 100% affordable
16:19 um they um are allowed to take advantage
16:21 of the um central Isiqua development
16:25 bonus program um and so they're allowed
16:28 to exceed the base F and the base height
16:30 limits. So F is increasing from uh 3.0 0
16:35 to 4.12 um and the maximum is 5 and then
16:39 the height limit is increasing from the
16:41 base height limit of um 60 ft up to 83.5
16:46 um and the maximum is 125.
16:51 Oh, and I just want to point out so this
16:53 table here is um u showing the the
16:57 city's 2044 um uh housing needs by
17:00 income bracket. So this project will
17:02 fall help the city achieve those housing
17:04 goals. Um and it'll fall so if you see
17:07 there's the the 50 to 80 AMI range. Um
17:11 so it'll help the city meet that need
17:13 for 460 units.
17:20 Um so during the course of review this
17:22 the site was reconfigured. So in those
17:25 initial application materials um you and
17:28 then throughout the plan set you may see
17:31 um that it may appear that the project
17:33 site is twice as large. So the initial
17:35 application actually included two
17:37 buildings. Um and then uh during the
17:40 course of review the applicant reduced
17:42 the size of the site uh roughly in half.
17:45 Um so the north building is the
17:47 affordable housing project. Uh the south
17:49 building will be a market rate project
17:50 and that will be developed under a
17:52 future permit. Um so um the applicant
17:56 has chosen to shortplat the site
17:57 creating two new lots. Um that shortplat
18:01 application has recently been submitted
18:02 and is under review by the city. Um and
18:06 uh condition number one on the staff
18:08 report requires um short plat u that the
18:12 short plat must be recorded prior to
18:13 issuance of a building or construction
18:15 permit. Um and then there's also going
18:17 to be a um public plaza covenant that
18:20 spans the center line between the north
18:22 and the south building um roughly
18:25 building face to building phase. And so
18:26 that will require um uh public access
18:30 and in development of that public plaza
18:31 between the two buildings.
18:37 Uh so we will jump into building and um
18:41 site design. Uh so there is a wetland
18:44 along the um western edge of the site.
18:47 So that wetland will be enhanced for um
18:50 environmental storm water um and passive
18:53 enjoyment. Um the building will be
18:55 oriented um to the wetland. Um and
18:57 deviation number seven allows for uh
19:00 reduced openings um on the facade facing
19:03 that natural area. So, the code requires
19:06 um 50%
19:08 um uh uh doors and windows on a facade
19:12 facing the natural area, but the
19:13 deviation allows for um only um 20% um
19:18 of the wall to be made up of doors and
19:19 windows. Um but so while the deviation
19:22 allows 20%, 21% is actually proposed.
19:26 The entries of the building are designed
19:28 to be distinct um and oriented towards
19:31 transportation facilities. Um
19:33 connections to green necklace amenities
19:35 are proposed. Um pedestrian amenities,
19:38 weather protection and special paving is
19:41 provided. Uh there are no blank walls
19:44 longer than 30 ft.
19:46 Um deviation number eight um allows will
19:51 allow bicycle storage areas um with
19:55 limited transparency um on exterior
19:58 walls facing the wetland. And so this is
20:00 in response to a code requirement uh
20:02 that prohibits uh any uh activities or
20:06 building uses that um would appear to
20:09 close off the building from natural
20:10 areas. So um bicycle storage falls in
20:13 that category. So there will be um some
20:15 transparency but um the bicycle storage
20:19 area is allowed for a maximum width of
20:21 65 ft um on that facade.
20:25 uh deviation. Um so there will be uh so
20:29 deviation number three grants relief
20:31 from the 40% transparency requirement um
20:34 on the east facade along 14th Avenue and
20:36 then the south facade along the east
20:40 west passage. Um but the project will
20:42 comply with transparency requirements by
20:44 providing um about 62% transparency on
20:47 the north facade and 41% on the west
20:49 facade.
20:51 Um and then again deviation number four
20:54 um will allow the applicant to
20:56 substitute those evergreen sustainable
20:57 development standards um in place of the
20:59 lead platinum program. And those um
21:02 evergreen sustainable development
21:04 standards were actually developed um for
21:06 application to affordable housing
21:08 projects.
21:10 And I also just want to point out that
21:12 um condition number five um will require
21:14 the project to meet um rooftop material
21:18 requirements. um
21:20 that is um analyzed in the building
21:24 design section as well.
21:28 Uh so since the project is located in
21:31 the central ISUqua sub area, the central
21:35 isqua design and architectural standards
21:37 apply. So these standards supersede um
21:40 other design standards. Um these
21:42 standards also require throughblock
21:44 passages. Um so these are provided so
21:47 two throughblock passages are provided
21:49 on site. The the north south oriented
21:52 passage between the wetland and the
21:53 building and then the east west oriented
21:56 passage that will be on the south side
21:58 of the building and then additional
22:00 connectivity is created by the new
22:03 street with sidewalk improvements along
22:05 the eastern edge of the site.
22:08 The project has selected the Northwest
22:10 contemporary style standards. Um they
22:14 are meeting the massing requirements by
22:16 providing a simple base um with a
22:19 cornice treatment um and a C-shaped
22:21 building at the upper levels. Um they're
22:24 um complying with scale requirements by
22:26 providing vertical articulation and
22:28 vertical emphasis in the design of the
22:30 facades. Um deviation number one will
22:34 allow the project um to deviate from
22:37 those uh upper level stepback
22:40 requirements above the fifth floor.
22:44 Um they are providing at least 75% brick
22:48 or simulated wood materials. They're
22:51 providing variation in window types. Uh
22:54 they're providing a flat roof which
22:55 which is not a dominant design feature.
22:59 um and materials are provided in natural
23:01 tones.
23:08 162 total parking spaces are provided um
23:11 for the development. Um 120 are required
23:15 for the residential use and 123 are
23:17 proposed. 39 are required for the
23:21 opportunity center use and 39 are
23:23 proposed. Uh six motorcycle spaces are
23:26 required and six are proposed. and um
23:29 their vehicular parking is meeting will
23:31 be meeting EV standards.
23:33 So the parking area is shown um in
23:35 yellow on this graphic. Um so the
23:38 project requires 11 short-term um
23:41 bicycle parking spaces and 12 are
23:43 proposed um and requires 161 long-term
23:46 spaces but 162 are proposed. Um so
23:50 short-term bicycle parking spaces um
23:52 they are required to be located within
23:54 50 ft um of the primary entrance. Uh
23:57 because uh two of those 11 spaces are
24:01 actually required for the opportunity
24:03 center. Um staff recommends a condition
24:06 that um two of the spaces be located
24:08 within be moved to be relocated within
24:11 um 50 ft of that opportunity center
24:13 entrance. Um so if you're looking at
24:15 this slide, I've highlighted the um
24:17 long-term parking area in blue. That's
24:20 internal storage. And then in green in
24:22 the lower right uh left corner, that's
24:24 where the short-term bike parking is
24:26 located near the primary residential
24:28 entrance. So two of those um spaces um
24:31 we recommend that they're relocated
24:32 within 50 ft of that um opportunity
24:35 center entrance.
24:37 Uh so two loading spaces are required
24:40 and proposed. Um those are highlighted
24:42 in orange in the upper right corner um
24:45 of the graphic. and staff recommends a
24:47 condition that um signage be required uh
24:50 for hours of operation per code.
24:53 Um and then again I want to refer you to
24:56 dev deviation sorry this is a typo on
24:59 the screen deviation number five
25:00 actually um grants relief um from the
25:03 requirement that commercial or
25:04 residential uses um wrap the parking
25:07 structure. So, this requirement is met
25:10 along Maple Street. Um, but relief is
25:13 granted along 14th Avenue.
25:21 So, on to trees and landscaping.
25:24 All right. So, um tree the tree
25:27 retention requirement is 25%. Um but the
25:31 um housing cooper cooperation agreement
25:34 um granted relief from waved that
25:36 requirement. Um the canopy coverage
25:39 requirement is 25% uh but 47% is
25:42 proposed. Um so I wanted to point out
25:44 that uh 9,456
25:48 ft of existing canopy is included in um
25:51 that canopy coverage calculation and the
25:54 rest will be met with replacement trees
25:56 on site.
25:58 Um, condition number 13, um, in the
26:00 staff report, uh, uh, requires that the
26:04 applicant submit a tree plan that
26:05 complies with the code and tree
26:07 protection guidelines in the arborous
26:08 report.
26:11 Um, in regards to landscaping, um, so
26:14 the, um, landscaping meets the
26:16 diversity, size, and spacing standards.
26:19 Um, native plantings are proposed
26:21 between the building and the wetland. Um
26:23 and then the ground level landscaping
26:25 areas uh meet minimum um dimensional
26:28 requirements of 100 square feet and at
26:29 least five feet wide.
26:37 Um so the
26:40 um common um outdoor amenity space
26:42 requirement was modified by deviation
26:44 number two. Um so this required um this
26:49 combined the requirement for um common
26:52 and private outdoor amenity areas
26:54 resulting in um a total requirement of a
26:58 148 square ft. So it can be met by any
27:00 combination of common and private
27:01 amenity space. Uh so the proposed
27:03 development um requires
27:06 23,784
27:08 square ft and they are exceeding this
27:11 requirement with 29,729
27:14 square ft.
27:16 um 30% of um the amenity space must be
27:20 landscaped and they are um proposing a
27:22 total of um they're landscaping 34% of
27:26 the total um amenity area.
27:30 158 seats are required and 165 are
27:33 proposed. Um wayfinding signage is
27:36 provided um as required by code and
27:38 they're loc providing in three locations
27:41 um where those pedestrian passages
27:43 intersect in the southwest corner and
27:46 then where they meet the streets on both
27:48 the north um and the eastern edges of
27:52 the site. Um and the project complies
27:55 with the rooftop and playcape um amenity
27:58 space requirements. Um the
28:00 non-residential use results in a
28:02 requirement of um 400 square feet of
28:05 community space. Um and this BA staff
28:08 recommends uh a condition that this
28:10 space be um required to comply with the
28:13 plaza requirements. So that's um
28:15 conditions eight and nine. So condition
28:17 number eight um will require further
28:20 development of the design of the space
28:21 to accommodate year-round use. Um and
28:24 they could do this by incorporating a
28:26 pergola, a gazebo, or another form of
28:27 weather protection. And then condition
28:30 number nine um uh requests that they
28:33 update the landscape plan to show that
28:35 at least 25% um but not more than 40% of
28:38 the open space is landscaped with trees,
28:41 ground cover or other vegetation and
28:42 then incorporate root bar uh root
28:44 barriers for all trees within the plaza.
28:47 Um and again um pedest the pedestrian
28:51 passages provide connections to green
28:53 necklace amenities.
29:01 So uh lighting is largely reviewed with
29:04 the um construction permit. Um the city
29:08 uses a third party consultant to ensure
29:10 that the development complies with um
29:12 performance um methods and other
29:15 technical lighting standards. So at this
29:17 um stage of review, the lighting
29:18 consultant reviewed four um design
29:21 related lighting lighting regulations.
29:24 Uh amenity areas were found to be
29:26 uniformly lit with pedestrian scale
29:27 fixtures. Primary entrances are
29:30 highlighted by lighting. Um and um the
29:33 lighting consultant did include some um
29:35 comments for further development on the
29:37 lighting plan and the cut sheets. Um so
29:39 staff recommends a con condition number
29:41 10 that will require these comments to
29:43 be resolved at the time of construction
29:45 permitting.
29:51 Um, so as I mentioned before, there's a
29:53 uh wetland along the western edge of the
29:56 site. This is a category 4 wetland that
29:59 requires a 50-ft buffer. Um, trail and
30:03 storm water facilities are allowed in
30:05 the outer 25% of that buffer.
30:08 Um as proposed um split rail fencing is
30:11 proposed along the wetland boundary and
30:14 that will um reduce human uh disturbance
30:17 of the wetland. Um there'll be no
30:19 lighting or noise impacts. Um and
30:22 wetland enhancement will um occur in
30:25 accordance with the mitigation plan. Um
30:27 so condition number 11 will require
30:29 compliance with the mitigation plan.
30:32 Um the site is also located within a
30:36 class 3 critical aquifer recharge area.
30:39 Uh this means that a phase one ESA was
30:42 required during review. Um this uh study
30:45 indicated there was a potential for an
30:46 underground storage tank on site. Um so
30:49 condition number 12 in the staff report
30:52 um requires removal and notification of
30:54 the city um if it is discovered.
31:02 So um the project included three
31:06 deviation requests from public works
31:08 standards. Um so there was um there was
31:11 a request from a a street standards
31:13 deviation request from core street um
31:16 requirements. Um and this was approved.
31:19 Um so this modifies the um half street
31:21 section by um sorry of 14th north 14th
31:25 street northwest by removing the bike
31:27 lane um parking lane and buffer along
31:29 the project site and allowing the
31:31 sidewalk to be reduced from 8t to 5t. Um
31:35 while providing the multi-use trail on
31:37 the west side of the development. Um so
31:39 this again was approved by the uh city
31:42 staff. Um the second request was um so a
31:46 street another street standards
31:47 deviation request from to allow a curb
31:50 bulb along northwest Maple Street. This
31:53 was approved. So this allowed um
31:55 construction of a 23- foot long curb
31:58 bulb um along Maple Street um which is
32:01 an arterial roadway. So, this curveball
32:04 will align with the city standards for
32:06 on street parallel parking. Um, but it's
32:08 being added to support um the unique
32:11 needs um of the residents um and pick
32:14 off and drop off access uh for
32:15 specialized uh transit vehicles.
32:19 Um and then deviation number three um
32:22 was a deviation request from water
32:24 standards to allow a dead-end water man.
32:27 Um and so this the city has um included
32:34 uh sorry so um city staff is inclined to
32:39 approve this request um subject to the
32:41 resolution of staff comments that are
32:43 included on um exhibit AA. So condition
32:46 number 14 um requires that the applicant
32:50 satisfy those comments in order to um
32:53 gain approval of that deviation.
33:02 Um so the uh site is in planned action
33:06 area 2 of the central Isiqua sub area
33:09 plan EI environmental impact statement.
33:12 Um so it is subject to planned action
33:14 ordinance number uh 2665.
33:18 Um a planned action determination was
33:21 issued on um April 20th, 2026.
33:26 Um and so this found that no further um
33:28 seer review was required because it was
33:30 meeting the requirements of that EIS and
33:33 planned action.
33:35 Um so this determination did not include
33:37 a public comment period but notice of
33:39 application
33:41 um notice of the SEIPA application did
33:43 um in September late September 2025. So
33:47 public comments were received at that
33:48 time. Um these comments pertain to
33:51 traffic, parking circulation, ground
33:53 floor commercial use, um the effects of
33:56 the project on neighboring properties
33:57 and um the overall neighborhood dynamic
33:59 and design elements like balconies. Um
34:02 so these public comments are all
34:04 compiled and included as exhibit E. Um
34:06 and the applicant provided a written
34:08 response to the public comments which is
34:10 included as exhibit FF.
34:12 A community meeting was also held on
34:15 November 5th, 2025.
34:17 Um comments at that meeting pertain to
34:20 parking capacity
34:22 um versus demand balconies for
34:25 affordable units. Uh lack of stepbacks
34:27 for the facade where the project is um
34:30 sorry where the project is questioning
34:31 where the project was in the development
34:33 process utilities um and then um the
34:36 rightway dedication. And so these um
34:40 public comments were addressed uh by the
34:42 applicant team at the time of the
34:44 meeting and staff summarize uh the
34:46 public comments and the applicant's
34:48 response in the community meeting
34:50 summary memo which is included as
34:52 exhibit GG.
34:57 Um so staff recommendation is to um
35:01 approve um the project subject to
35:03 conditions 1 through 14 in the report.
35:07 uh after
35:10 eventually you'll be asked to um approve
35:12 as proposed, approve with modified
35:14 conditions or deny the project. Uh and
35:17 we would now like to open it up to
35:18 questions.
35:20 >> Great. Thank you, Miss Weber, for the
35:22 especially for the very extremely
35:24 detailed uh staff presentation in the
35:27 package. Uh any questions from the
35:30 commission on the staff's presentation?
35:35 Well, I have probably three layered
35:37 around the deviations. Is this does the
35:39 staff also recommend that we accept the
35:42 deviations?
35:43 >> You said the conditions, but are the
35:45 >> the do you are you referring to the
35:47 public works deviations or to the
35:49 housing
35:50 >> the housing authority zoning?
35:52 >> Um, so those are already approved.
35:54 >> Oh, they are. So that's that's baked.
35:56 Okay, that was really my question.
35:57 >> So that's essentially those are the code
35:59 requirements that apply to this project.
36:00 >> Okay. Uh and then so part two, the the
36:03 market uh rate housing that's phase two,
36:06 will it also have those uh deviations
36:09 pre-approved?
36:10 >> I may need to defer to city staff.
36:15 >> Some but not all of the deviations were
36:17 approved by council.
36:18 >> Okay.
36:18 >> For the market rate.
36:20 >> And then I guess last, what drives the
36:22 request for those deviations? Is it to
36:24 maximize density, maximize units, or
36:26 reduce cost? Both. Something else. So
36:28 I'm I the applicant can answer better
36:30 than me, but a lot of it is driven by
36:31 cost.
36:32 >> Okay.
36:32 >> Yes.
36:33 >> All right. Thank you.
36:38 >> Any other questions for the staff based
36:41 on their presentation?
36:46 >> Brendan.
36:47 >> Yeah, Mr. Chair. Just a couple related
36:49 to um one the permit process for the the
36:54 building the south building that would
36:55 require a separate uh SDP and building
36:59 permit etc. So that would be a
37:01 standalone project that most likely
37:03 would become in front of the commission
37:04 at a later date. No time frame set on
37:07 when that redevelopment might happen or
37:09 that development might happen.
37:10 >> We need to defer to the applicant.
37:13 >> Yeah. And I and I should um introduce
37:14 myself to I guess I'm Kristen Leon, the
37:16 planning manager. And no, we've been in
37:19 discussions with them. I know that
37:20 they've started design, but I don't
37:22 believe they own the property yet. And
37:24 so, no, there is no timeline set up for
37:26 that.
37:27 >> They don't.
37:28 >> And the the applicant is not here for
37:30 the south for the south building for the
37:31 market rate.
37:32 >> Okay. So, there's separate property
37:34 owners for the two project.
37:36 >> Not yet. Right now, King County owns the
37:39 entire parcels. Is that still correct?
37:40 Yes. Right now, King County still owns
37:42 the entire parcel.
37:43 >> Okay. Um then just a follow-up question.
37:46 So, there's um some uh the plaza and
37:51 it's noted in the condition, but in the
37:54 plaza and then you've got a uh you know
37:58 multi- um purpose walkway that runs um
38:02 alongside the buildings between the
38:04 properties. there'll be covenants added
38:06 to the short plat um as a condition.
38:10 Otherwise, I'm curious about how do you
38:13 ensure that these two buildings if you
38:16 have separate property owners and it's
38:17 going to redevelop at some later date?
38:20 >> Yes.
38:20 >> Satisfy the the broader design criteria
38:22 that's trying to be satisfied with the
38:25 site layout.
38:26 >> Yes, the plaza was included in the
38:28 memorandum of understanding that was
38:30 done between the city and King County
38:31 Housing Authority, but that was with the
38:33 housing authority. So yes, um I believe
38:34 the draft plaza covenant is included in
38:37 your packets as an exhibit. It's a
38:39 draft, but it is going it will be
38:41 included and recorded with the short
38:42 plat once that is approved.
38:44 >> And then will it also address the um
38:48 multi-purpose kind of walkway that runs
38:51 from north to south through alongside
38:53 the buildings?
38:55 >> Um I'm going to have to ask the
38:57 applicant to do that one. I I believe
39:00 it's included in the short plat.
39:01 >> Okay. as an ement but
39:03 >> I can wait
39:05 >> that question.
39:06 >> Um okay that's
39:13 >> I do have a couple questions. Uh one is
39:17 condition five.
39:19 What are the rooftop requirements that
39:21 the city would be looking for
39:25 >> compared to what is there?
39:27 >> I have to go to that section of the
39:29 analysis.
39:34 Um, so I'm looking on page 12 of the
39:36 staff report. Um, there are so that's in
39:40 chapter um 18 um 602 building design
39:44 standards of the code. So there are
39:46 specific requirements that apply to uh
39:49 rooftops including um specific um
39:52 rooftop materials and that's just not a
39:55 level of detail that you typically see
39:57 at site development permit. So the
39:59 condition would just require the
40:01 applicant to demonstrate how they're
40:02 meeting those material requirements at
40:03 the time of building permit review.
40:05 >> Okay. So it wasn't something they had
40:07 there that did not meet code. We just
40:10 don't know what this area.
40:11 >> Yeah. Yep.
40:12 >> Great. Okay. Thank you. Um and then uh
40:15 can you talk about 14th Street Northwest
40:19 and a couple things a half street
40:22 improvements
40:23 and is it a 30 foot 30 and 1/2 ft
40:27 rideway dedication on this parcel and
40:31 will it require another 30 feet on the
40:34 joining parcel to the east at some point
40:37 or will the 30t be
40:38 >> le the applicant to speak to this? Yes.
40:42 When the other parcel comes in, it will
40:43 be required to build the other half of
40:45 the rideway
40:47 >> to the to the east to to the east. Yeah.
40:49 The other half of 14th Avenue Northwest.
40:52 >> So the road that would be built would be
40:54 half of a road,
40:55 >> right? So the one that's going to be
40:57 built will will be two-way. And so it'll
40:59 have two, I believe, 10 or 11 foot
41:01 lanes. When it comes when the full road
41:04 is extended out, then it will also
41:07 include parking and bike lanes on both
41:09 sides as well as the two drive lanes.
41:11 >> Okay. That's why I was wondering it
41:13 would have become just an alley, but
41:14 when it expands, it has to be done both
41:18 ways, including by this owner.
41:20 >> Correct.
41:21 >> We'll have to make those improvements.
41:22 >> Yeah. And really, this will include
41:24 mostly striping. So, it'll Yeah. I think
41:26 I think that the at that the future um
41:30 person the future developer to the east
41:33 will then do the restriping and finish
41:34 out the road
41:35 >> and and this parcel would require
41:37 sidewalks to be put in then
41:40 >> this part this one is having sidewalks
41:42 put in.
41:43 >> Oh, it is.
41:44 >> Yes, they're just going to be reduced to
41:45 five feet and they will remain five
41:47 feet.
41:47 >> Okay.
41:49 >> Great. Thank you.
41:53 Hear no other questions for the staff.
41:55 Um, do the development team, applicant
41:58 team want to make any comments or just
42:02 we understand maybe just open to
42:04 questions.
42:12 >> Okay. So,
42:15 >> I just had a tangential question.
42:18 Typically these dwelling units, what's
42:20 the occupancy of each of those expected
42:24 approximately? Can you touch on those
42:26 mix of studio one and twobedroom units?
42:30 >> Are there maximum occupancy rates per
42:33 units or
42:39 >> well they go they go anywhere from
42:41 studios to three bedrooms. So, you know,
42:43 if you have it I mean I don't I don't
42:45 think there is a maximum occupancy rate.
42:47 We don't have that um in the city
42:51 >> just from King County doesn't
42:53 >> okay
42:53 >> they don't
42:55 >> limit
43:04 >> I'm [clears throat] Dan Landis vice
43:05 president of development at King County
43:07 Housing Authority and just I I'm not
43:09 sure if you mean what what's our uh
43:13 usually how full are our buildings so we
43:16 all across our portfolio of about 13,000
43:18 units were 97% occupied. So we imagine a
43:22 new building like this will run close to
43:24 100.
43:26 >> But but per like if you had a
43:27 threebedroom or whatever it is, there is
43:30 no cap as far as how many people can
43:31 live in.
43:31 >> Well, how many people? We do have um
43:34 occupancy standards. Yeah. That that are
43:36 I mean that our own occupancy standards
43:39 and uh I don't know what they are off
43:41 the top of my head. I think it's two
43:42 people per bedroom max. Um although
43:46 that's it's unusual in three bedrooms
43:48 that we get get to that level.
43:52 >> Thank you.
43:57 >> Other questions from
44:00 commission?
44:02 >> Yeah, Mr. Chair, I do it's it is related
44:04 to the plaza. Again, I'm still kind of
44:05 grappling with how that's going to all
44:07 work. So, you're designing and this is
44:10 probably to the applicant design team.
44:12 You're designing half of the plaza now
44:14 and is that design will it function as
44:17 an independent plaza for this what will
44:21 be an interim period before the south
44:23 property redevelops? Um and then how
44:26 does it you know uh join I guess in the
44:30 future in a in a kind of a compatible
44:33 design. Um, is that all part of the
44:35 covenant or is that just a cooperation
44:38 between what will be a the next property
44:40 owner? I'm not sure how that plaza
44:44 exists with the initial project and then
44:47 joins with the next project. Has that
44:50 been thought through in the design
44:52 development?
45:03 Hi, I'm Maggie Carson. I'm with Weber
45:05 Thompson. We're the design architects
45:07 and landscape architects for this
45:09 building. Um, when we started this
45:12 project, we actually started with a
45:14 master planning phase for the full
45:16 thing, both the north and the south. And
45:18 so I can say, uh, currently there is a
45:21 full design for the full plaza. um so
45:24 that the whole thing reads very
45:26 holistically as as one entity once it's
45:28 completed. But the portion that will be
45:31 built as part of the north parcel um
45:34 will be able to function fully on its
45:35 own. It connects all the way through and
45:37 provides the spaces that Abby outlined
45:39 in detail. Um and but it does have a big
45:43 picture design that mirrors that in a in
45:46 a um coordinated way with what happens
45:48 on the south parcel as well. Does that
45:51 help?
45:52 >> Yeah, I think so. I mean obviously it'll
45:54 be the interest of the property owner to
45:56 the south to try to do something that
45:58 works well in their interest. So I
46:00 understand I just wondering if you know
46:03 the thinking around what's going on with
46:05 phasing this project and having a
46:07 different property property owner come
46:09 in and take responsibility for that
46:11 south building site. So and how that's
46:13 going to integrate
46:15 >> and and some of that may be a question
46:17 for you guys in terms of what agreement
46:19 you have with Yeah. Dan can come back
46:23 up. We can tag team this.
46:26 >> So Dan Landis again. So uh earlier you
46:29 had asked um when we expect the uh
46:32 market rate developer to come in with
46:34 their SDP uh application. Um there was a
46:38 lot of uh work that we've done,
46:41 negotiations with them and with the city
46:43 uh and we finally were able to sign a
46:46 purchase agreement with them that was
46:48 executed last week and that was their
46:50 main I think obstacle to to before
46:53 starting in earnest the design to get
46:55 them to the site development permit and
46:57 the building permit after that. So, our
46:59 expectation is they will be coming in
47:02 before like within a couple of months
47:03 once they've had a chance to uh decide
47:06 uh figure out the size of their uh
47:09 building and what it is they exactly
47:10 want to build.
47:11 >> Great.
47:11 >> Um so, was that the
47:14 >> Yeah, thank you.
47:18 >> I have a question or clarification. So I
47:21 think um you mentioned in the
47:23 presentation uh the the road that will
47:27 be rebuilt but it won't have in in this
47:30 case um parking or bike lane. Um but
47:33 when the the full road is finished you
47:36 mentioned striping would come in and
47:37 that would would that include that on
47:39 this part of the um on on the half that
47:43 we're considering today
47:45 >> or no? Um, so when the
47:48 eastern half of 14th is constructed,
47:51 will that then include parking and bike
47:53 lane
47:54 >> on both?
47:55 >> Okay. So eventually there will be a bike
47:57 lane. Yes,
48:03 >> Mr. Chair, I'll throw in one more quick
48:05 question while I have the team up at the
48:07 microphone. Um, so there were obviously
48:10 the deviations were approved by the
48:12 council and you know those aren't in
48:13 front of the commission. Um, but the
48:17 question I have is so there's a a
48:19 reduction in the number of kind of uh
48:21 open windows and doors etc. And
48:23 particularly on the east side of the
48:24 building and I know the property owner
48:26 on the east side has expressed some
48:27 concern about what's this building going
48:29 to look like as it faces our property.
48:31 Can you talk a little bit about what
48:32 what you've done to soften that um face
48:35 of the building um you know to help with
48:38 the you know the blank the more blank
48:40 wall condition that we might face. Sure.
48:43 Um there we go. Um
48:47 yeah, you know, this is a unique
48:49 situation in that there is no alley per
48:52 se for these two buildings and so there
48:55 are back of house sort of functions that
48:57 need a home um which include loading and
49:00 trash and garage entries and things of
49:02 that nature. Um and and that's part of
49:05 what we presented back to the city
49:06 council when we looked into those
49:08 deviations, but all with the
49:10 understanding that um you know, we do
49:13 want this to still feel like a
49:15 pedestrian friendly street. We want um
49:18 people in the city of Isiqua to feel
49:19 comfortable walking up and down it. We
49:21 don't want it to feel like an alley,
49:23 right? Um so we are including higherend
49:26 materials along that facade. We have
49:28 brick down at the base in several
49:29 portions so that it maintains a similar
49:32 aesthetic to what you're seeing around
49:33 the rest of the pedestrian experience at
49:35 the base of the building. Um there are
49:38 decorative screens in locations where we
49:40 have more utilitarian functions so that
49:42 there's some artistic elements. The
49:45 decorative screens are a perforated
49:47 metal that have um a water splashing
49:50 sort of pattern on them. We've got uh
49:52 locations where we've included artwork
49:54 on columns and things like that. lots
49:56 and lots of details that add to the
49:58 pedestrian experience. Um there is still
50:01 canopy coverage wherever uh we were able
50:03 to put it in place. Um so not at the
50:06 garage entry because we don't want
50:07 trucks to run into it of course, but um
50:10 you know anywhere that it it was able to
50:12 be included, we included overhead
50:14 weather protection and things like that.
50:17 >> Thank you.
50:18 >> Yeah.
50:21 >> Just one quick thing I would add. Uh the
50:23 issue with the relatively high
50:26 transparency requirements facing a
50:28 natural area is
50:30 >> uh energy code requirements. It we we
50:32 just can't do both. And so that was the
50:36 main driver in wanting to uh decrease
50:38 the amount of uh fenestration on on
50:42 those facades.
50:43 >> Yeah, that's that is a good
50:45 clarification. Um that was a big part of
50:46 what we talked about with the city
50:48 council for the other facade, not that
50:49 facing 14th Street, but facing the
50:51 wetlands. Um, in the natural context
50:54 zone, the glazing percentage that was
50:56 requested in the zoning code is outside
50:59 of what the energy code would allow. Um,
51:02 in in general,
51:04 >> something the city might need to take a
51:06 look at in the future. [laughter]
51:07 >> A little tug of war on the technical
51:09 stuff. Uh, one more question. We had a
51:11 speaker earlier who was obviously
51:12 expressing some concerns about adequacy
51:15 of parking and, you know, potential
51:17 overflow into the neighborhoods, etc.
51:19 And one of her question was whether
51:22 parking is assigned with the uh rental
51:26 or lease agreements or whether it's open
51:28 parking for residents.
51:31 >> So um I'm not sure that that policy has
51:34 been uh decided on yet. Um I I think
51:38 we're concerned about parking for our
51:39 residents as well and our ability to to
51:42 lease up the units. That's why we didn't
51:44 ask for any deviations on the parking
51:46 from what what was required and sort of
51:49 slightly overbuilt it. Um but uh we are
51:53 aware of the issues and I think we're
51:55 we're looking into various um strategies
51:58 that might help us make parking less of
51:59 an issue for the neighborhood
52:01 >> and Pratt and uh proximity to the
52:04 transit center is definitely a benefit.
52:06 >> A plus.
52:08 Yeah, proximity to the transit center is
52:10 definitely a plus. And as Dan just
52:12 alluded to, um because this is an
52:14 affordable housing project, there were
52:17 um reductions allowed in the code that
52:18 we didn't take advantage of. So
52:20 technically speaking, we are over
52:21 building um per our use as an affordable
52:24 housing.
52:27 >> That's all I have.
52:40 Chair Morgan, will you turn on your mic?
52:42 >> Sorry. Thank you. Uh I think it's on the
52:44 south side. Um the blank wall, there's
52:48 there are two blank walls that have
52:50 treatments. I think on the south side um
52:55 those two and in one of the sets of
52:58 plans it said art mural or planting and
53:02 others said art mural. And I think the
53:04 staff report says art mural. So, and I
53:07 don't think planting unless it's a
53:10 trellis built into the building would
53:12 meet that requirement. So, can you
53:14 discuss
53:16 what what will go on those walls?
53:18 >> I believe the intention is for two large
53:20 murals in those spaces. Um, we went back
53:23 and forth a little bit with the city on
53:24 would a large scale trellis be better
53:27 for a portion of that. Um, but I believe
53:30 where we've landed, we ended up adding
53:31 the brick pilasters that you see on the
53:33 screen now. Um, and then those two
53:36 outlined rectangles are intended to be
53:38 um, art murals at this point. Yeah.
53:41 >> And then art murals is an interesting
53:43 topic.
53:44 >> Um, so is there a an approval
53:48 requirement from the city on what can go
53:51 onto an art mural?
53:57 >> Yes. The art murals would run through
53:59 our arts commission.
54:01 >> Okay. There'll be a a artist chosen and
54:05 approved by the commission.
54:06 >> I don't know if an artist will be
54:07 chosen, but the artwork would go through
54:09 the commission. Would be
54:10 >> I will have to talk to the chair and
54:12 find out how that works.
54:13 >> Okay.
54:13 >> And there would be hopefully a
54:14 preference for a local artist. We would
54:16 hope.
54:17 >> Of course.
54:17 >> Of course.
54:18 >> Yes.
54:18 >> Okay.
54:19 >> I imagine that's your preference, too.
54:21 [laughter]
54:22 >> Yeah. We have we have not done anything
54:24 as far as choosing an artist or or even
54:27 a look that we would like there, but
54:28 we're open to things like trying to find
54:32 a local artist.
54:33 >> Yeah, we have a great arts commission.
54:35 So, yeah, great to bring them in. Um the
54:40 cornis um is it possible? I think it's
54:44 in this set of plans and I think it's
54:48 A3.05N 905N.
54:51 That shows some of the detail of
54:55 the cornness.
55:00 And
55:02 so the
55:07 Yeah. So the requirement for a cornice
55:12 in the northwest contemporary style
55:13 cornises or similar elements must be
55:16 welldetailed and of significant
55:18 proportions height and depth that create
55:21 visual interest and shadow lines. And I
55:24 couldn't find
55:26 I found a drawing I think at 7 point AB
55:30 but I couldn't find something that
55:33 talked about what those dimensions were
55:35 for that gray cornice at the top. But to
55:39 me, it didn't seem to look like it's
55:44 welldetailed, of significant
55:46 proportions, height and depth that
55:47 create visual interest, especially given
55:50 that that's 183 84 feet from ground
55:54 level. Um, so could you talk about that
55:57 and how do we meet that requirement
55:59 because I think that's part of our
56:00 tripartite
56:02 requirement for the building. Um I
56:04 believe the lower cornis is part of the
56:06 tri part the tripartid but um it you are
56:10 totally right. You've got the code there
56:11 right in front of you about it needing
56:12 to be significant in proportions. Um we
56:15 do have details that outline how it will
56:18 be constructed and give dimensions to
56:20 the height and the setback and the canal
56:22 lever of the cornice itself. I'm not
56:25 sure if they're in the package that we
56:27 have here.
56:29 >> A it would be a detail from the A8
56:32 series. Um,
56:35 I think though the rendering at the
56:37 maybe the beginning might do a better
56:39 job because I I'll admit that when you
56:41 look at it on this screen right here and
56:43 you're only seeing a little sliver of
56:45 it, it's hard to picture does that
56:47 actually cast much of a shadow or
56:49 anything like that. But the rendering on
56:50 the front does a good job
56:52 >> on the cover sheet of the G sheet.
56:54 >> Yeah.
56:54 >> Okay. So that's I might need your help
56:56 to find a different
57:01 >> Is it back?
57:03 Okay.
57:11 >> Yeah. And somewhere we do have a
57:13 physical materials board too that can
57:15 show you the actual
57:18 uh the actual color of that cornice
57:21 compared comparatively. So um the
57:25 cornice in question there is at that
57:29 green portion. Here we go.
57:44 up against the green and up against the
57:46 white there. Um, which will help with
57:48 its distinction.
57:49 >> Is is the is the corners in this drawing
57:53 is the corners we looked at on the other
57:56 plan. It looked fairly small compared to
57:59 that wall.
58:01 >> And and here we're seeing shadows from
58:04 those cornises on the left and right
58:06 onto the green below.
58:08 >> Yes.
58:08 >> So are those different than the cornice
58:10 we saw in
58:11 >> No, that is that cornice
58:14 that this is modeled directly from the
58:16 thing that the drawings are cut from. So
58:18 it's it's the exact same thing.
58:21 >> Yeah.
58:23 It just seemed like if we if we can go
58:24 back to the other
58:27 dimension when you show that wall and
58:29 this and the size of that cornice in the
58:31 drawing, it's hard to imagine it could
58:33 create that much shadow.
58:35 >> It does.
58:38 >> Um, which which is that in the detail
58:41 set?
58:42 >> Okay. There's there's no
58:44 >> I think
58:46 >> it probably will. I can say there's no
58:48 additional Photoshop on that rendering.
58:49 It's It's the model of the building in
58:51 Revit with the sun hitting it.
58:53 [laughter]
58:54 >> Yeah. Yeah.
58:55 >> Which specific sheet?
59:00 >> No, the detail was 7B,
59:02 but that might be
59:04 >> there'll be an eight detail or from the
59:06 eight series that shows like the framing
59:08 and the dimensions of it.
59:09 >> Do you know what she
59:10 >> I don't off top of my head.
59:14 >> Oh, that level three.
59:16 >> That's one of them. That's at the brick.
59:19 Um, so it won't be one at the brick.
59:21 It'll be one that is has
59:26 >> When I was looking through, I saw level
59:27 three and level four cornises.
59:30 >> Oh, here.
59:31 >> There you go.
59:32 >> Oh, level four.
59:33 >> Isn't that uh
59:34 >> here? Cornet standing seam route.
59:37 >> Oh, nope. That's level four. Keep going.
59:41 >> Me, [clears throat] too. That also says
59:43 level four. We'd be looking for
59:44 something that says, is it that one
59:47 right there? Level four. Oh, wait. I
59:50 think you maybe just passed it right
59:51 there. Does that say
59:53 >> No, that says four.
59:54 >> They all say level four.
59:58 That one say on the far side there.
1:00:02 >> I think it was one of those ones up
1:00:04 above. I think we've passed it.
1:00:11 >> I I can do that.
1:01:07 It is similar in shape to the one at
1:01:09 level four, but it's not exactly the
1:01:11 same.
1:01:26 I'm not seeing
1:01:55 that one.
1:01:57 It is very similar to this.
1:02:05 Oh yeah, it's very similar to this one
1:02:07 here. Um I actually think it's slightly
1:02:09 bigger, but this shows that we're out an
1:02:11 inch and a half, which is the dimension
1:02:14 of a um nominal or it's the actual
1:02:18 dimension of a nominal piece of lumber,
1:02:20 which is part of what's dictating that
1:02:22 plus another inch and a half out. So
1:02:24 we've got two steps. So you're getting a
1:02:25 total of three inches projection um and
1:02:28 a height of 2, four, and 9. Um what is
1:02:33 that? 13 15 feet or 15 inches tall plus
1:02:37 the little bit of slope there. Um, and
1:02:39 it should be very similar to these guys
1:02:42 here,
1:02:44 although I'm not seeing it in our set.
1:02:47 So, so it could be a extends out 3 in
1:02:53 83 feet above ground.
1:02:59 I don't know. I'm not an architect. It
1:03:01 just doesn't sound like that's much of a
1:03:06 welldetailed significant proportions of
1:03:08 height and depth that create visual
1:03:10 interest and shadow lines.
1:03:12 Um I guess the question would be
1:03:16 can you make a better cornness?
1:03:19 >> We could look at making it bigger. Um
1:03:21 there are limitations at some point uh
1:03:23 from a structural standpoint of putting
1:03:25 more weight on the top of the parapit
1:03:28 making the parapit want to tip out. We
1:03:30 don't want to end up in territory where
1:03:32 you need to add steel to support the
1:03:33 parapit because of the weight of the
1:03:35 cornice,
1:03:36 >> right?
1:03:36 >> Um
1:03:37 >> but we could we could certainly
1:03:39 >> we are
1:03:42 >> Yeah,
1:03:46 >> I can say that most buildings of this
1:03:48 height have a coping coping at the top
1:03:52 that is between four and six inches and
1:03:53 sticks off about a half an inch. Um so
1:03:56 when you compare it to that this is
1:03:58 pretty substantial.
1:03:59 >> Yeah. And I think just with the um
1:04:02 central area plan and the design
1:04:04 standards written around the tripartite
1:04:07 design and and the cornice is one of the
1:04:10 ways that you get there instead of um
1:04:13 other other methods. I guess the other
1:04:15 possibility is can it be more ornate
1:04:17 than just stamped metal? Um is there
1:04:21 something else? And I don't know if
1:04:22 other commissioners concerned about it,
1:04:24 but part of this is our central area
1:04:26 plan. These design standards, we're sort
1:04:28 of learning them as we go, too. So,
1:04:31 every time we approve something, it's
1:04:33 setting some standards like this.
1:04:36 >> Um,
1:04:39 I don't know that it's worth necessarily
1:04:41 a motion or amendment, but other
1:04:44 commissioners, any feelings about what
1:04:46 you've seen?
1:04:48 No concerns.
1:04:52 I will say that it doesn't concern me.
1:04:59 >> Just a thought on this. I I uh agree
1:05:02 that a more significant,
1:05:04 you know, um visual um attraction of the
1:05:08 top of a building makes it more
1:05:10 interesting from a skyline or from a
1:05:12 distance. You're right. This is 80 plus
1:05:15 feet high. Um, but in this particular
1:05:18 instance, I'm not quite sure what we
1:05:21 would do
1:05:23 um to make it more dramatic. I think
1:05:25 it's kind of like you just said, we're
1:05:26 going to be learning from different
1:05:28 projects what works best. This provides
1:05:31 some relief. I mean, um, I don't know
1:05:33 that it creates a huge concern for me,
1:05:36 but I I I see your I definitely see your
1:05:38 point. It's something we should be
1:05:39 really paying more attention to as we go
1:05:41 through design development for other
1:05:43 projects.
1:05:47 I guess my question is what's what's
1:05:49 between the two corner massings? What is
1:05:52 that corner? That one appears to be
1:05:54 >> that one is less um as a way to help
1:05:57 emphasize the corner elements in
1:05:59 particular.
1:06:11 So I, you know, Mel, I don't know. Um
1:06:15 I I definitely hear you. I I think with
1:06:17 the lack of the fifth story set back,
1:06:19 that's unfortunate. And so now you do
1:06:20 have this really tall structure and this
1:06:22 really diminished um
1:06:25 uh cornis treatment. I I guess if it it
1:06:28 was even deeper though, does it does it
1:06:30 make more of an issue of the lack of the
1:06:32 step back almost, you know? uh is less
1:06:35 more in this case. Or could there be
1:06:38 some congruency with the corner in the
1:06:40 midspan? I don't know. I I hear you. But
1:06:45 I also I I feel like uh
1:06:49 yeah, much more is going to sort of it's
1:06:52 already out of control in my opinion. So
1:06:56 I'll leave it at that.
1:06:57 >> Okay.
1:06:59 Thank you. Uh any other questions or
1:07:01 comments?
1:07:02 I I had a question about the I think in
1:07:04 the staff report you received some
1:07:06 comments about um balconies and things
1:07:09 like that. What drove this particular
1:07:11 blocky design and why weren't balconies
1:07:13 considered?
1:07:15 >> Uh balconies were considered and that
1:07:17 was one of the things we talked with the
1:07:19 city council as part of design
1:07:21 commission or part of the um housing
1:07:24 cooperation agreement. Um there are
1:07:27 several challenges with with balconies,
1:07:29 especially with the requirement of them
1:07:31 at every unit. There's a very obvious
1:07:33 cost component for the affordable
1:07:34 housing uh developer in general. Um they
1:07:38 also frequently become an eyesore and uh
1:07:42 tenants tend to use them for storage
1:07:45 instead of for recreation. They tend to
1:07:49 um gather strollers and coolers and
1:07:52 things of that nature. And when you have
1:07:54 that at every single unit on the facade,
1:07:56 your whole facade is strollers and
1:07:58 things of that nature, um
1:08:01 they can become a little bit of a fire
1:08:03 hazard as a result of the way they get
1:08:05 used as storage, especially in
1:08:07 affordable housing. Um that requirement
1:08:11 is one of the deviations that the uh
1:08:15 city council approved for the affordable
1:08:17 building, but not for the market rate
1:08:20 building. Um and and so the market rate
1:08:23 building will have balconies and things
1:08:25 of that nature on it. I think their
1:08:28 feeling was while they understood the
1:08:30 concern for the eyesore and the storage
1:08:33 use um they also really heard the
1:08:35 concern about constructibility and cost
1:08:38 and burdening the affordable building
1:08:40 with those measures. Um, there were also
1:08:43 a couple of
1:08:45 uh city council members in particular
1:08:47 who commented that they live in
1:08:49 buildings with balconies and they never
1:08:50 use their balconies. I will say um we do
1:08:54 a lot of market rate development as well
1:08:59 it's rare a developer asks for anything
1:09:02 over 20% balconies. Um they just they
1:09:06 find that tenants aren't asking for
1:09:08 them. Um, and so even if we're building
1:09:10 something kind of high-end, our target
1:09:12 is usually around 25% because most
1:09:15 people are not actually interested in
1:09:17 having them.
1:09:24 The other question I had was with
1:09:25 regards to ventilation and um is there
1:09:30 ventilation, is there forced air, how
1:09:33 does that work in that particular
1:09:34 building?
1:09:35 >> Um, so every unit has an ERV. um which
1:09:38 is an energy recovery ventilator and it
1:09:42 brings in fresh air from the outside. It
1:09:44 uses this fancy little box that looks
1:09:46 like layers of corrugated cardboard is
1:09:49 the best way to describe it and it uses
1:09:52 those to transfer the heat uh between
1:09:56 the inside air that is exiting as part
1:09:59 of exhaust and the outside air that's
1:10:01 coming in as fresh air. So that it helps
1:10:03 with your heating and cooling bills. Um,
1:10:06 it helps from an energy use standpoint.
1:10:08 Um, but its primary purpose is to
1:10:11 provide fresh air to the unit. Um, so
1:10:13 there are no trickle vents or anything
1:10:15 like that anymore. That's all gone by
1:10:17 the wayside with the current energy
1:10:18 code. And um,
1:10:22 in terms of heating, it's
1:10:25 electric.
1:10:26 >> I would say electric resistance. Is it
1:10:28 Cove? Correct. Cove heating. Um, and in
1:10:31 terms of air conditioning, AC, uh,
1:10:34 that's not part of the current plan,
1:10:36 except that the windows, um, are able to
1:10:40 have a panel inserted that has a
1:10:42 pre-made hole so that you can have, um,
1:10:46 portable window units. Um, not the big
1:10:49 window units that go in your window, but
1:10:50 if you're familiar with the ones that I
1:10:52 like to call suitcase units, they look
1:10:53 like suitcases and they have the hose
1:10:55 that comes up. Um, so the building will
1:10:57 be prepared to be able to ser or allow
1:10:59 people to have air conditioning in that
1:11:03 >> Hi everyone. Uh, Nicole Wyn, uh, project
1:11:06 manager on the project. I just wanted to
1:11:07 add that every room has an operable
1:11:10 window in addition to that.
1:11:12 >> Yes.
1:11:12 >> Yeah.
1:11:14 >> Just a quick question regarding the
1:11:16 retail along the ground. Um, will there
1:11:18 be any kinds of restrictions based on
1:11:19 the design that won't be permitted in
1:11:21 there?
1:11:24 not based on design but um well and to
1:11:27 clarify there there is no retail
1:11:28 proposed there's a non-residential space
1:11:30 and that will house um the opportunity
1:11:32 center which is owned will be could you
1:11:35 clarify
1:11:38 >> it will be owned by the city and it is
1:11:42 required by some of the funding that we
1:11:43 have received that it is a health and um
1:11:46 physical and mental health facility
1:11:50 >> and we talked about the parking we site
1:11:52 so the we weren't we are not sure yet or
1:11:55 we have not been informed who the tenant
1:11:57 will be by the city but we did allow
1:11:59 parking for the maximum uh usage which
1:12:02 would be a medical clinic. So uh it it
1:12:05 it is able to um handle the parking that
1:12:09 would be associated with that.
1:12:13 >> I I had a follow- on question on the
1:12:15 ventilation. So the market rate building
1:12:19 would that be the equivalent strategy to
1:12:21 be able to have window units in them or
1:12:26 >> to be determined. Um you know at this
1:12:29 point where they are in design and
1:12:30 development
1:12:32 it's unknown. Um they will be required
1:12:34 by the energy code to have an ERV. So
1:12:36 they will have that still for their
1:12:37 fresh air intake. Whether or not they
1:12:39 will opt to provide some sort of cooling
1:12:41 up to them. Yeah. They will probably
1:12:44 have electric resistance heat though if
1:12:45 I had to go.
1:12:47 >> Oh, really?
1:12:56 >> Sorry. Is that to be determined as far
1:12:58 as the heating?
1:12:58 >> Determined. Yeah.
1:13:00 >> Okay.
1:13:05 >> I do have one other question I forgot
1:13:06 about. um evergreen sustainable
1:13:10 development standards like a brief
1:13:12 synopsis of how that differs from lead.
1:13:16 >> Um Nicole might be able to speak more to
1:13:19 how it differs. Uh it was a program
1:13:22 created by Washington state specific for
1:13:25 buildings in Washington and all
1:13:27 affordable housing is required to comply
1:13:29 with it. Um and generally speaking, it's
1:13:33 not dramatically different from LEAD. It
1:13:35 it's different in in the sense that you
1:13:37 know they call things slightly
1:13:39 differently and they assign points
1:13:40 slightly differently and all of that
1:13:42 kind of nomenclature is a little
1:13:44 different here and there. Um
1:13:45 [clears throat]
1:13:46 but the overall themes of what it does
1:13:50 are are very very comparable to lead. Um
1:13:54 and in the ways that it differs it's
1:13:56 really more about being specific to the
1:13:59 needs and uses in Washington because it
1:14:01 was made specifically for Washington.
1:14:07 Uh there was a a lot of back and forth
1:14:10 with the city council uh before we
1:14:12 included that in the housing cooperation
1:14:14 agreement. And one of the things that
1:14:15 they asked us to do uh is a detailed
1:14:19 comparison of the lead platinum to the
1:14:21 the um the ESDS. And what we determined
1:14:26 is there um there was we needed to
1:14:28 choose other additional ESDS points than
1:14:31 what we had originally planned in order
1:14:33 to be roughly equivalent. Um and so we
1:14:36 did that. We're we are exceeding the
1:14:39 ESDS requirements which is 50 points. We
1:14:43 we're our project will have another 20
1:14:45 points plus we're doing things that are
1:14:48 are beyond ESDs like having rooftop
1:14:50 solar. So, um I think that we're
1:14:53 performing uh very much the same as we
1:14:56 would with LEAD. It's just that our
1:14:57 funding sources require that we we use
1:15:00 the ESDS system and so it would been uh
1:15:04 somewhat costly to try and satisfy both
1:15:06 in the same project.
1:15:08 >> Great. Thank you very much. Any other
1:15:10 questions?
1:15:11 >> Just one additional comment in that we
1:15:14 are maximizing our available rooftop
1:15:16 area with IP. So, we're definitely
1:15:19 exceeding what the minimum requirement
1:15:22 >> Great. Thank you.
1:15:25 If there are no other questions from um
1:15:28 the commission, um we'll move into the
1:15:31 public comment portion of the hearing.
1:15:34 Miss Jackson, has anyone signed up to
1:15:36 comment on this topic?
1:15:38 >> No, sir. They have not.
1:15:40 >> Thank you.
1:15:46 Those who are in person and signed up in
1:15:48 advance make comments will be called on
1:15:50 first. If you're in the room and did not
1:15:52 sign up, I'll ask for other speakers
1:15:53 before closing this portion of the
1:15:55 meeting.
1:15:57 Um, is anybody anyone of the public
1:15:59 prefer to comment?
1:16:08 Hearing none.
1:16:16 Does the applicant have any rebuttal to
1:16:18 comments? But hearing none, so I presume
1:16:20 he won't.
1:16:22 Commissioners, are there any objections
1:16:24 to closing the public hearing?
1:16:28 hearing. None. We'll close the public
1:16:29 hearing at 7:47 p.m.
1:16:40 Now, it's time to move into deliberation
1:16:42 portion of the meeting. But first, we
1:16:44 need to make a motion. Is there a motion
1:16:46 on the item before the commission?
1:16:48 >> Mr. Chair, I'd like to make a motion. I
1:16:51 move that the development commission
1:16:53 approve the site development permit
1:16:54 known as the trail head apartments
1:16:57 SDP25-0000002
1:17:01 as described and evaluated in the staff
1:17:03 report dated May 6th 2026 with exhibits
1:17:07 A through JJ and I move that the
1:17:10 development commission direct the
1:17:11 community planning and development
1:17:13 department to prepare findings of fact
1:17:15 and condition or and conclusions for
1:17:17 review and approval by the development
1:17:19 commission chair
1:17:20 Affirming the development commission's
1:17:22 decision to approve the site development
1:17:24 permit known as a trail head apartments
1:17:27 SDP 25002
1:17:31 as described and evaluated in the staff
1:17:33 report dated May 6, 2026 with exhibits A
1:17:36 through JJ subject to the conditions
1:17:39 therein and as amended here tonight.
1:17:44 There
1:17:44 >> a second.
1:17:45 >> I second the motion.
1:17:47 >> It's been moved and seconded.
1:17:50 Is there any commission discussion?
1:17:55 >> I have concerns about the AC units
1:17:58 actually, just the aesthetics of it, you
1:18:01 know, and I don't know if there's
1:18:02 anything we could do about that. I mean,
1:18:04 there was comments about, you know, the
1:18:08 balconies becoming
1:18:10 in um development, you know, planned
1:18:13 developments. We usually have
1:18:14 restrictions on what can be put in the
1:18:16 wall units. So, I think that could
1:18:19 quickly become an isore. Um,
1:18:23 so I'm I'm concerned about that. Just
1:18:24 the aesthetics of that.
1:18:26 >> I think the AC units are ones that will
1:18:28 go into the apartment. They'll be inside
1:18:31 the apartment, but then there's the hose
1:18:32 that um so basically from the outside
1:18:35 you'd see a little circle. That is the
1:18:37 hose that takes out a wall. I thought
1:18:41 you said was like a little
1:18:42 >> I think she's talking about an insert
1:18:44 that goes into the window and it'll
1:18:46 >> Can you respond?
1:18:46 >> Oh, sure. Yeah.
1:18:48 >> Thank you.
1:18:49 >> Yeah, I'm happy to elaborate. Um, so in
1:18:53 the windows, the way they're made and
1:18:55 manufactured, there's a screen panel so
1:18:57 that when you open your window, you've
1:18:58 got a a screen and bugs don't get in.
1:19:00 Um, the AC panel, all it is is that
1:19:03 screen comes out and in place is a
1:19:05 plexig plexiglass piece. So, it looks
1:19:08 transparent. It's totally transparent
1:19:10 and it has a little circle port just
1:19:12 like you're describing so that your AC
1:19:14 unit which looks like a suitcase um and
1:19:17 sits inside your unit has a little tube
1:19:19 that hooks to that hole so you won't you
1:19:22 won't be able to really see them from
1:19:23 the outside. Yeah. Yeah.
1:19:27 Thanks for clarifying that.
1:19:33 >> Other thoughts on the motion. Any
1:19:35 amendments to the motion?
1:19:42 Hearing none.
1:19:45 It's been moved to
1:19:48 approve the amendment, but I'm not going
1:19:50 to read the whole thing again since we
1:19:52 just heard it. uh and seconded.
1:19:57 All in favor say I.
1:19:59 >> I.
1:20:00 >> I.
1:20:01 >> I.
1:20:01 >> Any oppose?
1:20:03 >> Motion carries unanimously. Thank you.
1:20:10 >> This concludes the site development
1:20:11 permit for the trail head apartments. A
1:20:13 notice of decision will be issued by
1:20:15 staff within 7 days.
1:20:20 And thank you very much for the
1:20:21 applicant and for Miss Weber for your
1:20:24 extremely detailed report and answers to
1:20:26 everything. Um, and we'll move to the
1:20:29 next item on the agenda.
1:20:32 Uh, the next item on the agenda was
1:20:34 going to be chair and vice chair
1:20:36 elections, but staff is going to
1:20:39 strongly recommend we postpone those
1:20:40 till our next meeting when our chair and
1:20:42 vice chair currently are present. So
1:20:45 that's all right. That's what we shall
1:20:50 Thank you.
1:20:53 Uh, do we have city council updates?
1:20:58 >> Hi. I am I'm going to I'm going to try
1:21:01 and make this brief. So,
1:21:04 [clears throat] excuse me. So,
1:21:07 city council
1:21:10 and the mayor um would like to see more
1:21:14 development on the ground, particularly
1:21:16 housing
1:21:18 faster than we are getting it. Part of
1:21:20 this is because we need to build out our
1:21:22 regional growth center. We need the
1:21:24 housing. The region needs the housing.
1:21:26 And so we have worked with them and back
1:21:30 in March, city council approved, I
1:21:33 apologize, [clears throat]
1:21:34 approved our work plan.
1:21:37 And on the work plan are 17 items to
1:21:42 address land use code issues and
1:21:45 processing and peer review and so forth.
1:21:50 So I just want to share this list with
1:21:52 you and make you aware of it.
1:21:55 We won't be coming to development
1:21:57 commission. However, we would like to
1:21:59 hear from you. Um, so I just I want to
1:22:03 run through these kind of give you an
1:22:04 idea. We can send Emily can send you
1:22:07 this too. So you'll know when it's going
1:22:09 to council and then when it's going to
1:22:11 the planning policy commission for
1:22:13 public hearing and when we're going to
1:22:14 review it. So if you're interested in
1:22:16 coming and commenting on any of it,
1:22:18 being that you all do what you do and
1:22:20 you have to implement this, it would be
1:22:22 nice to hear from you. So we are just we
1:22:24 were put on a rather uh fast timeline.
1:22:29 um we still want your input how we can
1:22:32 get it. So I'm going to share this with
1:22:35 Before you share it, what what was did
1:22:37 he want to go faster by what 10%. What
1:22:40 was his
1:22:40 >> pardon me?
1:22:41 >> What was his his turnaround time? It
1:22:44 takes so long to approve things. What is
1:22:46 he looking for? An incremental what is
1:22:48 it? Like
1:22:48 >> it's not that it takes too long to
1:22:50 approve things. It's just that we have
1:22:52 our central Isaacqua standards. We
1:22:54 amended the land use code. We completely
1:22:56 redid title 18 and we're still just not
1:22:58 quite seeing what we hope to see as far
1:23:02 as development goes.
1:23:04 >> We do have about,00 units that are
1:23:06 currently in the pipeline and are going
1:23:08 to start being built, but we have a lot
1:23:11 more capacity and we still have targets.
1:23:13 We have we have housing targets that
1:23:15 we're required to meet or accommodate
1:23:17 for and plan for by 2044. And so we're
1:23:21 trying to make sure the development
1:23:23 happens so that we can see those housing
1:23:26 units become a real thing.
1:23:30 >> Okay.
1:23:31 >> Okay.
1:23:37 So I've I've given this presentation
1:23:39 several times and I know that it takes a
1:23:41 while. So, I'm not going to do the whole
1:23:42 thing, but um first one is actually
1:23:44 going to public hearing. The first two
1:23:46 are going out for public hearing on May
1:23:49 14th at the planning policy commission
1:23:51 and one of them is outdoor amenity space
1:23:53 requirements. They thought they were uh
1:23:55 diff we were and I'll tell you first of
1:23:56 all, these came from our title 18
1:23:59 updates. You may recall that we had some
1:24:00 whiteboard items that were too big to
1:24:02 address at the time and so we're going
1:24:03 to come back and visit them now. So,
1:24:05 some of these came from that. some of
1:24:07 that just when developments come through
1:24:09 staff looks at it and goes h that didn't
1:24:11 really work or you know we could we
1:24:14 could improve that so that the ideas
1:24:16 came from that. The mayor spoke with
1:24:18 several developers and we have been
1:24:20 having developer round table roundt
1:24:23 meetings and we've gotten had several
1:24:25 suggestions from them and lastly council
1:24:28 during their council retreat that they
1:24:29 have every year. They had it in January
1:24:31 also had ideas and so we looked at all
1:24:34 all of those lists said these will make
1:24:36 a difference. There are some other
1:24:38 things that will make differences as
1:24:39 well but these things can be done within
1:24:41 the next year and a half that we think
1:24:42 would make an impact. So that is what
1:24:45 the C's and D's and S's stand for.
1:24:47 council developer staff in those lists
1:24:50 and we have run these by council, we
1:24:52 have run these by developers and we've
1:24:54 gotten the okay. So, we're moving
1:24:56 forward. So first two outdoor amenity
1:24:58 space requirements. We just have they
1:25:01 were excessive and right now our
1:25:03 proposal is to only require 30% of the
1:25:06 units to have balconies 48 ft each and
1:25:10 then each unit must have 100 square ft
1:25:12 of open common amenity space.
1:25:17 Stepback requirements we're adjusting
1:25:19 those a little bit. They were
1:25:23 um a little bit excessive. we are
1:25:24 requiring more than one in some in some
1:25:27 situations. We're looking at them
1:25:28 against natural context areas where
1:25:30 maybe you don't need them because you're
1:25:32 already in the shoreline jurisdiction.
1:25:34 You already have a 35 ft height limit
1:25:35 when you're in within those
1:25:36 jurisdictions. So, we're looking at not
1:25:39 requiring those there. Self
1:25:41 self-certification of ADUs. We're really
1:25:43 looking at pre-approved plans and
1:25:44 establishing a program there. Floor area
1:25:47 ratio. We have situations where our
1:25:49 floor area ratio and our height don't
1:25:52 really mesh up. you know, you can hit
1:25:54 the max height before you can hit the
1:25:55 floor area ratio, then why are you going
1:25:57 to go up above that? We're not going to
1:25:58 get affordable housing. So, we're trying
1:26:00 to rightsize that. But at the same time,
1:26:02 we're going to look at our inclusionary
1:26:04 zoning and our development bonus
1:26:05 programs to see how we can make all of
1:26:07 those work together better. That's a big
1:26:09 one for developers. We've heard parking
1:26:12 requirements, we're just going to meet
1:26:14 the new state law requirements about a
1:26:16 year ahead of time. natural context
1:26:18 areas and transparency requirements. We
1:26:21 do agree that those the transparency
1:26:23 requirements, one, they're a little odd
1:26:25 in different places. 75% here, 40% here
1:26:28 if you're above 6 feet, 50% if you're
1:26:30 against a natural context area, kind of
1:26:32 all over the place. So, we want to
1:26:34 streamline it, but we also want to um
1:26:37 make it a little bit more realistic.
1:26:41 The allowing multif family in all
1:26:43 commercial areas is a state law. We're
1:26:45 just abiding with that.
1:26:47 architectural design standards.
1:26:50 We are going to make a little bit more
1:26:52 of a we're proposing to make more of a
1:26:54 menu situation. Right now, our code says
1:26:58 we need this and you must meet all of
1:27:00 these requirements. It's not always it's
1:27:01 not always doable. Sometimes it's
1:27:04 expensive. Sometimes it's not realistic.
1:27:06 So, we're potentially looking at a menu
1:27:08 option there. Same with variances and
1:27:10 deviations. How can we perhaps allow
1:27:14 more deviations?
1:27:17 Now, keep in mind I'm saying all this
1:27:18 stuff. We recognize because this was my
1:27:21 job with the city for ever, but there
1:27:24 are visions in place, right? We have a
1:27:26 comprehensive plan and we have a central
1:27:27 Isiqua plan and we know what we want it
1:27:29 to look like. So, our goal is to do all
1:27:31 of this within the context of here is
1:27:33 still what we're trying to achieve to
1:27:36 keep the city's vision. So, that's not
1:27:37 going away.
1:27:39 Uh peer reviews through block
1:27:41 [clears throat] connectors are sometimes
1:27:42 a little unrealistic. Peer review, we're
1:27:45 trying to figure out what needs to be
1:27:47 peer-reviewed. It gets to be costly. We
1:27:50 don't have people inhouse to do that.
1:27:52 We've discovered through central Isaqua
1:27:54 that oh gosh, look, you pulled up the
1:27:57 pavement, there's a wetland right there.
1:27:59 And our, you know, our stepbacks for
1:28:02 some of these things are 150 feet or 75
1:28:04 feet, whatever it may be, which takes
1:28:05 away a lot of development space. So,
1:28:07 we're trying to figure out a happy place
1:28:09 where we can still improve what was
1:28:12 paved previously and yet allow
1:28:14 development to occur there.
1:28:18 Let's see. Uh, working on more
1:28:22 sustainable development standards, but
1:28:23 again, a menu
1:28:25 talking about what to do with structured
1:28:27 parking around the or structured or
1:28:30 retail frontage wrap requirement. Um,
1:28:33 we're trying to figure out what to do
1:28:35 with that. We've heard that's difficult.
1:28:37 Talking about multif family tax
1:28:39 exemptions, which most cities do, it
1:28:41 would be huge for getting affordable
1:28:43 housing and development back in here,
1:28:44 especially since we require zoning with
1:28:46 our inclusionary zoning. We are looking
1:28:49 at right sizing impact fees. Admittedly,
1:28:51 ours are quite a bit higher than a few
1:28:53 other cities and the potential use of AI
1:28:56 to aid in permitting. So, those are
1:28:58 topics that are all coming through here.
1:29:00 They're outlined by Q1 through Q3. I'll
1:29:02 have Emily send you the schedule and if
1:29:04 when you look at these, please um send
1:29:07 comments and or come to meetings because
1:29:09 you all are the experts and we would
1:29:11 love to have your opinions.
1:29:16 >> Excellent. Thank you.
1:29:19 Are there any other items of business or
1:29:21 announcements from staff?
1:29:23 >> Uh the last item is just the upcoming
1:29:25 schedule. As of now, not anticipating a
1:29:27 June meeting, but it looks like we might
1:29:30 be having July, maybe August for a um
1:29:33 larger PSSE substation expansion coming
1:29:36 before you guys. Um and then just a
1:29:40 couple things farther out in the
1:29:41 pipeline that we can't quite anticipate
1:29:43 yet. The second building of this one
1:29:45 will be coming in eventually. And um but
1:29:48 yeah, so as of now, it's looking like
1:29:49 just a July meeting next. and whatever
1:29:51 our next meeting is is when we will do
1:29:53 the chair and vice chair elections as
1:29:55 well.
1:29:56 >> Great. Thank you, Emily.
1:29:58 Any other comments from commissioner?
1:30:02 >> I would like to make a couple comments.
1:30:04 One is um welcoming Commissioner
1:30:07 Stancheek as a regular member and u
1:30:10 thank you for serving as an alternate
1:30:11 and we're
1:30:13 very pleased to have you as a regular
1:30:15 member. Thank you. Um, and the same time
1:30:18 I would like to um, not many people in
1:30:21 the audience, but I would like to
1:30:22 especially thank uh, Richard Sanford for
1:30:25 his eight years of service on the
1:30:27 commission. And I think maybe of anybody
1:30:30 I've ever served with, the most thorough
1:30:33 reviewer of projects that came through
1:30:37 um, for somebody that was a not from a
1:30:40 development real estate background. So
1:30:43 um, thank you Richard if you're
1:30:44 listening somewhere.
1:30:46 Thank you very much.
1:30:49 [laughter]
1:30:49 >> I hope not. There be no further business
1:30:52 before the commission. I adjourn the
1:30:53 meeting at 8:02 p.m. Thank you.