← Back to archive  ·  All threads

Policy lifecycle

Proposed Amendments to Title 18 Natural Environment, (D)

2 stops across 2 bodies · Mar 10, 2022 → Mar 10, 2022

Summary

Proposed Amendments to Title 18 Natural Environment, (D). Appeared at Planning Policy Commission and Environmental Board.

Timeline

Each card is one meeting where this item was discussed, oldest first.

Mar 10, 2022 Environmental Board
A. The public hearing on March 10th is to get public comments on the draft code updates to the Critical Areas Chapter of the Land Use Code, Title 18. Code changes to the following critical areas are being considered: 1. Geologically Hazardous Areas: Coal Mine Hazard Areas; Erosion Hazard Areas; Landslide Hazard Areas; Seismic Hazard Areas; and Steep Slope Areas 2. Wetlands 3. Fish and Wildlife Hab
Open meeting →
Mar 10, 2022 Planning Policy Commission
A. The public hearing on March 10th is to get public comments on the draft code updates to the Critical Areas Chapter of the Land Use Code, Title 18. Code changes to the following critical areas are being considered: 1. Geologically Hazardous Areas: Coal Mine Hazard Areas; Erosion Hazard Areas; Landslide Hazard Areas; Seismic Hazard Areas; and Steep Slope Areas 2. Wetlands 3. Fish and Wildlife Hab
Open meeting →