← Back to archive  ·  All threads

Policy lifecycle

Newport Way NW Landslide Stabilization Local Agency Agreement Supplement #1 AB 8784

2 stops across 1 body · Mar 20, 2023 → Mar 4, 2024

Summary

Newport Way NW Landslide Stabilization Local Agency Agreement Supplement #1 for a WSDOT project addressing slope failures from a 2020 rainfall event. Council authorized the agreement on March 4, 2024.

Timeline

Each card is one meeting where this item was discussed, oldest first.

Mar 20, 2023 City Council Regular Meeting
Newport Way NW Landslide Stabilization Project Design Contract Supplement No. 4
Action: Award Bid
On February 6 and 7, 2020, a large rainfall event occurred in the region, mobilizing a small landslide on King County Parks property adjacent to Newport Way NW. The slide spilled onto the roadway and resulted in the shutdown of a section of Newport Way NW for roughly one week. City, County, and Puget Sound Energy (PSE) crews responded to temporarily stabilize the slide for the short-term.
Open meeting →
Mar 4, 2024 City Council Regular Meeting
Action: Authorize
On February 6 and 7, 2020, a large rainfall event occurred in the region, mobilizing a small landslide on King County Parks property adjacent to Newport Way NW. The slide spilled onto the roadway and resulted in the shutdown of a section of Newport Way NW for roughly one week. City, County, and Puget Sound Energy (PSE) crews responded to temporarily stabilize the slide for the short-term.
Open meeting →