← Back to archive  ·  All threads

Policy lifecycle

High Street Conversion, Issaquah Highlands AB 7614

2 stops across 1 body · Jun 4, 2018 → Jul 16, 2018

Summary

High Street Conversion, Issaquah Highlands went to Council, which approve.

Timeline

Each card is one meeting where this item was discussed, oldest first.

Jun 4, 2018 City Council Regular Meeting
Action: Refer to Council Land & Shore Committee
High Street is an existing fully developed right-of-way built in 2003 as a result of the Issaquah Highlands Town Center plat (PP02-004IH, FP02-006IH). It currently consists of two 9 ft travel lanes, two 5 ft bike lanes, with a planting strip and 5 ft sidewalk on the eastside of the road. To convert High Street and accommodate the various proposed functions, about half of the existing High Street r
Open meeting →
Jul 16, 2018 City Council Regular Meeting Final action here
Action: Approve
Carried 5-2
High Street is an existing fully developed right-of-way built in 2003 as a result of the Issaquah Highlands Town Center plat (PP02-004IH, FP02-006IH). It currently consists of two 9 ft travel lanes, two 5 ft bike lanes, with a planting strip and 5 ft sidewalk on the eastside of the road. To convert High Street and accommodate the various proposed functions, about half of the existing High Street r
Open meeting →