← Back to archive  ·  All threads

Policy lifecycle

PSRC Transportation Alternatives Program Grant (Newport Way Improvements: SR 900 to SE 54th St) AB 7477

3 stops across 1 body · Sep 5, 2017 → Apr 16, 2018

Summary

PSRC Transportation Alternatives Program Grant (Newport Way Improvements: SR 900 to SE 54th St) went to Council, which accept grant.

Timeline

Each card is one meeting where this item was discussed, oldest first.

Sep 5, 2017 City Council Regular Meeting
Open meeting →
Sep 18, 2017 City Council Regular Meeting Final action here
Action: Authorize Submittal
Carried 7-0
The Newport Way corridor from SR 900 to SE 54th St. was examined in the 2015 Pedestrian Crossing Study and discussed in the Central Issaquah Plan. The Central Issaquah Plan identifies this corridor as a Parkway. The Pedestrian Crossing Study and the Central Issaquah Plan proposed the following configuration of Newport Way NW:
Open meeting →
Apr 16, 2018 City Council Regular Meeting
Action: Accept Grant
The Newport Way corridor from SR 900 to SE 54th St. was examined in the 2015 Pedestrian Crossing Study and discussed in the Central Issaquah Plan. The Central Issaquah Plan identifies this corridor as a Parkway. The Pedestrian Crossing Study and the Central Issaquah Plan proposed the following configuration of Newport Way NW:
Open meeting →