good evening ladies and gentlemen I'd like to welcome you to the public hearing for the proposed permit amendments for khari phases 2 & 3 we have a presentation that will do a reasonable job of explaining the project and what I'd like to do is open up the meeting for some public comment to hear what all you great people that came out have and what your thoughts are and then we'll have some comments after that we'll close that public part and then we'll have some comments you don't expect there to be a decision to make what we're doing is really listening and then trying to pay attention to what's going on we have a few administrative things to do before we get going with that we have some minutes from some previous meetings and so what I would like to ask is for a motion that would prove all three of those minutes unless somebody and if a Commissioner has some comments or some changes to identify that specific meeting note and the changes you'd like to make so you have a small question on page 16 of the minutes on the table row over 70 of 93 I think there is a Commissioner identified there as ro EHL should that be rotor roee ter yes okay and same thing on page 17 the rower is 81 of 93 excellent Thank You mr. chair I move we approved the minutes for July 19 July 26 in August 2nd 2017 great a second great ND discussion further comments all those in favor say aye I posed excellent so let's go okay so good evening Development Commission Keith Niven director of economic development and development services for the city so tonight get to get back into what we do which is review permits we've been talking architecture and urban design for a while and as fun as that was back to work so this one is it's a little bit of an odd duck and I'm gonna start by apologizing because the staff report is really complicated and long and part of the reason for that is what we're doing is we're actually reviewing an amendment to an existing approval which is different than reviewing an application basically where there's no there's just city code to review it against here we actually had to review it against the decision that was made in 1999 and so that makes it a little bit more complicated and as I originally wrote the staff report I thought well how are you guys gonna go back and look at what was originally done and compare it to what's being recommended now and that seemed like a really complicated process to go through and so what I did is I took the original staff report and I actually added commentary and text and new conditions to it and hopefully that that was somewhat understandable as you guys went through your packet this evening so what I'm going to do is is go through a semi brief presentation but then what I would like to do is go through the proposed conditions so that you can understand what was originally conditioned as part of the original approval where that condition lies today and then what new conditions the administration is recommending that we add to this particular application seem like at least for me that was a good starting spot to go through that'll be a little bit arduous but I'll try and get through it fairly quickly and then whether or not the applicant wants to you know provide some sort of commentary or additional information that might be a good opportunity for that and we can open up for public comment and then commission can ask questions if that's the way you would like to proceed okay so project location SoCal khari is located basically on both sides of sunrise place southwest and that's in kind of the south eastern portion of the city it's shown generally by this bubble diagram looking at the project it's really so phase 2 and phase 3 are actually split by sunrise place phase 2 and I'm kind of directionally challenged I think is on the north side and then set the north side that's the east side so the East let's go at East so phase 2 is on the east side and phase 3 is on the west side phase 2 will be adjacent to phase 1 which you can see in this photo which is already constructed phase 3 on the other side of the street is currently undeveloped land and that is undeveloped so what's being proposed right now is 72 townhouses on common parcels so they will be condominiums but they will be in more of a townhouse format than in a stacked flat format Kelkar e phase 1 you can see in the photograph it is more of a stacked flat project than a townhouse project so just kind of getting you kind of thinking about this in terms of different types of housing units and what was originally approved versus what's proposed right now as as you can see from the slide phase 2 and phase 3 originally included approval for 126 condominiums what's being proposed today is 72 townhouse condominiums the reason why we're here so this is technically an administrative decision this is if you look at the city code and you look at what's considered a minor amendment to a master site plan and an administrative site development permit you would basically see that it is a level two review level to review is not a Development Commission review so you could say okay why are we even here we are here because the administration believed that this application was so complicated because it's not just dealing with the old approval site development permit approval but it's also dealing with a binding site plan amendment and a master site plan amendment and we had some concerns from the adjacent community and I'm glad that they are here this evening that caused the administration to say you know what rather than us just review this application and make a decision let's go ahead and bring this to the Development Commission and allow for some additional public comment and that way the process can be a more transparent and hopefully have a better outcome than if the administration just made this decision as a normal faith level to decision so that's why we're here the administration kicked this up to you guys and so you guys are the decision-makers tonight okay and if there's questions feel free to stop me I'm good with that all right so at this point I'm gonna think the Commission can ask questions at this point the public sorry the public will have an opportunity as soon as I get through this I promise I won't take too long no worries so the original condition here is the black text and then the red text is my ad okay so conditions 1 2 & 3 really relate to impact fees what the impact fees were at the time what has been paid and what is still owed I am NOT gonna read through those hopefully you guys understand the impact fee formula for the city and like I said if you have questions let me know condition number four related to street improvements okay for a I'm gonna go ahead and read through these sunset play Southwest shall be improved to meet current Street cross sections or the equivalent and shall have 32 feet of paving and sidewalk on one side okay so we're gonna stop here because in some places I'm gonna admit on a hundred page staff report I gave you there's some technical inaccuracies here we are number one sunrise place Southwest is currently 28 feet and part of this application was a request to leave it at 28 feet not widen it to 30 to 28 feet is basically to 10 foot travel lanes and a parallel parking that's 8 feet wide so that meets city standard and right now our position is that that's wide enough to widen that Street by another 4 feet would actually lead to an increase in speeds on that road because a wider road will lead to people driving faster because they will feel like they have the ability to do that so I so our position is to leave it at 28 and that's why I'm for a write down defying it's complete for B widen and reach channel the intersection of Newports way and Wildwood Boulevard Boulevard Southwest the design tentatively includes separate left and right turn lanes from Wildwood Boulevard Southwest on to Newport Way and a single lane from Newport way on to Wildwood Boulevard Southwest a concommittant I don't even know what that means agreement is also required for full signalization of the center section if warranted by future traffic of which Cal carry related traffic forms a substantial part or accident conditions and if such signalization will cause a demonstratable improvement in traffic flow yes all right so for B so I checked with our engineering department and they told me that 4 B is complete so this condition has been satisfied and there's no additional requirement coming out of 4b 4c the right away across Cal khari shall be 50 feet and shall be improved with as mentioned in for a 28 feet of paving and five foot sidewalks on both sides of the roadway and we're deeming that complete for D the applicant shall sign a concomitant agreement for the cost of applicants fair share of a pedestrian crossing on the Clark Street bridge as required under the mitigation section of foothills draft environmental impact statement page 148 in a traffic study this has been determined by the city to be no longer applicable for e construction of a school bus turn out if required by the school district at the intersection of Wildwood and sunrise place right now that's not required for F replaced the existing culvert at Cabin Creek with a bottomless arch culvert designed to the specifications of and approved by the city's Public Works Department that culvert has been replaced for let's see we're on a this is kind of a this is still part of four so a this is kind of like easements and encumbrances so a is an additional easement area or dedication shall be made to the city as may be required during final design stage to ensure adequate line-of-sight and that's a that's for traffic is provided all intersections and justifications of the roadway system and that's that's that that is required still so we're where the access points are for phase two and phase three out onto Sunrise there will need to be adequate line of sites for cars coming in and exiting at those locations and if there is line-of-sight encumbrances at those driveways or street intersections those will need to be recorded so see provide the city with slope easements or construct retaining walls in the right-of-way at the direction of Public Works per public works requirements for public roadways and show these easements on the final plat that has been done D work with Metro to develop a transportation management plan for that development which incorporates the following provide a free one month bus pass to renters so this is this is this is no longer necessary since these are for sale units having a transportation management plan for a subdivision doesn't really make sense it's not what we do the applicant shall maintain them on five a minimum 50-foot buffer from the ordinary high water mark of you skip me just for D B as in Baker Baker I'm sorry right away for the cul-de-sac Road shall measure 37 feet in width these right away shall shall come city streets I'm gonna guess that's become city streets and shall be improve with 24 feet of paving which accommodates five-foot sidewalk on one side so the current plan for both phase 2 and phase 3 don't include cul-de-sacs they actually include a split tee and turn around and we'll get to that when we get to the site plan so this is no longer applicable thank you and then five is the applicant shall maintain a 50-foot buffer from the ordinary high water mark of Cabin Creek you can see Cabin Creek is actually located so if that's east and west that would be north north of phase one it's closest to phase one which is right here phase two and phase three are farther away from Cabin Creek and so that 50-foot buffer is part of the current proposal number six the applicant shall maintain a minimum buffer of ten feet from the top slash toe of all steep slopes plus maintain a minimum building setback of 15 feet from the slope buffers native growth protection easement signs which are for the identification of protection of steep sloped areas shall be placed at steep sloped areas as required by the public works department so my clarification on this condition is man-made steep slopes may be regraded pursuant to the city code so some of the slopes out on that property we're actually they're not naturally occurring they occurred due to previous grading activities and for the city code they're allowed to be regraded and buffers for steep slopes including protection easements and signage is governed also by section 1810 one clarification on this condition is that right now the city code does allow for some minor intrusions within buffers of steep slopes and I don't believe that the intent of of condition six was to not allow for the city code to apply so so even though this says the applicant shall maintain a minimum buffer of ten feet the expectation is is where the city code allows for some intrusions or within the 15 foot building setback area that as long as they met the criteria from city code that that would still apply number seven prior to issuance of building permit the applicant shall establish a mechanism acceptable to the city which notifies future buyers of the apartment condominium units or Lots that steep slope buffers were reduced and that development has occurred within 50 feet of steep slope the applicant shall execute an agreement that indemnifies and holds the city harmless for development within 50 feet of slope so this is required we do this in other places where development encroaches within critical areas to identify two property owners that hey you just purchased land that either is on an existing or a graded slope and therefore it indemnifies the city from future liability number eight a building permit and Public Works construction permit shall first be issued prior to construction of the project that is also required and then I did add unless otherwise approved by the director so in some cases so this says building permit and works and it is not always the practice of the city to require both the building permit and a site work permit at the same time if you know and if an applicant wants to grade and put in utilities prior to having a building permit those are things we do allow so but I didn't want to give that out right and that's why it says that the discretion of the director number nine prior to issuance of the building permit for phase one the applicant shall make connections between the service areas of the Wildwood and Mount Hood water reservoirs per the approval of Public Works Department to provide adequate fire flow the cost of the connection shall be the responsibility of the applicant phase two and phase three of Kelkar we shall also not go forward until the city can assure adequate fire flow so that is complete those connections have been made and there is adequate fire flow in the area number ten the applicant shall participate in the cost of that proposed four eighty zone water reservoir that is also complete number eleven prior to issue into the building permit Public Works Department shall approve final design of the stormwater system and that is required number twelve the Public Works Department shall have final approval of textured concrete that's proposed to be used across Southwest Sunrise place linking the north and south sides of the project my comment on that is no textured concrete shall be placed across Sunrise place and let us did unless it is determined necessary by the city as a visual cue for pedestrian crossings other means such as pedestrian crossing signage shall be explored the reason for that is although textured concrete is is nice to look at and planners love it and I'm a planner so I can say that it's a it's kind of a maintenance headache for the city and so it is a tool in the toolbox to help cue drivers that there's pedestrians crossing but it's not the only one and so what this condition is saying is is that they should explore other proposed methods to safely get people across Sunrise place than texture concrete number thirteen all compact and accessible parking stalls shall be appropriately labeled its required number fourteen the applicant shall inter discussion with his cost school district concerning bus route access to the site that's been done already number fifteen all significant trees within the vicinity of the site construction that are proposed to be saved shall be protected in accordance with section eighteen twelve one eighty D preservation of trees of land-use code those measures may include but not limited to fencing around the trees that is required number sixteen the area north of building three so started sorry I made you a little map here because I started doing buildings going okay where are we really talking about so the area north of building three so you look at the areas that I have like green blobs on this map that I gave you here those are the areas where this condition is asking for additional vegetation so that is still required and would be done with the landscape permit for this project seventeen all landscaping shall be irrigated is required by chapter eighteen twelve one sixty D of the imc that's required eighteen any changes or substitutions to the landscaping shall be approved first by the development services department these days we don't have a Planning Department before being implemented that's required number nineteen a cash deposit of fifty percent of the value of the landscape material shall be posted with the city prior to receipt of a temporary final certificate of occupancy as required by eighteen twelve Oh 50 a that's actually not a correct citation the citation should be eighteen twelve one sixty a two and the way that that code section reads is it says cash deposit or other surety typically we get construction and maintenance bonds and not actual cash the city otherwise would get robbed a lot probably so we have other guarantees typically than cash could use cash but most developers don't like to post that much cash number 20 a monitoring and maintenance plan for both Cabin Creek stream restoration and the wetland enhancement shall be provided it's complete number 21 a sign permit shall be required to be issued by the city prior to the installation of the monument signs the proposed monument signs shall also have a minimum 2 foot setback from the property line safe sight distance must be met so there is a calque re monument sign out there now part of this proposal is to move it so that would all these provisions in 21 would be required to move for the move all that that not sure that made sense but anyway so 22 parking for 32 bicycles shall be required based on chapter 1809 Oh 30 I or one let's go with one of the land use code bicycle parking racks shall be placed on both North and South parcels of the project site the location and design of the bike rack shall be provided with building permits bike rack shall be included in phase 2 and phase 3 is part of the common area improvements these racks need not accommodate 32 bicycles but sufficient quantity 7 per face shall be provided for guests at the convenience of residents this requirement will be reviewed with the building permit number 23 and and part of that is and I'm looking at a furrowed brow from commissioner morgan part of that is as actually not that we think bicycles are not important it's the fact that as this project has moved from more like a stacked flat condominium project to a townhouse project with garages there's actually bicycle parking in each garage so so you have even though what this is basically looks like on the surfaces that we're saying less bicycle parking is fine it's actually we're saying that there needs to be bicycle parking in the common areas both in phases 2 and phase 3 but all of the garages and each unit will have its own individual Raj will have the opportunity for bicycle parking in the garage so so we believe that there's actually an equivalent or more bicycle parking spaces being provided with this proposal 23 details of lighting fixtures and standards shall be provided with the building permit 24 all common use facilities such as recreational facilities garbage and recycling collection areas mailbox location for yeas management office shall be accessible as required by WAC 11 of three one eight one in addition advance warning demarcation is required at curb handicapped ramps really at this point you know the clubhouse was built with phase one and because this is turning into more of a townhouse project really all we're talking about this point is accessible routes and so the ramp locations is still applicable 25 the following conditions shall be implemented as required by the police department building security requests commercial quality looking mechanisms and deadbolt locks and peep holes on exterior personal doors considerations should be given to security of exterior windows and sliding glass doors to prevent offers entry Lighting's should be provided for personnel entrance and exits you know clearly this condition was written for a different housing type than what's being proposed and so my response back was not applicable for the townhouse project the building and units should contain a highly visible and lighted address identifier for nighttime identification for emergency responders six-inch minimum so so the address piece is still important and these will likely have individual building addresses in addition to potentially like a four-plex may have a particular building number that will be all decided later with building permit an agreement and posting of parking areas for unauthorized vehicle impounds again so there's individual parking spaces for each unit and then there's a number of guest parking spaces you know they will post those guest parking but having an agreement for towing you know will ultimately be a decision for the homeowners association on whether they feel like they need to go to that extreme or not the city's not going to enforce whether they're towing or not from the guest parking spaces it's not gonna happen so 26 the following conditions shall be implemented as required by the C's by the East Side Fire and Rescue at this point the buildings shall be fully sprinklered my comment is if required by code so that's based on a certain square footage per building and whether or not they trigger that is all governed by the building code portable fire extinguishers will be required again if required by code yes stores fittings will be required on fire hydrants and before any combustible materials are placed on the site yes that's still true fire lanes are to be painted red with white letters stating fire lane no parking that's still required and approved monitoring fire alarm system shall be installed again that's not applicable for townhouse project Knox box shall be required the location is to be determined by the fire department again I don't believe that to be required so here are the new conditions based on the proposed submittal number one is increase the modulation in the building fronts from 2 to 3 feet that's actually in the city code i am c o7 440 d to be B is buildings will be a minimum of 5 feet from sunrise place that's to meet the setback requirements numbers see the relocated 10 feet I'm sorry what did I say sorry I was here till 3 a.m. yesterday so a little bit punchy so sorry see the relocated project sign is not approved as part of this permit but requires a separate sign permit I mentioned that earlier D is continue the sidewalk along the west side of phase 3 to connect to sunrise place the additional impacts to critical areas may be mitigated through the planting of additional vegetation so let me take a moment and just point I apologize I'd like to have actually two screens but I don't have two screens so I'm going to use my handy dandy little map here to show you so as you look at the sidewalk along the we established that was East that east-west sorry the west end of Phase three it stops right here you know the reason why they did not kind of curve it up to sunrise place is because this is the buffer for Cabin Creek but I think we can work with the applicant and a mitigation plan to actually get the sidewalk to go all the way to sunrise frankly we have too many sidewalks in our community that just end and getting them all the way to a place where they can then connect to another sidewalk seem like an important place for us to go I am now on E thank you so in lieu of street trees on the private roads serving phases two and three an equivalent number of trees shall be planted on the property this calculation shall be provided with the submitted landscape plan okay back to my drawing so if you look if when you get a plan oh by the way my apologies for how the packet got photocopied that's not the way mine looked if you guys would like 11 by 17 plan set I can get them in the mail to you this week so you'll have them before the next meeting so if you would hence so I can make copy available all right let's let's talk lemme give me your contact information so everybody everybody all right so I will get you guys 11 by 17 plans probably by tomorrow in the mail okay so that way we'll have them plenty of time before the next meeting so if you if you look at the plans on the street that serve these your typical Street section is curb gutter planter strip sidewalk a curb gutter planter strips sidewalk planter strip has street trees in the proposal that we have in front of us they've requested to kind of scrunch down the street section to remove the planter strip there's still sidewalks which we find important but what you get then is you get the loss of the street trees and what this condition is saying is if we had provided the normal Street section we would have had X number of street trees those trees need to be need to find their way into this project somehow somewhere so that's excuse me so that's something that this condition is saying that they have to do with their landscape plan F each garage will be large enough to accommodate two standard parking stalls now I added this dimension in here because they actually asked for a minor reduction to eight and a half by eighteen and the city's standard is is nine by eighteen or nineteen but we do allow eight-and-a-half by eighteen as a standard stall and so we're okay with that slight reduction in with spaces and have room for waste bins and any heating or other mechanical devices so part of part of this condition is to make sure that the garages can actually fit cars because what we find with some builders is they make the garage exactly the dimension of a parking space and then where's where people going to put their their trash containers or the water heater go and once you put all that stuff in the garage it actually doesn't have too real parking spaces and so what this is trying to say is you need to have two real parking spaces and enough room for the other stuff and so that'll be reviewed with the building permit number G tree replacement calculations to meet the tree retention requirements shall be provided with landscape permit calculations will be included in the landscape plan H site work permit shall comply with current stormwater requirements and then I alternate roadways will be private city doesn't see any public benefit to maintaining these streets because they don't connect other neighborhoods and so therefore they will be private and that that's that's it's kind of my thing so if you guys want to ask me any questions before I sit down I'm happy to answer them otherwise I can let the applicant maybe add a short presentation at this point or you can do public you have many choices in front of you there are j3m thank you did I mention City Council went till 3 a.m. last night there we go look at that whoo all right Jay continue phase 2 sidewalk at the southern end of the southern property line and provided pedestrian connection to the existing trail if you look at the site plan right here this is a sidewalk that comes down this row of homes and just ends right here and so what this condition says is this should continue all the way to the south end of the property and there's actually a trail that goes through this open space in between Kelkar E and this neighborhood that's adjacent to it so again no no dead-end sidewalks they should all connect to something k city wet utility easements located locations will be reviewed and approved as part of the final binding site plan so that identifies water sewer storm water building colors will match those of Kelkar e1 colors will be earth tone no brighter colors shall be allowed and M as part of the site work permit the applicant will need to demonstrate how construction of the proposed walls and primarily what we're talking about is the walls along this edge you know this is there's some fairly there's some fairly steep slopes between kind of where these buildings are and this green space and concerns raised by my engineer are how do you build those without completely destroying the open space and so there needs to be some conversations about the actual construction techniques and how that will occur and that I think is all of my comments or conditions at this point all right so mr. chair what would you like to do next provide some time for the applicant okay make any presentation then good evening commission members my name is Dave Macduff I'm with inter-corporate we're the applicant I'm just trying to make sure we understand process here I think our understanding is we'll be actually making a formal presentation at the 20th yes this is just not going to provide a little background yes first one do you appreciate that this is not a formal presentation but a little bit of background in light of what Keith presented so with that I'd like to introduce rich banker from Bayliss he's been our principal architect on this for two-and-a-half years and was also the architect on Kelkar e1 so excuse me thank you thank you Dave that's what I was gonna say my name is rich white Jim with bayless architects 100 801 Main Street Bellevue 9800 4 thank you actually I've been on this projects in 1997 and I recognized one face up there and but we really appreciate the diligence that staff has has worked with us so much over these last a couple years I guess it's been tonight I want you to know that we are ready to answer questions if you have any we've got our civil soils critical areas legal and landscape architect's here if you have anything like that and and we will also be returning on the 20th if you have any additional questions like go through their company names what that would sound like we're advertising and it doesn't seem quite right tonight but they're all highly qualified massive experience in this community in each one of these disciplines I want to really thank staff for their efforts in working with us a lot of the ideas that have emerged that you've have come forward today actually started with our discussions with staff about how can we move forward with this minor amendment and I think they've been incredibly diligent and very helpful the only thing I really wanted to make sure it was understood was how much less this project is the currently approved project which is for six more stack flat condominiums is much greater buildings much more density much greater parking even the disturbance area that we're now working with is well within the bounds of the originally approved and still valid disturbance area some of the areas we've pulled back on for this map here some walls see thinking fair amounts here yeah it's down on the both days this area right along here in the original you'll notice when you get your packet there was doing there was a whole lot of landscaping going on and regrading in this area here we're not doing that anymore the other thing there was it was an immense amount of rework of this Weiland we're now able to stay out of that in total so we're not impacting that yes enhancements the walls that have gotten some attention there's one here and there's one back here now whereas before when you get your packet you'll see that there were 20-foot walls in many many places 20 foot high walls we only have two places now for which the geotech has worked incredibly many many exercises in working through those questions and also their work was done it had a peer review through the city twice so I think we've really tried to be diligent and make sure we did our homework less units less traffic less disturbance area we look forward to your discussion thank you thank you okay at this time I would like to open the floor for the public to provide some questions or input if you do choose to make comment we'd appreciate if you'd sign in and and when you get up to the microphone some of us are getting a little older and would like you to speak into the microphone and and state your name and your address and then make your comments so whoever would like to go first go first thank you good evening my name is linda spring Minh and I'm a resident of a property right by the current Kelkar e building i Linda Spring Minh and my husband and I own a house that we bought when the foothills development was just built we were the first people that moved into our cul-de-sac there's two coldest accent and the street connecting the two cul de sacs on Sunrise place so we were the first ones to move into our neighborhood and when we bought the house we knew that the Kelkar development was happening we actually went to the developers location looked at the plans with our realtor so we knew what we were buying and we understood the development entirely including all the three phases and so I first of all thank you all of you for serving on this panel I read the hundred fifty page packet today and couldn't believe that you all do this every one of your meetings so thank you for what you do I apologize if I ramble a bit and also if I read my notes I don't want to miss anything here so the first thing I wanted to say is about I want to start with a positive and that is that I think the developers and I agree on one thing that this process takes way too long as I was looking back at all of my correspondence and communication on this project I realized it went back for three years I know they've been doing this since the 90s to when the development were first started but in just this restart of the project I was amazed to see that three years has passed and how slow the process is gone I want to talk about the process for just a minute I think that there's a timeline referenced a couple times in the packet and I think it's missing a critical element the the MSP extension application was actually asked for in March of 14 and I don't think that's referenced in here I think the timeline goes back to the 90s and then starts at 2016 but that extension application and forgive me if I don't really know technically what all of these are but what I understood is that the the master site plan extension application that was done in March of 14 was to give a three year extension to the project to allow the project to restart just as a I would like it on the timeline and to note that that extension the three-year extension was done comment was asked for I submit a comment on it and the three years passed or ended at the end of August so I assume there's some wording about it vesting so maybe because this process is ongoing that's still alive but the three-year extension of the master site plan the way I read it has expired correct me if I'm wrong I apologize the other part of the the process I wanted to talk about is the CEPA determination of non significance and I appreciate you allowing comment I know your goal is to have everybody involved in the process and do the right thing for the community and I think to that end you've created some processes that are to encourage input but to put some parameters around it when the determination of non significance was issued it was in December of 2016 and I got to go to my notes to make sure I get this timing right but just so you know I think you are in the spirit of what you're trying to do but I think we need to need to use some common sense to make sure that we're thinking about the time of year so when that happened let's see the I received the letter in the mail I'm one of those within 300 feet of the development so I do get a letter you my neighbor's about three doors down don't I received a letter in the mail on December 21st of 2016 announcing the DNS decision and indicating a 14 day comment period from December 14th one week prior to December 28th of 2016 was open the RO letter was received a week after the two-week comment period started and during Christmas week I sent emails I'm sorry I just want to get my sequencing right on this so I was living for a holiday family vacation the next morning so I hand wrote a note I dropped it in the mail because I couldn't find email addresses of who to send it to I then found email addresses that next day I sent it to two staff members and got bounce backs from both of their emails saying the offices were closed for the holiday surprise and that they'd be back on January 3rd a January 9th respectively so I know nothing is happening at that time then the email I sent and the letter I quickly wrote was you've given us time over the holidays I found out a week after a week into the process and it's the holiday season please give us a three week extension so that we can look at this and respond and I was denied so I think you need to think about that 14 days is great if you're not smack in the middle of the holiday season so please rethink that the next thing I wanted to talk about is throughout throughout the hundred fifty pages there's reference to the current plan and how it relates to the original plan and I find I find the references to that are very valid because indeed it's changed but I think it's irrelevant because who in here wouldn't revisit some decisions we made 20 years ago if you had it to do all over again so just referencing the permit that was issued 19 years ago I don't think is a valid way for this process to happen we've things have changed immensely since then and I the process should reflect that having said that this is beautiful I think this is a beautiful development as it's been presented today I have no idea about environmental or other issues and the way things have changed since 1999 when the first development was done the two things I really wanted to tackle here are one the environmental stability issues I read the CEPA report I don't understand half of what's in it but I know that since this development was approved there have been some significant issues that we've run into in our community and in Washington State we had the Oso landslide we had the talus landslide and even before that and it's mentioned in here part of the foothills development was stopped was cancelled because of a landslide 500 feet from where this is happening so well I read and understood the CEPA report I just frankly don't believe it I think it needs more look so that's my opinion on the environmental I think it I think we need a deeper view of that the latter the fifth thing is traffic I don't think 20 years ago we planned for traffic to be in this situation it is I understand that there's traffic references in here but we have a significant problem at the intersection of Newport Way in Wildwood wild was the street that brings you up to sunrise where this development is I have a correspondence I sound like I write to you guys a lot and I honestly don't in the 17 years I've lived here this I've written like four letters and I've only been to one other city council meeting so I I'm just amazed that all of these things are interrelated that I've been communicating to the city about the traffic it's so bad coming up Newport way to go I don't know the name of the road up Front Street that the traffic is back all the way up to the elementary school most evenings I've taken pictures of it I sent it into the city engineering department I think it is they very politely sent me a letter and said I was wrong when I recommended that maybe they have the right term be right turn only Lane so yes thank you Newport way that backs all the way up to target most nights a week I think you guys are probably all gotten stuck in that traffic too and my my approach was I recognize this is a problem I want to suggest a solution and maybe we can find an answer the letter I got back told me that my solution would not work and it would make it worse but didn't offer another suggestion so I feel like when I'm providing comments we're not getting a option back we're not having a conversation about what else could we do about things so anyhow the the last thing I just wanted to ask and I don't know if it's in this paperwork anywhere but I can probably talk to the developers about it is that I would love to see a project timeline what the build plan is is there a Gantt chart of start-finish dig dirt start you know poundings foundations in so that we can understand if it's going to impact summers and kids out of school and that kind of thing and then the last thing is the there's a reference to the the sunrise place and that it's going to have parking on one side and it's I think it says in the plan that it's a fire zone on the other side but in fact there's nothing posted there's no red markers and during the summer and weekends there's cars parked on both sides of the roads just a little bit further down by the entrance to the trail and only one car can get through when there's cars parked on both side so we need to address that it's parking on one side of the street or not or widen the road thanks for your time I really appreciate it thank you - the mouse the mouse points oh good evening I guess left us crouched down because things not know height I'm Tom McDonald I live at 1:00 2:00 to 7:00 and sunrise space southeast I'm also the president of the foothills Association but so I have a couple items bringing up I'll start with the traffic part traffic is you know the last thing that I looked at was I here somewhere no anyway is really at Wildwood and Newport and what or Wildwood and sunrise but what happens is when you take a while to it back down Newport they will back up to the target parking lot area and part of that is just what's happened over the last couple of years I think when they shut down may Valley Road for a short time for some of the covert and the slide prepare maybe Ollie Road the traffic started coming through his quad now it just continues to come to that but it's horrific and so what happens is people pull on the right-hand lane to go through the intersection to go on to Front Street south and so those to live anywhere on Wildwood going up the hill can't get into Wildwood and so people including me will actually wait for the cars have stopped going the other Lane and cut in front of them to make over left turn on a green light because no one can move anyway so that needs to be looked at how that hold intersections can be worked also on the environmental justice side I don't think any of the neighborhood from the intersection of the Wildwood and Newport have been notified about all the traffic that's going to now be at that intersection they'll be produced by this developer are there developments up the hillside for the record also just want to note that Matt Feldman had written several correspondence letters don't want to make sure that those are noted that those have been turned into the city as well see one comment the signboard that was up there they finally had a date on it and then there was a time and the time was taken off so it just didn't seem like it was accurately publicized that there was a commission meeting tonight until we're kind of got around and in the foothills development I have actually asked that I be put on notification so I can get some note because no one really knew about except the three houses that were then the 300 development a 300 proximity area I want to talk about the slides for just a minute so Tom you need to be at the mic because we're actually on TV and okay on TV there's there's a mouse a mouse a mouse on the tray on the tray kind of belt-high got got a little it'll be little point for you okay so the retaining ball actually starts about right here and that's when this area was going to be developed the hole it slid across road to clean it up and put the retaining wall in so it is pretty close proximity to the existing development that's here so they do have monitoring wells all up in that area so that would be something that it's a big concern that that would both hamper the development here and as well as the rotor axis so copy conditions okay the the lane with 28 foot lane width versus 32 foot lane width it's kind of nice to have less payment but the reality of it is that maybe trying to skirt the the actual requirement or need to have a 32 foot wide roadway what happens as you go further down the road we all have fire suppression systems in our house because the fire department has an issue of not being able to get down the road because of lane width and with parking on one side of the road so I'm not sure if there is planning to have a fire suppression system in these developments efforts gonna be a 28 foot wide road also you can't really turn around within a 25 foot 28 foot road if there's cars parked on one side so what I presume would happen is that people would just go down turn down first place turn around and first place where there's a widened area where all the kids are playing and then come back up the road so that's an additional concern as far as the width of the road and some of the issues that that will that will create a signal at Newport you know I'm sorry signal at Wildwood and sunrise not die before I'd want a signal there it's just like this not another signal in town so I don't think that the traffic would really warrant a signal there but I'd like to see something else other than a signal especially when you look at the grades coming down Wildwood at that one point where it's you're approaching probably probably 12 to 13 percent as they come down the grade line of sight that is an issue and a concern as far as being out if you have cars parked or landscape being able to pull out of these and being able to see down the hill the part particularly and circumstances we're going to be looking to the left where the road is curving to the left back away retaining wall I think and I'm not sure if I understood this correct that the pertaining wall was gonna be on public property versus the which makes a city maintenance thing versus of a retaining wall being on private property which means it's the developers to retain so as tax payer on what my taxes going for paying for someone else's retaining wall that was done on public right away when has she been done on private right away for the development so I'm not sure if I understood it right it has its own private area okay then next up thank you for that clarification [Music] let's see bike racks I had a question letting my shirt ye have bike racks it would be tying their bike up to a bike rack outside they live in there anyway so I would can't agree that I don't know why you need bike racks it just can be vandalized on the bike racks if I'm not sure if they were just for public parking or not but fire suppression system I talked about that and I hadn't heard about the sidewalk buffer oh so the sidewalk as you come out of the as you noted before when you come on the east side between the two where the sidewalk comes up and then connects to the trail well once it connects to the trail that's actually a gravel trail and there are several was probably 12 steps ago from almost where that point where that connection is we can see how thin line [Music] there's a mouse located right here there's a gravel trail and then there's a series of eight wood and gravel steps that come up this point here so this really wouldn't be a DA accessible for coming up and I don't know if we'd want to have a private development connecting to a public trail on the side like that versus coming up and connecting to the sidewalk the garage reduction I'm not sure I understood why the garage reduction of going from eight feet if that reduces the actual width of the house is that the purpose of the garage reduction or is it take you more houses in or is it just okay I think you get that some connection and and then one other comment was if all the federal ATA requirements are are met with the development in this and that's all I have unless anybody else has any other questions so thank you very much thank you other commenters please sign in sorry can I come back for one more comment or am i looks like it [Laughter] the power grid I'm going to show how the power is going to be brought up the street but currently in and sunrise we have lights dim when there's a heavy power draw everything from air conditioners turn on some of the unit's lights will dim and the power for the air conditioner for example the next-door neighbor the power air conditioning goes on the lights dim in the house until the unit is back up so I'm not sure if that's tied to the remainder of the power grid that's along the street here or not so that'd be something I would question as well so thank you hi um yeah I want to thank everybody - for the work that you do I have a daughter who is a fully licensed Landscape Architect and she just joined the Planning Commission in the town where she lives in a story Oregon so I'm real excited for her oh I'm sorry my name is my name is Pat Duke I've lived in Issaquah for 31 years I live at 375 southeast crust on Lane in Old Town and I have just some questions and you know I'm really familiar with Cal Kerry and where it is and all of that where it where is this whole site and the and the development and of phase 2 and phase 3 in relation to that little trail that trailhead that's on Sunrise place right down the street from Kelkar E and then it reverses I guess it goes up the hill which I've never done and it traverses a hill over to Sycamore where is this relative to that how close so that that trail that goes up the hill and then it goes over it is a it's right next to it okay well I do have something to say about that I mean I'm a native plant Seward and I just I love the outdoors and I hadn't been on that trail until recently but it's it's amazing and it's got creeks that apparently are year-round I was there just days ago and it's got two creeks on it that are running right now so we have an extraordinary drought and that means we've got some you know creeks that I don't know if they're considered salmon barren creeks or or not because they connect they run down into is quad Creek and so I'd like to know I like to know more about that it also has some extraordinary timber on it and I and I know what happens when there's construction I mean I remember what happened and tell us when developers just cut down the trees or builders who ever cut them down it's like cut them down pay the fine you know and I would hate to see that happen there's some really extraordinary forest in there some of the wildlife habitat and and plants and everything that are in there you just never never see them in in that you know like huge banks of maiden hair ferns that are just absolutely gorgeous so one of the things I wanted to do tonight is I'm retired and and it's a short hike it's only it's only a mile takes a little bit longer you had to kind of wind down through sycamore to get back but I would love to take anyone on the Planning Commission who would like to go on that little hike it's very very pretty it's a wonderful not with this error but it's a wonderful place to be on a warm day you know it's nice and cool and I just like some of the people who are making these decisions to see what that looks like to make sure that if they're going to do some development they don't disturb that area I also just want to make a comment in general about pervious surfaces and that is we've all been hearing again and again and again with the flooding that was in Houston how one of the really big factors in that and I had coffee this morning with someone in the reinsurance industry as a bunch of actuaries working for them and things like this are really important when they're doing risk assessment and when you take areas like that that basically you can't flood them there so for us said that have so much cushioning it's like a huge sponge that it really does a lot to mitigate flooding and I want to make sure that we don't do something really really foolish to damage that kind of restorative area that we have in our city also so my name is Pat Duke I'm going to put my email address and my phone number on this and and I would just be delighted to take to take any one you could do this on your lunch if you're if you're in the area okay thank you okay other comments well we appreciate those comments we will close the public hearing portion of this meeting now and commissioners I'll open it up for comments from you guys and gals questions well I'll go I'll jump in I guess a quick question then Heath about the potential expiration of the MSP extension or so so what I'll do is I'll give you the short answer and then as usual we will provide a response memo to all the questions and comments that came up this evening so the condition about extension of the original approvals there was a application made by the current applicant that came in while the application was still within that time frame and you know right now miss Brinkman was correct we are beyond that so if ultimately these guys decide to walk away from this project the original kind of decisions have kind of run their term so we are in this kind of moment where you've got this proposal that's in front of us and and whether or not they are going to seek it all the way through to permits and construction we don't know the answer to that today obviously it might depend on how this process goes and what conditions come out of it but if ultimately they did decide to walk away from this and this permit was deemed inactive and done it would put that original SDP and master site plan at an expiration point that would be my non legal answer yeah hopefully it it's semi dives with our city attorney but that would be my take here can I ask insulin please follow four related questions so regarding vesting there were several mentions in the staff report about application of regulations specifically around critical areas quickly our buffer etc is this application continue does it continue to stay vested under the regulations at the time of application or are we applying different the current regulations in some instances against this particular proposal it's it's going to be it's going to be some above so so we tried to there were certain decisions made back in 99 that if you were to apply current regulations it would basically maybe make any project in this location really hard to do and so so we had to use some judgment in terms of which standards were vested and which ones could be brought to current so for example the tree retention was not originally applied to this permit but you know there's really no reason why you know phase 2 has has already been graded so it's not quite an issue for phase 2 but phase 3 as you saw from the photographs is currently forested and you know I think there's no reason why we shouldn't expect that phase 3 should apply so the tree retention requirement should apply to phase 3 so so I don't want to say we we kind of hand-picked some of those but we try to use some discretion to say what makes sense what can we actually put in terms of new standards now some of its procedural so for example right now the city has a number of geotechnical engineers under contract we use Golder and Shannon and Wilson and AMEC and so when this application came in which is different than the processes and procedures we had in place in 99 we had our geo tech engineers review their geotechnical plans because this is a piece of property because of as was mentioned earlier the proximity to the foothills and we know that there was a slight action there and a number of the slopes that were created on Cal khari were kind of spoils from previous grading activities like I can't think from the 60s I'm I don't know the history of that exactly but it like it's from a long time ago and so so from a geologic perspective it's it's not one of those sites that you say oh yeah that looks fine it actually looks different than fine so so there was reason for us to provide an extra level of care when it came to looking at the geology of this thank you question the the lane width discussion let's see on page 63 of 150 that that's where the deviation request occurs to reduce to 10-foot lanes but was that what you were referring to earlier Keith gets it yes it was okay and also on page 34 there's a request to increase the access way for phase 3 from 24 to 26 feet out of those two relate I don't quite understand the relationships there did you say 34 Richard right 34 of 150 the power go to there sorry say that page number again now giving us 34 of 151 34 and I'm like there aren't that many No all right sorry did I mention I was here till 3 o'clock all right [Music] down under background toward the bottom so that's 34 of 94 yeah that we have different documents yeah so use a document in at 94 dead thank you okay all right right that background paragraph right there you guys see that yeah yeah that style my pet project includes my remember too much site plan if I to decrease total my resident units decrease building height your building character minor changes to impervious surface no changing attacks that's increasing face we access place that can do it right there I would say I don't believe I don't believe that to be accurate I believe that so if we're talking about this roadway right here and I think you know if you look at the plans sections and I can go to the plan sheets if we need to do that I'm gonna tell you I think that's 20 feet clear okay we have a we have the applicants civil engineer looking at their plants so hopefully I'll have an answer for you in a second I think we're talking about this yeah so so most of the interior roadways are 20 feet which is what is the minimum required for fire for complete access so I'm not just I think yeah please rich yeah I think that this particular area is referencing what we would often call a curb cut into Phase three so it's off of sunset going into Phase three and it's actually existing Jim we're not changing that drive at all where we you know that yeah and I actually think that one is 26 but Jim can confirm that as we proceed that's exactly sunrise okay and that allows herself around the curve and then it drops to 20 feet okay thank you sure do you mind if I jump in on that since we're on that section and number four allow increase in the impervious from four four seven two four five five and the CEPA says impervious is unchanged at four four seven and I think the amendment requirement is you can have no increase in impervious was that item number for incorrect or very with so let me let me reconcile that piece I'll look at the CEPA decision and if we have a disconnect we'll provide a clarification on that and do I understand it correctly to then on the amendment process one of the requirements was you cannot have an increase in impervious so any of the changes that would be made adding sidewalk along the west side to get to sunrise all of that would in the end we'd have to have no more than four four seven of impervious so the impervious would need to balance out okay thank you suture it's a question Kevin you know I guess we talked about quite a bit about the extreme extension and stuff like that so I'm not going to dwell on that but I think the traffic issue that's everybody's concern about that are we using 20 years traffic data in this project are we doing an amendment to that traffic because you know we talk about every every project this disease you always comes up traffic yeah and school bus and fire lane yeah and and when you were doing your presentation you talked about the fire department approved it I'm not sure what they approve of what they saw because you mean the fire engine comes in and it's it's a dead-end street there and there's no way that they can turn around I'm talking about the West Side I think that's phase two yeah it's a phase so phase two is this one I know the other one phase three yeah is that phase three yes phase three is on the side okay so I'm not sure what they saw what they approve but to me you know they were to approve it I would like to think that they probably wanted to think about how they want to turn their engine around to get back out right same thing with the school bus but I think primarily it's it's the traffic issue the whole city's all everybody's old excited about traffic adding more units and creating more traffic and I can see the traffic that the neighbors are bringing up and how are we addressing to that sure so so both those issues you will definitely provide a more detailed response in our response memo but what I would say is and this gets back to miss spring moons comment earlier about vesting as long as this permit was retained as an active permit it was vested to traffic for a hundred and twenty six condominiums okay so that was put in the city's traffic model it was it's in there what's being actually proposed today is 72 and not 126 so there's actually a reduction in units which is actually a reduction in actual trips even though those trips aren't out on the network today so the backups that we heard about on Newport are real and these cars will add to that but from a concurrency standpoint these these 72 townhouses are already in the city's model because they're part of a permit that is currently in existence and so so that's the that's kind of the traffic and currency piece from a fire department and Fire Department turnaround perspective these ends have to meet the dimensional requirements to turn a firetruck and so I assume that when the fire marshal reviewed these plans the those specs meet their requirements and if they don't then they actually don't go in far enough do you want to do this you can do this so so it so they do review these plans and so you know all I can say is that met whatever their standards are so they haven't seen these new plans yet they have oh they have yeah they review this plan they have proven that they did okay I'm surprised but the other thing too is that I understand what you just said Kevin but the reality of it is that the traffic is there everyday and and we haven't you know the actual thing is that we haven't addressed the new condominium that's going in there us we got more projects in the pipeline the one across from Issaquah elementary school that's another big project that's going in so that's going to add to the Newport way corridor so you know we can talk about the module that the engineering department did and they looked into it it's fine but to explain to the neighbors and people living that area you know it's not fine there's traffic in there in rig we got big projects coming up we got another one in front of Valley that's gonna add through traffic you know how do we explain to them that it is okay are we expanding the roadway are we putting more traffic lights I know we're putting a roundabout there hopefully will help but I just it's hard to explain or let the neighbors understand that it's okay the traffic will be solved I don't think so I didn't say that and but but it's hard because Hartford for everybody for neighbors to do to think that it's okay these are the module says it's okay so the model says it meets the city's concurrency requirements so the issue that the city struggling with overall in terms of traffic is regional traffic cutting through the city so whether it's Newport or SR 900 or 56th or East Lake Sammamish or Front Street the issue is regional traffic which is going from somewhere else through Issaquah to somewhere else the rights that this property have to develop are based on the city's concurrency model and it is vested to a certain number of trips for 126 condominiums which it will not use that many trips it doesn't change the fact that newport has backups it doesn't change the fact that Front Street has backups and sunset as backups the city is dealing with that issue and regional traffic in a different way we just created a transportation advisory board and that has not it actually hasn't been authorized by the City Council they approved a new staff position to staff that board and that board will be created and commenced next year so it is traffic is the number one issue for the city to have conversations about and look for solutions for I don't think that you can fix traffic because the more capacity you build in the roads it will fill up and so so this is but this is kind of the the problem that we're dealing with so from an overall regional traffic perspective thank you and then there will be just just to remind people there will be a response memo made to the comments that were made so that xx you'll get a full is full of explanation is possible on on what what is gonna happen how we see dealing with it and let me just say one thing just in case we end early not that I'm advocating for that for all of you who are here tonight even if you didn't speak please sign up I will make sure that you guys get a copy of the response memo so that you can actually see how staff responded to the questions in advance to the next meeting on the 20th so at your at your convenience public comment period so go over thank you just can you email me so mr. chair can I ask a question related to roads again and there's some modifications that were made in the current proposal with respect to the road profile I'm talking discussion about removal of the median and street trees that are included in the media and etc and I don't know if this is a question for you or if the Keith Court this is a question for Richard Wagner and is that is the road system within the development these three phases of the development is it going to be a consistent kind of look and feel as at the end of this or does this change create a different experience and then second part of the question if the answer that first question is it's going to be consistent and in the condition is to replace the street trees are placed the the street trees that would have otherwise been required elsewhere in the development what's the thinking about how that happens in some sort of a design solution that enhances the project instead of just randomly plans trees on the property let me see if there's two two questions in there okay the first one about the road profiles and whether they're consistent the access down Cabin Creek Lane here will change in its appearance certainly right now it's all graded out and grasped both both sides for Phase two when this when this gets built out what will be different from what was originally approved is that part of the question or just okay originally approved you'll see this in the packet there was parking and access along the front here and then the building set here and here now what we're proposing and those were three-story buildings over one level of parking we're now proposing that the drive down Cabin Creek Lane as well as the drive on Sunrise these are what we're calling our eight units and they will all appear only two stories high and they'll have front doors so this project now will present itself to sunrise and certainly present itself to Cabin Creek once you get past these then these access drives here the shared drives come in here and they serve the garages on this side tables also serve the front doors these buildings here are two stories visible these are because the A's are two on the front with the garage under there are three stories back here so access comes in here and this is a hammerhead turnaround for the fire department over here same profile and what we're looking for here excuse me not quite the same this has wherever there is a unit access on the front of the building that has a sidewalk a five foot sidewalk and a 6 inch curb that occurs over here as well these buildings have both garages and front doors on this side so there's a five-foot sidewalk and a six inch curb on this side again garages and front doors sidewalks and curbs this also the planning department had the idea of maybe we put some type of address or lighting bollard in front of each one of these entries and we're proposing that as well so the character through here you know if you cut a section through here and you'll see that in the app in the packet this character on this road and the character on this road will be very very similar this roads a little different it's a little higher than the clubhouse here a little bit of a great change and it's basically excuse me serving these garages okay so I appreciate that and the kind of move toward more of a residential estrogen scale very much along the road so as far as the street trees are concerned and I don't know how many trees were in the original proposal or required but what's the plan for I don't know if you've gone that far down the landscaping design path yet but what's the plan for dealing with revegetation what's the owner the applicant has authorized a tree survey now and that's going to be implemented we've got out here the other day and stake the boundaries for the disturbance area so we know right we're talking about the idea here is any there will be some trees removed in fact this will probably be pretty cleared out and then coming back in we're best to plant those trees I agree with you you don't want to just drop them in wherever the landscaper drops them in our landscape architect here is Weisman associates Nick is here and he'll be here next week as well over two weeks and they put a lot of effort into making sure there's spaces for these not only the trees in the tree count but also how they're used as an example this area right here and this area over here those trees are clustered around picnic tables and and viewpoints looking out over the wetland so they're there we're using the landscaping to create outdoor spaces can I ask him since we've got it rich at the microphone just another question there was a number there were a number of comments related to trail and sidewalk connectivity can you walk us through maybe a little more detail how this all fits together from a pedestrian and trail user standpoint I would be happy to do that in fact I would love to start the walkthrough with MS Duke as we take a tour the this starting with the the urban setting these are all sidewalks on Sunrise place on both sides that are existing the sidewalks will continue down through here right now there's no sidewalk here and there's a broken sidewalk here by my students ain't broken it's unimproved because this is part of phase 2 but these sidewalks will come down both sides then we talked about the sidewalks in the middle so when we connect to the existing trails the existing trail starts probably well it starts way down here and comes up and it's it's a wonderful hike you don't want to take this if you're on blood medicine or blood pressure medicine it's really spectacular this trail here remains existing the only change we're doing in this trail here and one of the comments picked it up was this area right here the existing stair that comes up there is actually on the private property of Phase two we're going to be reconstructing that and if you walk it you'll realize reconstruction is a good idea here because it's pretty beat-up and we're going to move that trail just to the edge of the project here so it will kind of come up this way and connect to sunrise sunrise the trail continues this way and this is the existing trail now the Squawk mountain trail we are going to put a interpretive center down here because we noticed there's actually a wonderful little kiosk there there's nothing on it so we think an interpretive center would make for this walk to be a far more educational and it goes up to the hill is that helpful yes thank you thank you further comments I've been other questions since we have you up there where to do I don't know if you have this right now but the original building square footage and the proposed building square footage in the original number of parking stalls and the proposed number of parking stalls yes we have all that in the date and I believe it's in the in the packet you'll see that I don't remember it right yeah I don't think I saw square footages and Oh might be on that micro print underneath maybe if I knew how to zoom in I would in the packet there's an exhibit called a1 and it's the it's the site disturbance in wall exhibit and this actually became a driving force in our design concepts but at the very top you'll notice that there's data the total approved gross floor area is three hundred and ninety thousand one hundred sixty three the total proposed gross floor area is two hundred ninety six thousand four hundred ninety five reduction of about ninety five thousand square feet and then learning number of parking stalls I don't have that on this but I do know that it's in the report one of the differences in counting them that you'll run that you'll also see is the condominium is the flats the the existing building phase to the parking a lot of the parking is below the building and there's a quite a bit of surface parking which is also shared by the community center and then because we're now townhomes our goal is to have garages with cars in the garage so when we looked at guest parking it was really a question of how many guests do we think this will have and we worked with the city's current code on that okay well that'd be one thing I'd like to see in the twentieth is what were the original you know given what was proven and I think it was a hundred in don't be benign or in the parking in the parking something like that but how many actual stalls then and now both under building and gas just to be able to see that you know we've got townhomes but hate to find out we have more parking than we had before you will see those in the report but we'll come back we'll highlight those at our next meeting great thank you and I don't know if I remember seeing that exhibit in our package if it's not I will add it as part of the briefing memos there was I tried to not make it to over 200 pages so there might have been some selected Kings not it's always one thing you know there's always one so I will make sure there can I a couple more just and then I'll stop I've got a little more since we're picking on rich I want to pick up one more time so in that there are these are some minor detail questions really but in the new conditions the first condition a talks about changing building model kit modulation from two to three feet and I don't know what impact that's going to have on the building design is that significant or is that something you can easily integrate we've been wrestling a little bit with it most of the wrestle has been really how are we measuring it because as an example we've got three four foot overhangs on some of our parking garages in order to make the garage recede into the shadow but and we have a whole lot of texture when you see the elevations you'll see that not just in material and color but also in modulation what we've not really worked with staff on is in this particular reporter they're referring to modulation horizontally vertically all of the above our goal on this is we don't want these buildings to be flat they really should look very residential and that's why we put a lot of effort into all the entries that you that you'll see in there too most of the entry affect all of the inch the unit entries are covered with a with a they have a small stoop and a cover over it and the cover five maybe six feet in some cases proud of the building itself so I think you'll see we have a lot of modulation in there okay so on the 20th that will be something that we'll spend a lot of certainly taking a look at and thank you the other question on condition l looks like it's a new one of the new conditions it says building colors will match those of calc re phase one which is pretty strong language hopefully you saved a gallery so you can match it so I don't know what the plan is from a color standpoint and that color I am glad you asked actually our original proposal our intent on the whole project was to match our original wording was similar or be inspired by or something like that and staff in all its wisdom came down said you're gonna match so I went out and personally matched those colors and since that time we've also been able to find the original colors from the original approval we will match those colors so so just so just so sticking up for the city's perspective on this it is the beginning of a conversation just a clarification I've always enjoyed Bailey's architecture in thank you very nice yeah what a question that I have and we're talking about color and matching and stuff like that I thought I read something it says the theme that you're going with is the National Lodge is that one of those design themed no it's not it's not mirroring the choices were having in central is equality no this is different so how does that or have we approved the design guide so it was not option it would not apply to this project because it's not in central Issaquah so those standards are just for central Issaquah okay okay how you enjoy your creativity thank you sir thank you favorite subject Thank You mr. chair for the comments thank you for your time this evening thank you I guess one this is more of a comment I guess or suggestion Keith you on a I've got to find your suggestions you had a explanation on your requirement for actually I'm aside the original condition for talking about the 32 feet and the 28 feet and the city thinking that's okay I thought it would be better instead of just saying complete as it didn't complete that to actually include your explanation of the difference and why the city thinks it's okay that way okay I can unpack that yeah thank you on that that and both item C I think so for the comments well there's no use in prolonging this I wouldn't I think there was one thing that I was concerned about and I think would deserve some discussion is the is the looking at what was approved and the current rules and regulations and and some explanation of of how that how that was reconciled okay and and so just the logic understanding logic or the rationality is a bit subjective and so it would help being able to understand how those decisions were made and I would like to thank the excellent comments from the public you know you did a great job and I really appreciate that that's critical to us being able to do our job and to get as good a development as we possibly can that's consistent with the desires of the of the community and so thank you very much for your attendance and with that I think we can adjourn and I would like it noted that it's not 12 o'clock Thank You mr. chair you