Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me well? Doesn't sound very loud. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that will be presenting what is basically the second of two. So last time we were before you, I did a overview and a basically touching on all the different chapters of the central Issaquah development and design standards for, you know, for our analysis of how this project complied with the plan or our development and design standards. So tonight, my presentation will focus primarily on answering a lot of the questions that were brought up last time. I am not going to repeat the same ones, what I call the easy questions last time that I addressed. And what I'm doing tonight is basically most of the follow -up items that we did not have available, primarily the drawings and redesign of some of the elements of the architecture. And also just to kind of, again, touch on some of the more, what we would call bigger concerns, not only from the development commission, but also from the public. So just a quick overview and scope of this project, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, so the developable area is approximately 51 % of the whole project site. There are 2 buildings, Parcel B has an 86 -unit building, which is shown here in the back, more in the background, and Parcel C has 7 units. The frontage improvements for this project includes a roundabout at Northwest Juniper and the Parkway standards application for the rest of Newport Way. And there is also stormwater detention vault on one of the offsite parcel. It's actually kind of just shown a little bit at the edge of this, the Abyssin parcel, which is partially part of this project, but also part of another project. And so as far as location, again, just very quickly, this is in Central Issaquah and in the Gilman District. And the vision in the Gilman District primarily talks about how this area will accommodate residential development and future retail and office. And there's also an acknowledgement of the Issaquah Creek as a defining natural feature. Although for this particular site, we don't have the creek anywhere close to the site. But what we have is the hillside of Squawk Mountain. So my presentation, I broke it down into two sections for, I'm sorry, three sections. So I'll first talk about the tree retention and the steep slopes, then the building design, and then Newport Way improvements. So among the questions and discussion last time were concerns about the stability of the slopes and the presence or potential presence of water in the hillside and the impacts of construction. So just as we have mentioned in our briefing response memo, the hillside has been evaluated multiple times. First, when it was part of the evaluation for the industry. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Uh, this project... Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Um, this project. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me well? Doesn't sound very loud. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that will be presenting what is basically the second of two. So last time we were before you, I did a overview and a basically touching on all the different chapters of the central Issaquah development and design standards for, you know, for our analysis of how this project complied with the plan or our development and design standards. So tonight, my presentation will focus primarily on answering a lot of the questions that were brought up last time. I am not going to repeat the same ones, what I call the easy questions last time that I addressed. And what I'm doing tonight is basically most of the follow -up items that we did not have available, primarily the drawings and redesign of some of the elements of the architecture. And also just to kind of, again, touch on some of the more, what we would call bigger concerns, not only from the development commission, but also from the public. So just a quick overview and scope of this project, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, so the developable area is approximately 51 % of the whole project site. There are 2 buildings, Parcel B has an 86 -unit building, which is shown here in the back, more in the background, and Parcel C has 7 units. The frontage improvements for this project includes a roundabout at Northwest Juniper and the Parkway standards application for the rest of Newport Way. And there is also stormwater detention vault on one of the offsite parcel. It's actually kind of just shown a little bit at the edge of this, the Abyssin parcel, which is partially part of this project, but also part of another project. And so as far as location, again, just very quickly, this is in Central Issaquah and in the Gilman District. And the vision in the Gilman District primarily talks about how this area will accommodate residential development and future retail and office. And there's also an acknowledgement of the Issaquah Creek as a defining natural feature. Although for this particular site, we don't have the creek anywhere close to the site. But what we have is the hillside of Squawk Mountain. So my presentation, I broke it down into two sections for, I'm sorry, three sections. So I'll first talk about the tree retention and the steep slopes, then the building design, and then Newport Way improvements. So among the questions and discussion last time were concerns about the stability of the slopes and the presence or potential presence of water in the hillside and the impacts of construction. So just as we have mentioned in our briefing response memo, the hillside has been evaluated multiple times. First, when it was part of the evaluation for the Inniswood Estate short plat. That's when the critical areas steep slopes analysis was done. And then that's when the buffer and the actual areas of steep slopes or regulated steep slopes were identified. So what we have today for the Inniswood apartments is basically a well -defined area where the development will occur and it's all outside of the steep slopes and the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me well? Doesn't sound very loud. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that will be presenting what is basically the second of two. So last time we were before you, I did a overview and a basically touching on all the different chapters of the central Issaquah development and design standards for, you know, for our analysis of how this project complied with the plan or our development and design standards. So tonight, my presentation will focus primarily on answering a lot of the questions that were brought up last time. I am not going to repeat the same ones, what I call the easy questions last time that I addressed. And what I'm doing tonight is basically most of the follow -up items that we did not have available, primarily the drawings and redesign of some of the elements of the architecture. And also just to kind of, again, touch on some of the more, what we would call bigger concerns, not only from the development commission, but also from the public. So just a quick overview and scope of this project, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, so the developable area is approximately 51 % of the whole project site. There are 2 buildings, Parcel B has an 86 -unit building, which is shown here in the back, more in the background, and Parcel C has 7 units. The frontage improvements for this project includes a roundabout at Northwest Juniper and the Parkway standards application for the rest of Newport Way. And there is also stormwater detention vault on one of the offsite parcel. It's actually kind of just shown a little bit at the edge of this, the Abyssin parcel, which is partially part of this project, but also part of another project. And so as far as location, again, just very quickly, this is in Central Issaquah and in the Gilman District. And the vision in the Gilman District primarily talks about how this area will accommodate residential development and future retail and office. And there's also an acknowledgement of the Issaquah Creek as a defining natural feature. Although for this particular site, we don't have the creek anywhere close to the site. But what we have is the hillside of Squawk Mountain. So my presentation, I broke it down into two sections for, I'm sorry, three sections. So I'll first talk about the tree retention and the steep slopes, then the building design, and then Newport Way improvements. So among the questions and discussion last time were concerns about the stability of the slopes and the presence or potential presence of water in the hillside and the impacts of construction. So just as we have mentioned in our briefing response memo, the hillside has been evaluated multiple times. First, when it was part of the evaluation for the Inniswood Estate short plat. That's when the critical areas steep slopes analysis was done. And then that's when the buffer and the actual areas of steep slopes or regulated steep slopes were identified. So what we have today for the Inniswood apartments is basically a well -defined area where the development will occur and it's all outside of the steep slopes and the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me well? Doesn't sound very loud. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that will be presenting what is basically the second of two. So last time we were before you, I did a overview and a basically touching on all the different chapters of the central Issaquah development and design standards for, you know, for our analysis of how this project complied with the plan or our development and design standards. So tonight, my presentation will focus primarily on answering a lot of the questions that were brought up last time. I am not going to repeat the same ones, what I call the easy questions last time that I addressed. And what I'm doing tonight is basically most of the follow -up items that we did not have available, primarily the drawings and redesign of some of the elements of the architecture. And also just to kind of, again, touch on some of the more, what we would call bigger concerns, not only from the development commission, but also from the public. So just a quick overview and scope of this project, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, so the developable area is approximately 51 % of the whole project site. There are 2 buildings, Parcel B has an 86 -unit building, which is shown here in the back, more in the background, and Parcel C has 7 units. The frontage improvements for this project includes a roundabout at Northwest Juniper and the Parkway standards application for the rest of Newport Way. And there is also stormwater detention vault on one of the offsite parcel. It's actually kind of just shown a little bit at the edge of this, the Abyssin parcel, which is partially part of this project, but also part of another project. And so as far as location, again, just very quickly, this is in Central Issaquah and in the Gilman District. And the vision in the Gilman District primarily talks about how this area will accommodate residential development and future retail and office. And there's also an acknowledgement of the Issaquah Creek as a defining natural feature. Although for this particular site, we don't have the creek anywhere close to the site. But what we have is the hillside of Squawk Mountain. So my presentation, I broke it down into two sections for, I'm sorry, three sections. So I'll first talk about the tree retention and the steep slopes, then the building design, and then Newport Way improvements. So among the questions and discussion last time were concerns about the stability of the slopes and the presence or potential presence of water in the hillside and the impacts of construction. So just as we have mentioned in our briefing response memo, the hillside has been evaluated multiple times. First, when it was part of the evaluation for the Inniswood Estate short plat. That's when the critical areas steep slopes analysis was done. And then that's when the buffer and the actual areas of steep slopes or regulated steep slopes were identified. So what we have today for the Inniswood apartments is basically a well -defined area where the development will occur and it's all outside of the steep slopes and the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Um, there's pride. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Right. I guess this is December. Thank you, sir. Thank you. Okay. Meetings have been, a motion has been made and approved. Any discussion? All those in favor of approving the minutes, say aye. No minutes are approved. Good evening, commissioners. I'm Lucy Sloman, land development manager and your quasi -judicial tour guide for this evening. As you know, this is a site development permit, continuation of the public hearing. Site development permits for buildings over 150 ,000 square feet in central Issaquah are quasi -judicial matters for which you are the decision maker. To do that, we have both procedural due process, which means that we follow certain processes such as notice and the role of the decision maker to people who benefit from the decision. And then substantive due process, which means that we use adopted regulations as the basis for our decision. So I'd like the commission to please read through the six questions up on the screen. It's no for everyone. And then part of it is that all of the discussion and decision making is done in an open setting. And so if the question is whether you've had any ex parte contacts, which is discussion of this permit outside this forum. Does anyone in the audience care to challenge any of the members of the commission? Hearing none, we're done. I'm not sure if the mic is on. Can you guys hear me? Well, it doesn't sound very loud. Um, good evening. My name is Amy Tarson and I'm the senior planner for the city of Issaquah that, uh, will be presenting, um, what is basically the second of two. Uh, uh, uh, of a two part public hearing, um, for the Innisfit Apartments site development permit, um, uh, SDP 16 dash 00006. So last time we were before you, um, I did a, uh, uh, uh, overview and a, uh, basically touching on all the different, uh, chapters of the central Issaquah development and design standards for, um, um, uh, you know, for our, um, analysis of how this project complied with, um, the, uh, the plan or, or, or our development and design standards. So tonight, um, my presentation will focus primarily on answering a lot of the questions that were brought up last time. Um, um, I, uh, I, I am not gonna, uh, repeat the same ones, what I call the easy questions last time that I, um, addressed, um, and what I'm doing tonight is basically, uh, most of the, uh, follow up items that we did not have available. Um, primarily, um, the drawings and redesign of some of the, uh, elements of the, uh, architecture and also, um, just to kind of, again, touch on some of the more, um, what we would call, um, uh, bigger concerns, not only from the development commission, but also from the public. So, um, just a quick overview and, uh, scope of this project, uh, the developable area is 2 .28 acres out of 4 .69 acres. So it's approximately, um, so the developable area is approximately 51 % of the whole, uh, project site. Um, there are two buildings. Parcel B has an 86 unit building, um, which is shown here in the back more on the background and parcel C, um, has seven units. The frontage improvements for this project includes around about at Northwest Jennifer and, um, the parkway standards, um, application for the rest of Newport way. And, um, there is also stormwater detention vault on, on one of the, um, offsite parcel. It's actually kind of just shown a little bit, um, at the edge of this, the Abbasin parcel, which is, um, um, part, um, which is partially part of this project, but also part of another project. Um, and, um, so, um, as far as location, again, just very quickly, this is in central Issaquah and, um, in the Gilman district. And the vision in the Gilman district primarily talks about how this area, um, will accommodate, um, residential development and, um, and, uh, future retail and office. And, um, there's also an acknowledgement of the Issaquah Creek as a defining, um, natural feature. Although for this particular site, we don't have the Creek anywhere close to the site, but what we have is, um, the hillside of Squawk mountain. So, um, my presentation, I broke it down into two sections, um, for, for, uh, I'm sorry, three sections. Um, so I'll first talk about the tree retention and the steep slopes, um, then the building design and then Newport way improvements. So among the, uh, questions that, and discussion last time, um, were concerns about, um, the, uh, the, the stability of the slopes and the presence or potential presence of water. Um, uh, uh, in the, in the hillside and the impacts of construction. Um, so, um, just as we have mentioned in our briefing response memo, um, the hillside has, has been evaluated multiple times. Uh, first when it was part of the, uh, evaluation for the Inniswood estate short plat, um, that's when the critical areas, steep slopes analysis was done. And then, um, that's when the, um, buffer and the, the actual areas of steep slopes or regulated steep slopes were identified. So, um, um, what we have today for the Inniswood, um, uh, apartments is basically a well -defined area where, um, um, where the development will occur. And it's all outside of the steep slopes and the, and the, I'm sorry, in the steep slope buffer. Good evening, ladies and gentlemen. It's time for us to start the public hearing for the Ennis Site Development Plan 1600006. Appreciate you all coming out on this frosty night and hope you feel compelled to provide some additional comments. So we have a few administrative duties that we have to do first and then we'll have a presentation from the city staff. Then we'll open up the meeting for some public comments. If you intend to make a comment tonight, I would sure appreciate it if you would sign the paper on the table right there. And at the appropriate time, we'll call you up and we'll ask you to state your name and then make your comments. So without anything else, we do have minutes from last meeting, the December 7th, I think, meeting to approve. Move to approve the minutes as written. Okay. Second. At the meetings. There's a November 2nd meeting. Yeah.