to maintain parking and provide. Use of that bridge, there is a sidewalk where there is a designated pedestrian. So at the narrowest point, if there are pedestrians Could you call upstairs and ask them to turn the video back on? Mr. Chair, do you want us to use this time to be asking questions or have to do the presentation in the public and then our questions? That's what she said at the beginning, that if we had questions now, we can ask them. If you want to hold off and do it all at once, we can do that. I'm happy to provide clarifications now if that would be useful to the commission. That would help me if it's alright. You say the truck traffic is going to be limited, but my question would be how is it? Is the bridge going to be raided or are there going to be signs or what's the mechanism? There would be signs and the bridge, the example that we've looked at is, he's not answering, okay. The bridge that we've looked at was a five-ton bridge which would take some of the truck traffic if it accidentally ended up on there, but it would be carefully signed because it would not, we're not designing it with the intent that a fire truck, for instance, would go across it. So the pedestrian question is there? Yes. This bridge is a shared surface, so that means that there is not a separate sidewalk, so that the driving surface is the walking surface is the bike surface. I think I asked this question last time, but on the apartment side, it was not permitted or approved with a connection to the road. Can you go back then and require that they now make that a vehicular connection? I think because the applicant is, you're right, if it was a different property owner, we would be in a different circumstance. But at this point, because the applicant is willing to do this, and as you could see previously, imagine if you will, it was a very fairly minor alteration to the parking that was necessary to accommodate this on the senior site, and we anticipate the same ability to, with a minor alteration, adapt it. So I believe that there was, are we still not, have you not been able to reach them? on the way back. So, I believe it was a parallel parking stall that would have been around at that point. So I think it's, yay. So you can see it's a fairly minor adjustment to the parking lot that was needed and we would anticipate maybe one parallel parking stall would need to be removed on the other side. That project was well over in their provision of parking, so the loss of one parking stall would not jeopardize their plan or their ability to meet code requirements. And they're willing to agree to do it? Any further clarifications on this? Number three had to do with ped bike access to the site. I think the piece that we want to focus on here is that in response to public comment and commission comment on the AASs, the applicant and staff put the sidewalk back where the orange line is shown, so there would be sidewalks on both sides of that entry street. Number four was an environmental change to the permits. I'm not sure whether the commissioners commented, but we did receive some public comment suggesting that maybe it was not necessary to reduce the buffer to the creeks and wetlands the full amount that was allowed. Mr. Chair, can I, real quick since we're doing questions on the move and we jump, can we, Lucy, go back one slide? Absolutely. So when you added the sidewalk, it doesn't look like you moved the building, so what moved to accommodate sidewalk on that side of the road. I believe that this retaining wall was shifted slightly, but you can see that there was a fair amount of land available, or horizontal separation between the edge of the building and the edge of the road. So while there was some adjustment to the grading, there was not a need to move the buildings. Thank you for stopping me. So public comment had suggested that it might not have been necessary to reduce the buffer to the fullest extent available and suggested that maybe a less reduction would be possible. The full reduction had been done early in the project when we thought that was necessary to accommodate everything on site. in going back and re-reviewing this, there was a realization that the buffer could be reduced from 100 to 90 feet and still accommodate the improvements shown on site. And so the applicant agreed to do that. The green band that you see at the top was their original proposal. This green band represents the building setback line, so this edge here is the edge of the buffer And in this case, the building setback line you can see is somewhat closer, but no buildings are in it, and we've gotten at least a 90-foot buffer along the creek. Building setback line, as the name suggests, doesn't allow buildings, but other non-structures such as parkings, drives, walks, and such are allowed in the building setback. Land use, I'm not sure, again, that the commissioners had questions about this, but we received quite a few public comments, and so we thought that it might be worth touching on this. Again, there was a strong reaction to the size of the building, the density of the building, the fact that there was a building there, and so one of the things that we wanted to discuss with the commission and the public was that in 2011, before Central Issaquah was implemented, the zoning was professional office. The height that was allowed was between 40 and 65, depending on various features of the site. And there was no maximum residential density as long as a project met the development standards such as height, impervious, et cetera, as many units as builder could or would want to put on site were allowed. Under the Central Issaquah Village Residential Zoning, the height is quite similar. Density is evaluated on an FAR basis, but you can see that it is well under the maximum that's allowed as the base FAR. Lucy, I would ask that in the in these presentations, just for the benefit of the public, when there is an acronym, if you would just explain. Thank you. I appreciate that. We don't hand out decoder rings at the beginning of the meeting. FAR stands for floor area ratio, which is a way of measuring building bulk on a site. I won't go into the exact way you do it, but it has to do with how much of the site you can cover and how high you Another significant topic was views, particularly from Bentley House, which is sort of across the street. I took the cartoon that Amy had done and provided in the memo and for the big picture blew it up a little bit, provided a little bit more detail. Newport is at about 90 feet above sea level. Bentley House, which is, this is the plan of Bentley House across the street, and you can see that there are several rockeries that lift it up quite a bit above the street level. And this line right here is grade line 110, which would be at about this location. As you can see, maybe see, this is kind of a small picture, but the ground floor of Bentley House is a level of, parking, under building parking. So the first floor is up a level. I estimated that it would be about eight feet. The architect, Jim Bedoya, who's here for Gateway Senior, said it was probably more like 10 feet, but we'll stick with eight feet for this particular exercise. So assuming that the drive is at 110 feet above sea level and then you have this level of parking, the first floor would be at 118 or 120 feet above sea level. These are all estimates. And assuming that an eyeball is about five feet above the floor level, the view from the first floor of Bentley House would be at about 123 feet above sea level. The highest peak of the roof is at 130. So this would indicate that some of the views on the ground floor would be changed. I think if you look at the way Bentley House is sited, for many of the units, they're going to kind of look past Gateway Senior more towards the northeast than directly across the street just due to the orientation of the building. And as far as we're aware, we know that residents really value their views and it is disappointing to many residents when their views are changed with development. However, there weren't any restrictions on the development of this property that would preclude any changes to their views. Just a general question. Are there regulations for view preservation in other communities in the city, just as a point of reference? So as a point of reference, some of the urban villages, the master developer has chosen to put view covenants in place. It is something that the city has been very clear that they don't want to be a party to. that can be something that a developer can place upon themselves, but the city has not participated in those determinations. Thank you. Just one question too, the roof line, the top of the roof is the same through the whole building. There is some, a couple of feet variation, maybe two or three feet, but they're not like big gaps. Okay. Because I think as you move further west on Newport, it gets up to what, maybe 98 feet or something in terms of elevation as Newport rises. So the 90 we're seeing here would Right. Newport changes, but the basic pad of this building would not change. And as far as I can tell, using the city's GIS, so this is an estimate, it looks like the pad that Bentley House is built on is relatively level or rising. By that, I mean that This area is at about 110 feet above sea level, but this white area appears to be a driveway that rises up to another entry for the sort of, this back portion of the building. So I think that both buildings are relatively constant or Bentley House is getting higher. Right, and I was thinking the houses to the, you go further west on Newport, those houses there are, relatively this building height relative to Newport will get shorter, right? Yes, and there were some photos in your packet which I included here which, this is from Pinecone Place which is I think maybe that area you're thinking of. And so you get a sense they've added in how their building might appear from up there, and again this is looking at street level. I think one thing I would point out is they are going to be providing street trees and other elements that will tend to soften that appearance over time as they grow in. Thank you. Any questions? So the last item, and again, any items that the commission would like us to speak about, we'd be glad to do so. But the last item that we're choosing to speak about is architecture. You can see condition, this is the same language that was provided in your memo. We have not done any other further edits. But this does show the proposed edits to the recommended condition number 17 based on the commission's comment and public comment last time and now the applicant will talk a little bit about the refinements to the architecture that they've made since our last meeting. For the record, I'm Jim Bedoya with VIA Architects and our address is the tower building on 7th Avenue in downtown Seattle, 98101, zip code. I would like to start by thanking the commission and the public at the last hearing for their input and suggestions and would like to walk through the way we've responded to all of those suggestions and comments and I believe have made some significant improvements to the project. We'll start with the site plan again, even though Lucy has done a Oh, did it disappear? Let's just close it and... Oh, this one. Oh, no, we pulled it out. Oh, I see. Oh, it's answering. Okay. It's not responding. You build those in. Census stress. Don't turn your back on it. Just trying to close things out. Sorry for the interruption, but I would like to start just by walking through the site plan once again and highlighting the elements of the site that have been changed in response to the comments that came from both the public and the Commission and also the staff at the last hearing. So as Lucy pointed out, for pedestrian-bike connectivity into the project, We've added the second sidewalk on both sides of the entry drive coming down to our arrival court. And you may notice that we've changed the orientation of the arrival court to be orthogonal to the southern portion of the building. What that did was allow us to have a larger arrival court and I think an easier one to negotiate in terms of arrival, just a little blow up of that area. We've also added bollards on both sides so that the vehicle traffic is contained within those bollards. The pedestrian traffic comes down either from the north on this sidewalk, and we're working with the city in terms of the type of crossing that we'll implement on either side of the arrival court. So we'll have a safe crossing marking that happens on the north side and on the south side of that arrival plaza, along with the bollards that will separate vehicles from pedestrian. The specialty paving will also act as a traffic calming. It'll slow traffic down at that arrival point. As Lucy also mentioned, we'll have the ability for larger tour buses and vans to turn around further into the site and then come back and pick people up under the port cocher. On the east side of the project, at this second entrance, we have a story of difference between these two arrival points. This is a really important connection to the wetland and to our open spaces that exist adjacent to the wetland buffer. And we've expanded upon those elements by adding a greenhouse and a work shed so that the people that are serious about their gardening can get a jump start on the season. We like that idea. And then we've expanded the paving at that entry point to be a tabletop so that that will be flush with that entry and it'll cross the roadway so the cars kind of come up and over. You've probably experienced these in other locations. And it's a nice way of slowing down the traffic and making a very safe crossing. for the residents and their guests to enjoy the amenities that we've created. There were comments about the architecture. I think generally, I think people were pretty much in favor of the direction we were headed. I think we talked about the way we've modulated the building to break it into pieces that are more recognizable in scale, using the steep pitched roofs with the dormers on each of them to again replicate. kind of the residential qualities in the neighborhood. We've spent some additional time looking at the, you know, we have these sort of three important areas, the main arrival point that's happening on the west side of the project, which is the main front door for most people arriving. We've expanded the roof vocabulary to be more sort of emulate some of the more traditional craftsmen kind of elements by having an exaggerated roof overhang with the knee braces similar to what we're employing on the east side of the project. We've also added kind of a decorative bay window over the port cochere arrival point to help again signal that this is our front door. I think it becomes fairly obvious. We are constricted with how much depth we can build into that area just because of how the internal street and the arrival court has to work. But I think with the addition of some additional seating and landscaping adjacent to the energy gives the people a safe place. We don't show the bollards in here, but they will also help define that separation of car and pedestrians. So I think there's the ability for people to safely wait out for someone to pick them up if they have a ride coming. This is looking from the south, excuse me, back at the building. A few things have changed in this area. As Lucy pointed out, we no longer have a hammerhead that we had in this corner of the site, and as a result of that, we had about a 12 or 13-foot high retaining wall to hold that grade back, but now we've done a series of terraced walls and landscaping, so none of those wall sections are more than eight feet tall in terms of how far they come out of the ground. As we mentioned, there are street trees along Newport that will be added, so it'll replicate kind of the existing tree edge that's on the property currently that will have to be transformed as part of the road improvement and the widening of Newport in that area. But it gives a safe passage for the pedestrians and bikes and a barrier in terms of safety at the edge of our property. We've also expanded that roof vocabulary to the end elements where the gables are coming at 90 degrees to the axis of the building, so there's a similar vocabulary on those elements, and we're also using the darkest colors in our palette to, again, help book in the ends of the building, as well as giving importance to that center section. As you can see in this,