uh good evening uh the development Commission meeting for Wednesday September 3rd come to order first item of business is the approval of the minutes from the last meeting of August 20th are there any additions or Corrections Mr chair I move we approve the meeting minutes of the August 20th 2014 meeting moved and seconded all in favor I opposed minutes are approved good evening uh nice to see a nice turnout tonight what we're going to do again is talk more about a update on the U development Commission on the Costco Master site plan Amendment uh we're going to have a schedule update expectations um a staff report and then briefing response memo and we'll open up for public comment again as we did two weeks ago I'd ask people that want to comment to please sign up and when you do make your comments limit you be I'll try to keep it to five minutes I will keep somewhat of a control on it and tell you when your five minutes is up ask you to honor that so everybody has a chance to speak and we're not here till tomorrow breakfast so with that I'm not sure which one of you guys has taken it but I think Keith is a short STW so um good evening development commission Keith nen uh economic development director so I'm going to start with an apology um I think I sent you guys an email about one email every hour every hour um we received a lot of Correspondence associated with these proposed actions and staff wanted to make sure that you guys received all of those and um I think at this point at least I believe you have so uh starting there so sorry for all the emails but I think you guys are um caught up uh schedule um as the chair mentioned um there is some schedule adjustments and part of it is you know when you get into a process you need to kind of take note of your surroundings and I think as Lucy and I talked about the last DC meeting you guys asked a lot of really good question questions and I think there was no way that we felt like or very little probability that you guys could be done talking about this in one more meeting so what we talked about is you know could we push the schedule could we give you guys another bite at this apple and the answer is yes and so right now you don't need to take another meeting if you guys finish tonight great um we can have uh two Wednesdays from now off but if you need uh to meet on the 17th then um we have set aside the amount of time to do that the second thing I want to talk about is what Lucy and I affectionally call the parking lot and I put the parking lot up on the wall and what the parking lot is is as we sit and talk about the items tonight um some of them can be fairly complicated and we can find ourselves spending the entire night talking about one particular item so if it looks like we're in the middle of a conversation that might want to be lengthy or might want to be be extracted my suggestion is we put it on the parking lot so we don't lose it um and then we come back to it later either later tonight or maybe at the next meeting assuming we have another meeting so I'm going to man the parking lot and as we talk about things if it looks like there's things that need to go into the parking lot I'll go ahead and put them there and then expectations um again just to remind the commission um what we've queed up is we've queed up um uh an amendment to the master site plan for Pickering um a draft development agreement for Costco and specifically the land plan which is exhibit D and the staff report that's part of that development agreement so that is um that's the extent of my introductory remarks and I'm going to turn it over to Lucy at this point that was was Keith niman economic development director and parking lot attendant yes I am and I'm Lucy slowman land development manager for development services okay so um here we are at meeting number two uh looking at the land plan the master site plan Amendment and the development agreement for Costco um last meeting we spent a lot of time talking about the land plan and um uh the commission and the public brought up questions uh We've addressed those uh at least initially in the briefing response memo um tonight I want to focus more on um the master site plan and the um briefing response memo so um first the U Master site plan Amendment so just to take a step back back for a moment um literally excuse me um so the master site plan Amendment this is uh the graphic that Costco showed last time and as you likely remember the master site plan was approved in 1987 and it set very strict Heights uh limits on Heights impervious surface land uses and vehicular trips those are generally all maxed out um there were very high parking requirements and significant setbacks required and um as a result for instance as Costco mentioned last time their last building in Pickering place was [Music] 2001 um in 2012 and 2013 the isqua city council adopted the central isqua plan and Central isqua Development and design standards and rezoned the properties um and so I think one of the things um the ways to think about this is just with any other rezone we are looking at property that had one zone and one kind of land use permit and now it has a different Zone and potentially a different land use permit and that land use permit is one of the elements that's before you um so uh I think one of the things that's um somewhat confusing is that um there's the master site plan that the city approved as a land use permit which contained a billion conditions of which you saw all of them in the staff report we provided you and part of the purpose was that that there was a lot of confusion around that what was in the master site Planet uh what would we lose by um approving this amendment um were there things that we needed to keep track of so although the original staff report on the the land plan you received was actually a joint staff report for the master site plan Amendment and the land plan we have pulled the master site plan Amendment out and created a separate staff report because it just seemed like it needed that level of detail and attention and so the purpose of the staff report was primarily to look at the status of each of the original approval conditions and that was in the staff report you've received and from the staff's perspective all but three of those conditions were done or complete or no longer relevant and before I go on to talk about those three um conditions my question to the commission is do you have questions or concerns about the status of those conditions as we presented them to you yeah I do okay uh under the status of of approval conditions under drainage down at uh Roman numeral 20 says uh the city may take over the monitoring program and then the status is not chose not to take over What's happen not chose not to take over I don't know what uh so it says that the city may take over the monitoring program and I think the response is intended to say that the city decided not to take over the monitoring program and it's remained with the Pickering Place Owners Association not chose not meant that they decided to so thanks okay the the city decided not to um I historically I don't know um how that decision wased um I assumed that that was the city's choice but um I don't actually know the history of that decision any other questions okay so um in reviewing that um staff identified three conditions that we felt should be carried forward into the land plan um and therefore made a part of the actions going forward um one of these was and and the numbers here 678 those are the new the numbers as they would be consecutively added to the previous five conditions that staff proposed so condition number six would be to maintain a 200t setback from isqua Creek as permanent open space and staff recognizes that that 200 feet would be equivalent to tract a and tract a is what is shown uh in Blue on um this slide and in tract a condition number seven would limit the use of fertilizers pesticides and herbicides within 200 feet of the creek and Lucy yeah before we go any further what does that mean limit use of fertilizers pesticide and herbicid what does limit mean once a month twice a week every 6 months what amounts of fertilizers what amount of pesticides what amount of herbicides what does that mean okay sounds like we'll be revising that condition and getting it back to you um I take your point okay and then number eight is um the private property cc&rs as they may be amended from time to time will remain on the property and will govern the use ownership and maintenance of commonly owned areas and Facilities so um the point of this is that that those um common properties are owned by the Pickering Place Owners Association and and the ccnr are the rules by which they govern themselves and how those are to be hand handled and that would remain in place to address those maintenance and ownership issues procedures Etc maybe I'm so but CC andrs are private rules or regulations against the property and you're referencing something that's not under the city's control as part of a condition of a city decision I I just don't know if that's consistent practice out there I don't know that I've ever seen that done so I I guess I don't know that it makes that much difference if the language as you've drafted it says if they're amended in the future or even if they're eliminated by the property owners through the process described in the ccnr to amend those and I guess it it doesn't really matter because their standing is different than a permit condition you w generally put CC andrs in there a permit so I was just confused about kind of the blending of the two right different ways to essentially regulate property one private one through the Kei dying to tell you something so so um so um neither Lucy nor I were here in 1987 so as we kind of got into this even born then um yeah we exactly um so as we got into this I think we were surprised by a lot of what happened in 1987 related to this permit the city is signature to the cc&rs um and so we we actually I mean it doesn't mean that what you mention Mike won't happen I mean there is a scenario potentially where um all of the property owners in Pickering could decide to disband and remove the ccnr you know the difficulty is you have commonly owned facilities and so you know the question is is you potentially decide to you know break that apart and dissolve it what happens to those commonly owned facilities so for example the pond um that's in the middle of Pickering is one of those commonly owned facilities and the obligations for maintaining that are part of the ccnr so it's a good point um this one is a little bit of a funky duck to some extent and I think we're trying to understand it and and deal with some of those issues as well well and I guess the question that the point that I would raise with you um to see if you have a thought on it um I think what we were identifying because we were signatories although at the time Pickering Barn was part of it and therefore the city land was in it and since that time Pickering barn and its land has been removed from Pickering place but we're still on the cc&rs in some way um so I guess um the other option is that this is sort of noted as a finding but not as a condition um because the tool is there and it is the tool that's available to um establish the uh you know to handle these um communal or Community issues um and we're we're not trying to I don't think we're trying to mandate them um I think we were more trying to identify that that would be the tool by which that um those the questions that were raised last time would be addressed yeah you know I I don't know that I have an answer to the question as to whether or not putting it as a finding versus a condition um you know has a significant difference although you may want to talk to legal counsel about having a a permit condition like this as in its legal standing because it doesn't talk about as maybe amended but they could be essentially eliminated too at some point just want to I guess we don't want to paint somebody else in the future looking at this saying what were they thinking back in 2014 so I I guess we want to make sure we're being clear about what we're trying to accomplish by putting that condition on real quick I just uh um while I've got the microphone um on the chair's uh concern about condition number seven I as I read it I had a similar concern about okay what does that really mean from an Administration standpoint or an enforcement standpoint if there's an industry standard or something out there that you could refer to dealing with sensitive areas and maintenance of landscaping within sensitive um or environmentally sensitive areas that probably would be a big help because then you have something that you can refer to from no and and I think I think it really was a good point and we have language that is in development agreements and that's used as permit conditions and I think that's where we'll start by because that's a um u a more tangible way of of directing what that action means good thank you so um this and and my only question for uh the Commissioners is this is the end of my presentation on the uh mspa unless there are additional questions from the Commissioners okay nope too quick sorry Mr chair so I don't know if it's maybe I just need some help um on page it's I was looking at through the development agreement and it may be related to this or not you have to tell me but there's um discussion in the development agreement as soon as I find the page page eight of 28 where it talks about the amendment um to the Pickering Place master plan that authorizes is removal of other requesting parties from the Pickering Place Master site plan as long as they do it before this is enacted so help me understand what that's all about so um so right now what city code says is if you want sorry um so what city code says is uh a a major amendment to a Master site plan comes to the commission and then is decided by the city council and so um basically what Costco wanted to do was with be um on that page is to allow any other Pickering owners to take advantage of the door that they were opening by removing themselves from the master site plan so as the council makes that policy decision to agree to remove Costco from the Pickering Place Master site plan if any of the other property owned owners want to leave now too what that's saying is that they could do that all under this Council action so there's so what the so in the conversations that we've had with the city attorney is that basically we would have to have a written request by those other property owners so at the time that the council passes the ordinance or resolution to amend the Pickering Place master site plan to remove Costco they could potentially remove other property owners who have written requested that as well and so the policy and and the rationale here because I'm seeing a lot of fro brows the rationale here is that Council has already decided from a policy standpoint they have a different vision for this neighborhood in the city it's it's part of the central isquat plan it's higher density it's you know less setbacks it's all these other things and so from a policy standpoint they've already kind of painted the picture of what they want this to look like so as the property owners want out they've really kind of wrestled with and so what this is saying is if there are a number of property owners that want to go now rather than make them go through a separate bureaucratic event um because that's what the code says they could take advantage of the door being open right let's say you know one of the gentlemen in and the audience want to then be removed from the Pickering Place Master site plan they would have to file an application it would come to DC it would then go to the city council and they would have to do their own process so that's what B is trying to say is if anybody else wants to kind of ride the coattails so to speak they can so they could participate in this Bureau complicated bureaucratic process right now yes so exactly so it seems to me that that would be something that we would want to encourage since it allows for the New Vision to actually take shape so so so and and and just to have this conversation fully um maybe not fully because I don't know that we have time for that but um so the master site plan the the words and I'm going to paraphrase the City attorney so you know basically because it's like a contract rezone it it gives property owners rights and so the city's not going to take those rights away from anybody who wants to hang on to them but if people want to be removed from the master site plan you know they can do that and so you're right the more I think the more the marrier I mean if everybody wanted to come now and we could completely get rid of the master site plan in its entirety I think that would be great I think the likelihood that all the Pickering owners will do that is probably low but there might be a few whether they're in the audience or watching at home uh that might might take advantage of this it's it's an opportunity this is our incentive if you will to try and get more of them to be removed from the master site plan because we see that as being advantageous in implementing the central isqua plan okay sorry that was a long way to go okay so towards that end would it make sense to extend it out to say anybody that within 12 months of The Passage would like to do it after they've seen what actually gets passed in um so the conversation so we you can see a lot of strikethroughs in this paragraph um originally we had tried to do something along those lines to basically say hey if Council says this is the right thing to do that you know they basically kind of we could make it more of an administrative process so that doesn't have to be so bureaucratic and have so many steps associated with it basically what the City attorney said is now it's you got to come now or you got to do your own process later because whether it's a resolution or an ordinance it's going to be specific on which properties go and it it that window shuts when it happens have you contacted all the property owners and advised them of this I personally have not I I mean has the city or staff made an effort to let the property owners know that this is one of the items I mean so I'm not sure how many property owners are with us tonight or watching home eating popcorn and enjoying the show [Laughter] but I would think that this would be something like the you know the old what is it 500t radius of letting people know stuff is going on that you might want to put out put out a letter to everybody saying this is something that we're doing and it's a good shot to get it if you're interested in getting out and and I don't know if Jackie wants to mention I mean Costco has been the one talking with the other Pickering owners about this opportunity um there they held uh the mayor and myself and Sheldon uh attended a meeting maybe about two weeks ago that they held in one of their conference rooms for the Pickering owners to talk about everything that's going on and so those that attended that meeting I think heard the message um but I believe that um one of Costco's Representatives has been having that conversation with the other Pickering owners so I believe that's happening I just don't think the city and and they're receiving all these materials so they've received the development agreement and the staff report and and I so not anything that specifically says this is the Highlight that you should note you should note um but that they are receiving all the materials including the master site plan Amendment okay well receiving all of it and understanding what is here with uh multiple colors underlines Blues cross throughs yellows and everything else it's almost impossible to read this document but I would think a letter from the city to the property owners I don't know how many Property Owners we're talking about maybe there's only three I don't know there's there's more than three but there's less than 20 or something you know a letter saying this is one of the primary issues and it's it's something that we're trying to avoid future bureaucracy so if you're interested or think you might be interested this is your time to jump on a bandwagon okay okay all right um so um Keith got to start with an apology I'm bearing mine halfway into the program this evening I wrote you an email last night in which I tell you what I'm about to tell you now and discovered that I had never hit send so uh I apologize for that um the uh briefing response memo that you received had 49 issues or topics that we had identified um grouped into the categories of land plan development agreement and master site plan Amendment um typically uh and some of you may remember this from the seventh and Gilman staff report we would go through each of those um topics or issues as part of our presentation that seemed really um long and so what we have done is focused on eight of them that we thought were particularly um that the commission had focused on a lot and so we're going to focus on those this evening but you are of course welcome to ask us to go back um to any of these for more information Andor ones that we have not brought up um we just thought that this would um seem like the most um important ones to focus on this evening as part of our presentation so the first one was Community spaces um one of the questions was about phasing um each building is required to have a certain amount of community space and that community space would therefore come with that building um the what is the amount of community space required there's a certain minimum amount that's required with each building um the proposals are substanti more than that minimum um in writing this response there was something that struck me that I wanted to point out which is the central isqua standards talk about two kinds of community space there's required community space that comes with each building and significant Community spaces that come with each district and the required Community spaces seem to be more associated with the people who are using that building the people in the immed immediate area uh the significant Community spaces are really intended for the public and um for serving the larger area and it's not that the required Community spaces may not be used um by other people who are not working in that building for instance um but really the significant ones are I think the key ones in terms of being public and publicly used and I make that point just because I think we realize um in thinking about the questions that were raised that maybe community space is not a very good name for that um so we'll just keep calling it required Community spaces knowing that that may not be the best name um and I think I think the other piece is that these are on private property um and so it's the goal is to try and balance being both welcoming and respecting private property rights um some of the questions that have come up to us around that topic um made us think about the Amazon uh campus um and so I just want to talk to you a little bit about that because I think that there's some similarities that may provide some information about how this might be handled um what I've provided here are two blocks from um South Lake Union in Seattle um Terry is probably the most uh well-known Street it has the street car South Lake Union Street car on it um the yellow circles are over s are highlighting two of the spaces that um Amazon has provided um there's a rather large one here that includes a sort of performance um space as well as a route through the block um this one has a sort of a lower space and an upper space um I'm not sure exactly when this Google aerial is from I um think it may be a while ago because if you look at this photo which is um this space right I'm standing out here this way um you this space up here is this space which actually has building over it it's covered um but I think the important uh pieces to point out about this um is that it's not unlike the kinds of spaces that we might get which um you know this is public RightWay and this is private property uh when I originally took these pictures which was probably for the rally or Lakeside development agreement um the spaces looked as they they do in this photo um since then these signs have been added the ones up in the upper right hand corner and I don't know how legible that is so I'll read it which says welcome this Plaza is private property available for public use please share it safely and respectfully with our tenants and your neighbors enjoy and then at the bottom it says if you have any questions about appropriate activities please call and there's a telephone number so um they these were added in the prob the last year or so um but to give you a sense of the way Amazon and I'm not saying this is Costco but the way Amazon has chosen to use these spaces um you can see on this side is a kind of a garden with um a green screen because this is a blank wall and the that's where these women are sitting um reading or looking at some material together um this seating area is appears some time on this side of the plaza and actually the group of people that are here are a group of performers that were part of a art on the- fly um installation so uh that happened all over that um area of um Amazon and part of town so um I just put that out there as an example of how um Community spaces might occur on the Costco campus are there questions before I leave okay uh mix of uses um there were some questions around this the development agreement um aots Costco one and a half million square feet of office space which could include up to 250,000 square fet of other nonresidential uses we want to be really clear the city is a big supporter of mixed juices however the central standards do not require that the uses be mixed we had the same conversation with sth and Gilman um there was a desire and certainly support for them to provide retail but their choice was not to do that um and in terms of Costco while we would like residential to be um part of this part of town or even part of the Costco area um again that is not a requirement um it is at the um choice of the property owner so you know moving forward the land plan does not preclude them mixing uses they could in the future as their business model or the way they um Envision their campus they could choose to mix uses for instance putting retail on the ground floor um and residential could be added in the future that's just not the way it's presented right now so just a question on this one I um so the 250,000 additional non-residential uses as far as um square footage is does um that include development on the existing warehouse store um parcel or is this it could yes it could so they could that's roughly 150,000 square feet now they could take that up to 400,000 square feet not that that model is something that they're thinking about but that they could have a very large retail footprint right there sure okay yeah it it would be nice to see it scattered around a little bit but I understand okay thank pedestrian orientation there were a huge number of um uh things that Rel comments and issues that were related to pedestrian orientation so I want to touch on a number of those uh one is that given the existing nature of this part of town There's um Limited opportuni ities to insert additional significant circulation facilities um there's the Pickering Pond um over here and the isqua creek um we will be gaining a new connection with um the new 62 road which will be great it'll be multimodal bikes Peds cars um which would which we're all looking forward to um and in general the way the what the land plan depicts is an a Improvement in the frequency of pedestrian connections as you remember probably from last time there are um connections planned between each of the buildings um that will be generally available to the public as well as um connections through the buildings that would be available to Costco employees and their guests um in terms of other things that impact uh the pedestrian friendliness of an area um the land plan shows a you know a significant shift away from surface parking uh currently the whole um southern area where building 4A and 5A are five are shown are currently surface parking lots um building six will go where there is a Surface parking lot uh there will remain some small surface parking lots in front of these buildings as well as this one um we feel that the central oqua standards provides um sufficient tools to address those small scattered parking lots um when and if they occur um and I think the other um piece of pedestrian friendliness to touch on um streets and the orientation to streets is really a critical part of Central isqua and um for some uses that will mean buildings right at the back of sidewalk and um you know for uh a very public use like a cafe or a store that would be appropriate But Central isqua also recognizes that there are some uses that have a heightened need for privacy or security that may need to be slightly set back from the sidewalk um and uh offices are one of the uses and there are quite a few references throughout the central isqua standards about offices being setback um a certain amount with certain kinds of treatment of that setback um to both provide the security or privacy and wh while maintaining the uh a positive character along the street so I I just want to go back to one a point I raised in the last meeting and that's regarding the trail that runs on the east side and the kind of the connection that occurs down at the South east corner where uh and just looking back at the documents that um were provided in for the uh first meeting that I I just think we're missing an opportunity to really take advantage of that trail and integrated into what happens on these properties um it's like I said I think used the term last time the the project feels like it turns its back on the trail the garage we raised concerns about that with the garage gar project and this project continues to feel that way and there's no you know creating of community space back there um you know uh a a nice visible connection from the trail into the property really the only connection is is the street the new street whatever it was 6 I don't remember the name the street back there but the new road and it's just so it seems like we need to somehow um really encourage integ ation of the trail and inviting the people who are using the trail to come out and um take advantage of this part of the town so there are a couple of elements I'd like to point out just to see um if they um alleviate your concerns I uh so one point would be that there are going to be more frequent um pedestrian connections such as these that are available um to the public connecting both that trail to the the street um the second uh point that I would make is while it's true that the um uh what we're calling the community spaces are located along the street which is the way the central Isa standards are written um uh and and you're right that the central isqua standards also want us to have a strong relationship to those kinds of facilities like creeks and um uh other critical areas such as a wetland um Costco has proposed on the backside uh the kinds of semi-public spaces which they have located um all along this side of their project uh which you know are often used for seating there are often uh where um uh lunch lunchrooms and other kinds of more public uh spaces are located and so they have shown those along the Creek and I think our thought was that those kind of semi-public spaces facing the creek um met the intent also in the answer I think that um Costco provided and they may touch on a little more in their presentation um they really do see these as four-sided buildings so it's not like there will be a building designed with a back towards the creek okay does that help that helps I guess I'm just um want to keep that as part of a an awareness um as this project continues to evolve in its de development and and it's on the parking lot so now I'm good thank you I have a good parking attendant um building 4A was another one that came up and and I put it here because uh we revised the condition and it seemed too uh important to draw attention to that um the comment uh the this uh image on the left was in the staff report and um there was a concern that in our identifying additional building space being provided in this location that we might uh impair um the op an opportunity for additional community space or views in Vistas which is an important part of Central isqua so um part of what we were responding to um with that little red square was um Central isqua Standard 11.3 which um requires that there be 60 feet of building extending back in each direction from an intersection um and I think that we have some concerns about that area being used for community space one is because um these roads may have uh some volume of traffic on them and we already have a community space fairly large community space shown on either side of this road and we really want those to be successful however we do have some concerns also that there may be conflicts with views and Vistas and so we revised um just there were a series of bullets under condition number four and I'm not going to make you go through them all again but the um one related to this little um piece right here has been revised to add um that uh the southern wing of building 4A needs to fulfill the corner requirements to the extent possible given the intersections acute angle and opportunities to preserve Andor highlight views and Vistas so in other words when we get to the point of them proposing building 4A we see the kind of building they're proposing really go out and study the site with them um have our community conversation that will be a great time to really look in detail at what is appropriate at that particular corner in terms of balancing a number of um design standards Sky Bridges um that was another um piece that we spent a while talking about um and where some changes have occurred um Costco currently has two existing Sky Bridges one here and one here um the land plan proposes more essentially one between each pair of buildings um which are the um yellow dot dotted ovals you see up there um there were concerns about the impact to the critical mass of pedestrians on the street would it feel like there are enough people around um I think that off Street staff has felt that um the use of Sky Bridges to maintain a secure campus while allowing the permeability of or frequent um pedestrian connections between the street and trails seemed like a good balance um in the sense that if uh we did not have some of these Sky Bridges uh what might result as an even larger building to maintain that secure campus um so that um to staff seemed like an acceptable balance um there were concerns raised around architectural design the commission hadn't hadn't had an opportunity to see the eight criteria that are in the draft of the development agreement that you received um two of them uh we thought were uh important um in addressing some of these concerns uh as well as the images that were in the staff reports and we felt like that provided us with sufficient tools to um make the sky Bridges a positive architectural element I think um where both U staff and Costco heard the commission's concerns were um potential impacts to um the views along Lake Drive that we were just discussing with building 4A and so um we uh in talking with Costco we all agreed that it would be appropriate to reduce the sky bridges that were allowed outright to cross the rideway from two to one now they get to pick which one um but the proposal the response back to the commission is to reduce um uh have these as being Alternatives not both both allowed outright uh just a comment about the sky Bridges I don't know what the the thought was um um one of the commissioner when they made that comment about Sky Bridges and I guess my thought is that Sky Bridge yeah it it uh blocks The View as we're coming down on um Lake Drive but you know you can make that um into something real nice where it's see through glass and uh and partly you know maybe put some kind of advertising Fair uh that's going on and that kind of thing and then let the sun come through you can make that really nice um and I don't think it's a negative thing to have a sky Bridge there and um I don't know where we're leading by saying let's eliminate one sky bridge and have just one and then this one is going to be solid block no penetration um I I don't think we want to go that route I would agree with that there is a requirement that the um Sky Bridges be at least 70% um glass transl glass yeah yes yeah yeah and and you can make a real nice Sky bridge out of that I'm sure Costco or M can be creative about that yeah so that's just my comments sure I'll I'll just try I I I get very conflicted about this because I could understand the desire to move people between buildings easily and out of the weather and so forth so forth but the um a big part of the central esqua plan was to activate The Pedestrian experience and create a better pedestrian world than the 70% development of parking lots that we had and to the extent that we take people and put them in the sky Bridges Crossing around we have fewer people out experiencing The Pedestrian world and I know it gets rainy and dark and everything around here but um I think when you showed the pictures of the Amazon campus I don't remember any Sky Bridges they have down there and lots of people out on the street so I get very conflicted I can understand the desire to do it uh but I I don't think it fits with the central isqua plan intent so just uh I'll weigh in since I weighed in on this I think at the last meeting a bit um I appreciate the movement toward and recognizing you know there are challenges be between meeting kind of multiple interests here in the in Costco's desire for a secure campus convenient comfortable access to and from buildings um so you know I'm not going to fall on my sword on this one but I I Sky Bridges across public properties and across public roads continues to be I'm not a fan um for exactly the reasons that commissioner Morgan expressed and and just from a uh experience as you're traveling the street um I think architecturally you can make them interesting I think one of my concerns last time was some of the examples that were provided in the packet weren't so exciting um so some work would need need to be done to make it uh something that's an interesting um feature and not just a glass horizontal glass tube um so I I guess uh at at this point I think we've made progress I think you need to be very strategic about how you locate Sky bridges too I think once you're back on the private property I don't know that I have a big issue with that I think that what you talked about in the way it allows for buildings to be separated so you don't have long large mass building to provide that security at the same time I'm not I don't work for Costco so I'm not quite sure how they are organized and how they have to travel between buildings but generally departments are together and from time to time they need to travel from one department or one building to another um but it just from my point of view um less or no Sky Bridges is better than more sky Bridges so um but I appreciate the effort to really work through this a bit and respond to the commission's concerns so thanks and if I I'll throw in a clarification too the the between buildings on the property itself I'm fine with that it's the it's the one over the right of way and maybe one possibility would be to to design the possibility like the one skybridge that shown in the lower picture designed the possibility of having one but not allow it unless it was shown that there was a risk if there's too much traffic on the road and a risk of conflict with pedestrians and traffic that they could show that it would be better to have people away from that traffic maybe be able to allow it later on so thank you okay and if I'm I just have to throw two cents in just because I do um so so the thing about it is um you know Sky bridges for all the reasons you guys have said has it's kind of a it can detract from what we're trying to do on the street um I think we all recognize that Costco is looking for um some security on their campus and having those buildings connected via skybridge you know actually adds some value versus building really giant buildings you know where you basically could put the same amount of square footage in one building or you could break it into two and connect it with the skybridge you could say well I'd rather have the two smaller Footprints connected by skybridge because then there's views and other things that happen in between um my worry about potentially wrapping this around pedestrian safety is now you're potentially opening the door for Sky Bridges throughout all of kind of CIP so just I just want to kind of throw that out there is I I think we want to be careful with Sky Bridges I think used for particular purposes in limited spaces could be okay but the pler of sky Bridges throughout isqua would probably not be what any of us in this room want so that was my two cents I think your a question about or your sighting of Amazon was probably apt relative to that point there's probably as many people moving around that campus and having to move between blocks as there um is here so probably The Pedestrian conflict wouldn't be the the um Tipping Point shall we say okay okay um um sepa or the State Environmental Policy Act uh that was you guys had a lot of questions around that so um hopefully this will help to clarify that um Central isap uh had an environmental impact statement or Eis and that established a development threshold for the urban core of 2.4 million square feet of commercial without additional sea review so um that means that those impacts have been looked at and as a planned action ordinance there's a you you're generally saying does is this consistent what was with what was shown in the Eis and if it was then that's the extent of sea review um and typically when you do these kinds of um environmental impact statements as businesses come in it's on a first come for basis and um Costco was part of developing that Eis and so um they are first um Pickering place um 1.5 million square feet that we've been talking about is a subset of the overall 2.4 million square fet that was anticipated in the urban core uh there was other uses that were reviewed in the Eis for the urban core including almost um 5,000 multif family units and almost 500,000 square feet of service and Retail um but I think there are a couple of points to make here one is that this is a 30-year plan and um will have to be Revisited um periodically which may uh necessitate additional environmental review or consideration by the city um the other thing is that um if a project exceeds that uh threshold uh that doesn't necessarily mean there's another Eis um what it means is that there has to be a review to determine if there are unanticipated um impacts uh and there may or may not be and so um that would be the action that would be necessary um if a project wanted to propose something beyond what was already covered in the Eis oh and um Mel asked a question um in an email earlier today um rally is a separate had a separate environmental impact statement so they are not a subset of this uh threshold great things see so the 1.5 million square feet it the package said it would use up Ed up much of the office square footage what how much is much well so the the total is 2.4 million and this is 1.5 so that leaves 900,000 square feet of commercial in the urban core so you if somebody came in and wanted to build a million square feet of office they or 900,000 they could it's it doesn't have to be just service retail tell 500,000 or right there is still additional unused uh uh square footage that was reviewed as part of the Eis so if if you came in let's say you came in and and the package right now is there's an extra half a million square feet of retail and let's assume that somebody came in and said you know I don't want to do a half a million s feet of retail I want to do 250,000 ft of office okay so what you need to do is basically you you take a look at the impacts of office versus retail and for the most part office is less impacting than retail retail is a higher trip generator um you'd basically take a look and see if doing that caused any impacts that weren't already addressed in the central isqua plan um Eis if the answer is no then you're kind of out the door and you're good if if let's say it does generate an impact that wasn't evaluated with the original Eis you would have to do additional environmental review so do so does it mean that that anybody that wants to do any office if this is approved any proposed Office Buildings in the central are in the urban core would have to go through that process outside of rowy and of Ry Costco no there's still because this is only 1.5 there was 2.4 right right is it does the 24 is 24 just office or is the two4 it's just commercial so which includes office but does not include the 497 of right service retail that's separate oh okay so there's 900 out there well there's 900 right of commercial which would include office okay and then almost 500 of service retail gotcha and then and 4,800 of multif family right so to take Keith's example if someone came in and said I want to do a million MH you could take the 900,000 of commercial and then for the other 100,000 look at the retail and whether there were unmitigated impacts got um or not so somebody comes in wants to do 200,000 it fits within the 24 you're still okay right all right so I guess one of the thoughts I had about this my concern one of the concerns would be 15 years down the road everything's going great things are being built out Costco's built a million square feet of more space they still have a half a million square feet in their pocket and everything else is built out and do they sort of sit there and hold the cards of everybody else's sort of stuck in the queue not being able to do something and wondering if there's a way to uh I guess revisit this down the road to say okay if it if it hasn't built let's say they don't build anything out for 15 years if it's just sitting there undeveloped is there a way for the city to go back and say we need to rethink this reservation of all that square footage so I'd answer that a couple different ways one is I mean if if developers are knocking down our doors to build in central isqua plan then I think what that telling me is the Market's great and we don't need to do a thing let the market figure itself out because it doesn't mean just because the entitlement that was evaluated with the Eis is done that that puts a moratorium on development in the rest of the city it just means that additional sepa has to be done and the advantage of having the planned action ordinance is gone if on so but let's take a different scenario and 15 years from now Costco is doing whatever they're doing and let's just it doesn't matter uh but let's say that we have another project on Gilman that wants to happen and doesn't because you know it's it's it's on the Tipping Point on whether it makes sense for the developer and you know the environmental review is going to take a long time and it's kind of a discouragement the city could choose to do another Eis to entitle that next block of development that would then clear the way for more properties to redevelop under the CIP so the city could take the the initiative to help facilitate that next phase beyond the first 2.4 million that was evaluated with the initial planned action e so it doesn't mean that it's at the end it means that we all get to like look at it and decide you know should we help incent additional development or is the market doing what it should and and it's we primed the pump with Costco and with Rowley and some other things and now it's it's going on its own great okay okay uh development commission's role in the review of future permits um so there were some questions around this this is a slightly different process than um what happened with uh other Central isqua permits and so uh I want to unpack that a little bit um the land plan which is before you right now is really the commission's opportunity to review and approve a permit and this is similar to other land use permits in that sense some information such as specific designs for the landscape the community spaces in the buildings are not included in the land plan drawings um however um we have imagery um which were the photo sheets that uh Costco provided as well as the existing campus which um do Set uh um sort of minimum minum bar and the character and the design that would um be employed uh for those future phases uh future buildings and in addition to um this review the commission and the public would have another opportunity to uh comment on the proposals as they come in in the future assuming that they're over 150,000 sare ft because that is the threshold that Central isqu at for for what has public um review versus administrative only review sorry I have a lot of questions tonight um Sorry so this is an area I got a little hung up last time because we're still trying to get comfortable with the process changes that occurred with the central isqua plan so bear with me here a little bit so in this particular instance we are going through a process of reviewing as you said the images and essentially the site layout um and we're going to make a recommendation to the council who is the authority the decision-making Authority for development agreements so I understand that there will be multiple buildings that will come back through for entitlements for well for construction permits as this um as Costco proceeds with their office Park development or their office um um campus so but those when they're over 150,000 would come back here for a Community Conference we would give our two cents and then then staff um would make the ultim would be the decision maker the director um or whoever the designated Authority is okay so is that an accurate restatement of what you just said okay I got it that was actually way more detailed than what I said thank you the other the other process for let's just say it's a separate parcel of property it's in the central isqua plan area and it's over 50,000 Square fet it comes to the development commission we'll do a Community Conference but we're also the decision maker for those entitlements is that right so no there's a a slight adjustment so um like this permit they only come once you don't get a Community Conference that's an option that an applicant could choose to take um but a community conference is no longer required okay um but you would be on those um in this case it's a Consolidated permit so the council is the decision maker but the council is really looking to the commission as you normally do to provide the really in-depth review of the land use permit uh with those uh say seventh and Gilman as we take an example uh you are the decision maker but you're doing the same kind of review that you're doing now um a Community Conference would not occur with SE didn't occur with seventh and Gilman and would not have to occur with any other buildings over 150,000 Square F feet okay under 150,000 square feet they wouldn't even come to the commission that's right so and just a Nuance point because I think it's an important one is if Costco so let's assume those three buildings that are on their land plan end up being four story buildings you know that if you do the math that accounts for only about half of the entire ement that Costco is getting with their development agreement which means that the other 750,000 Square ft is going to be built on buildings that are not part of the land plan those assuming they're done in 150,000 square foot increments or more they would come to DC for a decision like any other property in the central isqua plan area right since they're outside of the area that's defined within this land plan plan that will be approved as part of the development agreement yes but you just said 750,000 actually we're giving them 1.5 million square ft so I think what Keith is trying to say is maybe not very clearly I'm just maybe I'm tired tonight these four buildings are shown on the land plan and assuming that they stay basically as they're shown um these you're reviewing and approving these buildings now but they could be between four and 10 stories that's what they've been shown as if they're 10 stories they're done they will have used all their 1.5 million if they're four stories there's a bunch of uh uh allowable development that is not accounted for and would show up someplace else uh and that would go through the process just like the seventh and Gilman projected okay so where I'm going with this is the level of detail that we're we're working at with the land plan review versus the level of detail that we're typically working on previously prior to the central isqu plan is significantly different where we had architectural renderings much more detail material selections were were part of the review Etc and so uh this is really we're moving the blocks around on the property and that's about the extent of our review and I'm simpli oversimplifying a little bit just to make my point so it it's um there's the the shift here is a huge movement toward relying on professional staff for the review and and um away from what was a level a detail level review by the commission so our role has fundamentally changed when it comes to the central isqua plan permits so um I I'm I'm just going to be kind of picky here for a second if if it's not on the land plan you'll see it at the level of review that we are currently reviewing permits you're absolutely right that the level of review that the commission was doing prior to Central isqua was significantly more even if this was I mean as you discovered with seventh and Gilman there is still a level of detail that is not we're we're not going to almost construction permits to um review a land use permit um so there um is a more conceptual I'm not sure if that's the right word a revie uh point at which the commission is a being asked to weigh in um you are correct that um those detailed elevations and community space plans um are not shown um and the um substitute maybe uh for that that we're proposing um is the existing camp um because the the point is to continue that that may not be sufficient to you I just want to be clear that that's why why that was brought for but just to clarify again this is I'm I'm just trying to understand I don't know if I have a point here I'm just trying to understand so if for this particular review this is the level of detail we're operating at to make the recommendation to the council who make the decision for other projects that are outside of the land plan that's being contemplated here or considered here over 100 50,000 Square ft the level of detail we will get though in those reviews will be at more granular level than what we're getting here is that I would expect it would be similar to seventh and Gilman okay because that was our exp that fair yeah seventh and seventh and Gilman was less detailed than we were previously getting but it was more detailed than yes okay yes so in this case we're saying okay staff you know we're weighing in with our you know um areas of emphasis Etc but it really is going to be a professional review that's going to we're going to have to rely on for implementation so we're have to have confidence that's happening yes and no and and this may not be again satisfying um I think that was um the importance that we placed on bringing it back to the commission and having an opportunity to hear public and commission perspective on um does this meet Central isqua is this consistent with the land plan does this meet those expectations you're right it is not a decision-making role um but it is not sta uh thank you professional staff um it's not just professional staff operating completely uh back of house uh we would be bringing it forward to get that input yeah no I I appreciate that I'm I'm good thanks that that helps me a lot and I guess the way I understand it too is what what we're saying is Well the the imagery that you providers the the current campus what they've built does that essentially become part of the the land plant itself then because I I understand the idea we've said Costco's built some really nice buildings that I think if they if we said those were what are these are going to look like I think they would sort of fit everybody's criteria and what you're going to be doing is saying are they going to build something of this quality fenestration all that and so would this be in essence part of the land plan absolutely that is part of the land plan and I think um you know that's I think part of the value that we see in bringing it back we may say okay that's a similar level of detail and quality of materials and detailing and the commission might say no we don't think it is for the following reasons and that's a that's a conversation that we want to have okay I guess I sort of feel comfortable enough that they built some really nice stuff so keep doing doing that you sure ask a lot of good questions Mike yeah which Dove tail into what I'm going to ask now we're approving this land plan with configuration concept blocks of buildings which I'm sure there's a lot of study that went into it based on the configuration of the building um when when the plants are put together for one building um why is it not coming back to the commission for review so if the building is 150,000 Square ft or more uh it will come back for commission input MH um it just would not be for a decision because you're making the decision now yeah but the decision is to approve or recommend approval of the land plan um and there's some a lot of talks about Trails time into the building the the sky Bridge you know everybody has their own concept of how it should be how it why it shouldn't be there and that kind of thing I have my my way of thinking how the trail ties into it you know we talked about little retail shops you know everybody has their own concept but um and so yeah there's that limit of 150,000 square feet then it comes back here but right now we're kind of asked to recommend concept based on those blocks and how's the block you know there's a lot of details that needs to go in before it becomes a viable uh uh Place uh enjoyable place so I guess you know I'm with 150 square feet how many stories are we talking about four uh yes probably yeah well actually Four would I think be 240 thou I think they're about a 60,000 foot floor plate more or less so I say four you know and to tie it with the trail you know I have my concept of how retail ties into the trail coffee shop lunchtime kind of sitting around that kind of and not Warehouse Costco retail so everybody has their own concept of how it should be so I guess um you know I I feel uncomfortable in a way or maybe I'm not understanding the you know we're approving land plan but yet there's still a lot of unworked details that's not worked out so if I can offer something so so there's there's there's some choices that you guys have and I just want to make sure you guys kind of know the ground rules as we're going through this so right now the development agreement has proposed language on how all this is going to work you guys at the end of the day could recommend no we don't like that particular piece want we want to be the decision maker on every permit in excess of 150,000 ft you guys have the ability to make that recommendation at the end of the day right now I've got DC review up on the parking lot part of you know if if if you guys are going to go down that path it's helpful for us to know what the issues are um I think there's been some conversations about it does move the bar you know as Mike mentioned earlier this is this is moving the bar a little bit and you know are you guys I think need to gauge are you giving up any of the responsibilities that you're tasked with in terms of reviewing you know site development permits in the city and and if so let's talk about that because I think Costco who has proposed this process and and you know staff I think believe that you guys get to see the pieces that that you should have input on in on but if there are pieces um Ray that that you don't feel comfortable with because this is too conceptual for you then then throw that out to us let us you know let us hear that so that we can talk about that and see if there's some things that we can offer that might help you get over that hump and feel that you know what I I get it if they want to build those buildings like that we've talked about the penetrations we we we know generally how tall they are we know where the parking is you know I've got pictures I've got imagery of existing Costco buildings I'm good or I'm not good and here's why I'm not good it's helpful for us to kind of have that level of of clarity if you can provide it and again at the end of the day if if this is just not something that you're comfortable with you know as we collect the recommendation out of you guys you know you don't have to support that you can say I I support all of this but I don't support that yeah yeah well and and one thing I would add is if m and Mel AR mud wrestle or arm wrestle and they we we come to a draw we can also send that forward you know that that there isn't a um consensus among the Commissioners and those are the kinds of topics that then we will carry forward that recommendation to land Ure and on to the council because these are the kinds of things you guys have more experience with the these kinds of issues adjustments interpretations Etc and that this is really what looking for from you is based on your experience where where things make sense and where things raise concerns and whether we can address those or not yeah and and that's great you know Keith you clarified that very well and so uh I guess the point that I was trying to make is that um yeah you're right it feels uncomfortable to approve blocks of buildings that just blocks and then just let it go and so I guess to to kind of ease the Comfort level here the fear Lucy can you go back to that slide with the buildings it's my understanding the land use that these are conceptual ideas of what the buildings will be like doesn't mean they're going to look like that I mean it doesn't mean they're going to be like a an eye and whatever that thing is in the corner and maybe the only one that's really probably fixed would be the curved one the other ones could vary what we're being asked to do is approve them they're going to be over 150,000 Square ft so it would come back to us to give our feelings about what the modulation is and the color scheme and the windows and the sky Bridges but we wouldn't have a decision we would just give that would just be input that would go where we could make say well we don't really like the way that building looks we think you should have more modulation what happens so um staff would um to be honest we get lots of comments from you some of which are related to the central isqua standards and some of which are other things that you want tell us that we're glad to hear the ones that are related to the central isqua standards which are the tools that we have to review by we're going to take pretty seriously so let's say you know it comes in as a completely round or or this building the these two buildings become one big monolith and it comes right up behind the street and there's no community space there we might come back to you and say we don't think this is consistent with the land plan we think that it should go back through as if it's a brand new building that wasn't part of the land plan um I I'm I'm not saying that's what we would I'm not sure exactly what those triggers are we would have to face that at the time and what that's part of the reason that we wrote the staff report and we provided that chart looking at each of the standards in Central isqua and evaluating which ones would be evaluated with future permits and which we think have been addressed now on the other hand that big monolith could come in and you could say yeah that's fine by us it's close enough and everybody on the staff here would say that's not what we thought we were dealing with yeah then what happens I think there's a I think there's a reality here that said you you're not indiscriminately making decisions on and I recognize that those are blocks but but those blocks are constrained by the Central isquad Development design standards I mean there's it's not cart blanch you can't you there's that's what the whole the value of the central isqua plan plan and the Cs were is to is to be able to set the parameters and they are more conceptual than being able to see all the on the ground stuff but that but there's a context and a framework that they have to comply with and we do have the responsibility to look at whatever is proposed and say that's not consistent with what the standards are and even go be so bold as to say you guys missed it there you're there's a a design standard here a parameter that that you're kind of letting go and we think you ought to reinforce that right and so really I I I there's going to be that conversation there is going to be um I think the question is do you feel that it's necessary to have and and this is I'm just stating this I'm there's no judgment associated with it do you feel that you need to have the decision-making authority to make it happen or do you feel that the ability to have that conversation is sufficient and and you know that that kind of is the question and by setting certain framework through the land plan is that sufficient to um guide that future conversation or not and you know that's we we're we've put something out there we're having a conversation about it and this is what we need to be hearing and it's on the parking [Laughter] lot go on a long time on this one so let's move on and and I think there's I mean you guys this has been a good conversation and I've got a ton of stuff in my head and we could spend the next hour talking about it but I need to talk about it with them and we'll do that tomorrow and part of all of this is getting back to you guys on what hopefully will be the Silver Bullet um so that's the goal so I'm handing it over to my fine colleague from New Orleans to talk about the mtfa let's just say who's that hi Shel I'm nicer than he I was noticing nobody was standing up nobody want to say I'm from New Orleans sorry voila just to remind folks thank you uh I'm Sheldon Lynn with the Department of Public Works engineering and a question came up about you know what are these projects that are incorporated into the master Transportation financing agreement and essentially there are three projects uh that are incorporated into it uh there's what uh I term as kind of the anchor project which is a new road uh connection between East Lake manage Parkway and Lake Drive uh essentially it's a reconstruction and realignment of Southeast 62nd Street here creating a new intersection with the undercrossing that came in this way a few years back 221st and an extension of Southeast 6 62nd Street all the way over to here uh this is a widening as well to accommodate the large volumes of traffic for turning movements and so forth uh in here as well as it's going to have multimodal facilities along the north side connecting into the East Lake samamish Trail um this section of Road uh from here to here is about 2,000 ft long I it's going going to be constructed uh primarily about half of it is a bridge structure to avoid the environmental constraints and so forth through here uh it will be a raised Bridge structure uh and then an intersection and then coming back in here with a 23 Lane uh facility uh because of the volumes of traffic and turning movements into the planned Costco building here the roadway section up here is going to have have uh bike Lanes three lanes of traffic and curb gutter sidewalk and Landscaping as well uh trying to fit something in where uh there's existing development and the like uh to do our best to meet the core Street standards uh you'll you'll note that I did not include bicycle Lanes on this road uh due to the high cost of the bridge structure and so forth we're going to enhance the the Pickering Trail through here uh right now it's only about 8 to 10 ft wide on this side of the creek and we're going to widen it to about 12 to 14 ft wide to allow for multimodal use and the bicycle facilities and pedestrians uh will be allowed you know will be connected into the TR Trail and they can use the trail to reach and make their way Westward or come Eastward and come over here to this intersection so uh oh another component of this is is that the current uh crossing of the East Lake samamish Trail is at grade with the existing roadway there's going to be a grade separated Crossing for the East Lake samamish Trail the road is going to go over the top of the trail uh so there won't be any pedestrian conflicts and the Regional Trail can move a lot smoother the the other uh larger the next largest project in the suite of improvements is East Lake samamish Parkway that one uh it's currently constrained in capacity heading southbound uh by only one lane of traffic going Southbound through here through the entire length of the project essentially the Project's going to add a bike lane add a lane of traffic southbound and curb gutter sidewalk and Landscaping on the west side of thex mamish Parkway as well as intersection improvements here to improve the operations of that intersection this project is completely designed and we're going to be starting the RightWay acquisition process here and in the next few months uh with anticipated construction next year the smallest of the three projects in the uh Suite of improvements is over here at 12th and sr900 and Northwest samamish Road uh and we have a large degree of congestion through this for Ingress and egress into the Pickering area as well as holiday and tul City Hall Northwest uh this project is going to include bike Lanes on both both sides of the 12th Avenue coming through here and it's going to add a left turn pocket coming this way turning towards I90 uh currently there's a single left turn pocket so there will be a double left turn pocket in the future to reduce the cues through there and allow improved operations for this signal the purple line right here on sr900 is actually going to be an added right turn lane only currently there's two lanes one of them is a through right we're going to create a dedicated right-and turn movement in there again to help the operations that signal and traffic to be able to move more freely through this Corridor as well as uh Ingress and egress into the Picker these projects together are roughly $50 million in cost estimated so that's kind of the the overview yeah what kind of time schedule are you looking at Sheldon time schedule on this I mentioned uh the East leage Parkway hopefully starting construction next year uh we expect all these projects to be finished by 2020 2020 thank you I've got a question and I I know Keith you may be able to answer it because it it dealt with the letter response to Mr Williamson I'm glad I came back then yeah I am too and and I looked for it and I I didn't I couldn't find it in the red blue yellow green cross out development but the last sentence on reserving Transportation certificate violates the law it felt about Costco's contribution of 20 24 mil thereabouts MH and then that should Costco elect to build less than 15 million square ft then they have over mitigated for traffic impacts and the draft development agreement contemplates their ability to be reimbursed for any overpayment can you explain that to me that means that Costco says they're going to give us 24 million if they build out fully to what the plan is if they build out half of of that then they're going to want 12 million back and where does that come from so I mean where it who makes up the difference so the concept right now is that you know because because of the timing if you look at exhibit H which is the mtfa the timing for Costco's payment goes concurrently with Public Works building those streets that's expected to happen in the next six years so as as Sheldon gets out there with his shovel and starts building these roads he's going to be invoicing Costco and they're going to be paying their $23.75 million to cover their fair share let's assume that 10 years from now Costco's buil half of their entitlement and they decide because of downturn people working out of their house we all becoming midgets I don't know that they don't need as much square footage and so they now have over mitigated because they've participated in building roads that are going to go unused by them and so the concept here is they should be able to monetize that investment in public infrastructure in some way now what this says is that they could potentially sell those trips to other developers that could then instead of paying that their traffic impact fees they could buy those trips from Costco and then it's basically like transferring a concurrency certificate from one developer to another and then they come to the city and say we own now 900 trips and instead of having to pay those to the city um to get our concurrency we can now build because we're taking advantage of what we bought from Costco that's it in a very loose and non-legal way TDR kind of like tdrs so it's not really a kickback of money it's not really a I mean so Costco would get paid for their investment in the public streets by a developer of some sorts and it could be the city now let's and and if and if there was no developers that wanted to buy those then then they just wait they just wait and that that's spelled out clearly there's no guarantee here that I that I read so they can't force you can't force they can't force the city to buy it back no that's not in here not in any color okay I said I saw the thing on trips and stuff like that but I didn't know if that was dealt with the money yes you know so I mean there's so the conversation we've had with Costco is they believe that they want to build continue to build expand their campus in isqua you know I mean I think what they were saying is what happens if we don't build 1.5 and and this was just a way for them to possibly recoup some of their investment there's no guarantee here okay thank you yeah I have a question um I guess May for Jerry it it keeps getting mentioned about the $23.7 million that they're putting up but when I look at the numbers it's the 237 is the first 48% and then the city kicks in two and a half and then Costco kicks in two and a half so when I add those up I get the 26.2 million and I keep wondering it sounds like to me like reading it that they're committing to 26 million not 23 I'm missing something the the other items are a contingency amount above what's estimated so if the project has justifiable reasons where we have you know the budget needed to be increased over the estimates that we have today the city has requested and Costco has partnered said yeah we'll help share in that risk up to 10% over what your current estimate is and so that's where you get the two and a half and the two and a half and the incentive is that you know they want the city to take the first two and a half because it's an incentive one for us to be a little bit more diligent hopefully to keep the project in line and cost uh and keep it on schedule and then the the other component is is the second two and a half Costco would bear that burden on their own and then if it really just goes out of sight the city takes the responsibilities over that okay great so that's a contingency factor it's a sharing in the risk of schedule materials cost labor costs things like that great perfect so it's not an optional item for them if it goes no that's non option those are non-optional things the scope of the projects are defined in the mtfa under the exhibit H2 I think it's called Uh and that's the scope of the project thank you and um I hope this isn't too off topic but since we have you there can I ask about uh future expectations of an O I90 overpass that would connect in Lake Drive oh that's way off topic no uh you're you're speaking of the 12th Avenue over Crossing and I give a big circle here uh that's shown in the central isall plan I that is still on the radar screen and I believe there's been comments both at land and Shore as well as infrastructure committee about with the expansion areas and things like that and if expansion occurred in this area by Costco the land plans and so forth as uh get developed for this area need to consider how The Landings and accommodating for the 12 Avenue of overcrossing and that's those are that's future land use planning that we need to be cognizant of as development proposes uh in this area okay next SL so um actually Sor that's okay um so that's that's my coverage of the eight topics with help from a friend phone a friend um Costco um before we move on to sort of other questions um Costco wanted to do a presentation uh Jackie is going to be doing this um you just use the keys to go up and down and if you can point using the mouse great thank you Lucy Mr chairman members of the commission Jackie Frank um vice president of real estate development for Costco Wholesale I wanted to um take a a slightly different approach but hit many of the same topics that Lucy Lucy covered this evening first of all I want to say that um this uh development agreement is very important to us and and we believe that it's important to the city um isqua is our home and uh from a corporate point of view and for many of us personally um I kind of want to take it from the top because it's it's kind of who who we are and and what we do and and how we how we uh how we run our business um first of all as you know our our job is to continually provide our members with quality goods and services at the at the lowest possible prices and the way we do this is number one to obey the law number two take care of our members three take care of our employees number four respect our suppliers and our partners um and if we and if we do all of these things correctly uh we believe ultimately at the end of the day we're going to reward our shareholders so how does this um how is this re relevant to our discussion this this evening well first of all let's obey the law we've demonstrated a consistent track record um to adhere to and to exceed the requirements of the of the MSP over time which at the time we were implementing the city's Vision um and going forward we're committed to implementing the central isqua plan and the uh Central isqua Development design standards and through that manifesting the city's vision for an urban um and a dense more dense and a vibrant environment what this does for us it allows Costco taking advantage of the CIP um to to do real infill development for higher densities consistent with the with the uh CIP and the SIDS as you know we've grown as a company um we've we've as I mentioned last time we've become the second largest retailer in the country the third largest in in the world and we're currently ranked number 19 in the Fortune 500 um as we grow locations and grow our ancillary businesses we need to add Central support to support the growth of our business it's very simple under the original MSP um back from 87 um as Lucy said back in 2002 we ran out of capacity we ran out of the ability to add a single square foot of development to our campus from a development point of view and as we continue to grow and evolve the only option available to us under the MSP was to lease nearby buildings so there was late Place one there was late place two there was the space Labs property and and now the Microsoft uh buildings building at the uh at the Vulcan development under the da The increased densities allow us to accommodate future business growth it allows us to consolidate our employees and most importantly it allows us the ability to realize synergies and efficiencies that are inherent in a purposefully designed campus now the history of the da is pretty simple in 2007 we became a member of the city's committee to consider re the resoning of the valley floor me members of that task force up to 2012 we participated in the city's visioning process and we and we provided um input to the to the development commission as well as the city council for the proposed uh development design standards and beginning in 2013 we worked very closely with staff um in applying the SIDS to our campus through a development agreement and that's why we're here tonight as far as some of our other codes of Ethics taking care of our employees and respecting our suppliers um as a as a high priority to us over the past 20 years we've demonstrated the ability to develop within your regulations to create a first class corporate campus now we're not a developer who Who develops and flips we're a long-term participant we're a long-term partner um and as I've said over the past 20 years we've kept all of our promises as evidenced by the continuity the consistency the commitment to Quality the commitment to land stewardship to Quality architecture to Landscaping to community amenities to traffic pedestrian circulation um all in the context of the natural environment the the habitat esar creek creek like samamish Etc at the same time this is a private development but it's it's a private development in the sense that programmatically it's meant to serve as a secure safe efficient International headquarters to thousands of employees and also our vendors and supplier community who frankly spend a lot of time here in the isqua community the MSP established the theme and the pattern of development beginning in 1987 the SIDS implementing the vision of the CIP allows for the next growth opportunity for higher density Community amenities circulation paths building on the context previously established both with the existing Street patterns and the surrounding natural environment this is not a scrape and rebuild scenario that would be wasteful and we're not about waste we're about efficiency this is truly an infill development opportunity in the context of marrying the existing conditions while implementing the city's vision and the more Urban Development standards and yet although a privately owned corporate campus there are no walls there are no Gates there are no fences there are no barriers per se many people use the amenities associated with the ISRO Creek Trail um the barn Environ enironment and the pond Trail it's fairly it's actually fairly heavily used by the public we've integrated this into the integrated into this context are The Pedestrian connections the employee plazas places to linger places to eat places to play and places to work our property is not a Civic facility or a public park yet it's an awesome place to work what i' what I'd like to do is show you a few things things and this goes to the point of trying to not only meet or exceed the previous development requirements but also to keep our promises over the years so when we look at uh at buildings we built and how we Define entrances we look at uh building three um with uh with entrances as well um we also look at how the buildings uh sit on the side s and uh and create community space or Plaza space for for our employees and our guests this happens to be um adjacent to the um to the pond um as well as um on the back side of building three adjacent to the to the pond area um an integrated Plaza that's you know heavily used for uh for dining for lingering for meetings um Etc and we even have places for uh for play um part of our uh this is just this past week and our employees at lunch are notorious for uh pickup basketball games now we also use the plazas for uh for U uh product mockups for for uh uh showa to Showcase uh uh items that were for sale but but uh but we also do uh uh have designed and integral uh recreational opportunities for our employees and their guests um within the context of the Pickering development of course is the community ampi Amphitheater which which does get used and is and is quite well integrated and you can see small gathering and small seating places that separate both the plaza area and the natural pond area um Lush Landscaping benches uh low-scale lighting you know a a real sensitivity to to scale and to detailing and to texture and and opportunities for people to you know at to stop somewhere as they're on their way somewhere else as far as pedestrian connections are concerned here's an image of the uh of the isqua trail um adjacent to isqua Creek um I think I think what you'll find is that we have not turned our back to anything um on the contrary U the Landscaping is Lush and Rich um and we as we as it was said earlier we've designed our buildings with four-sided architecture Ure with h with sensitive Plaza placements um to to to not only uh not turn our back to it but to actually integrate in such a way that there that you know we can we can coexist within the context of the natural environment um uh in a in an appropriate way without barriers without fences Without Walls another shot uh looking South um on the uh on the pond Trail and another view quite quite lovely and and frankly quite heavily used