are we good okay i would like to welcome everybody to our city council committee of the whole retreat meeting on saturday july 16th after 9 00 4 a.m um the goal of our retreat is really uh we heard from council members we want to talk about that we want to check budget priorities and get a sense of where we are as a council as we run into this new biennium budget process and so since we heard that from council members zach and i talked about well how can this be a good good process so we hearkened back to the strategic plan and all of that so i think you'll see a lot of things in this meeting going back to that idea of dot voting and things like that for all of us that actually did this little job voting um but the goal is really to get a sense of what our priorities are and we broke it up into capital priorities and operations priorities and so we asked you to come with three to ten capital and three to ten operations priorities we gave some examples of we don't want high level priorities like human services we want things like we need 24 7 behavioral health specialists so a little bit farther downwards when we're talking operations we're talking capital we said we don't want to just say we need more parks we want to say we want to fund pk whatever in the cip we also gave instructions to look through the all of our various plans because not all of them are included in the capital improvement plan or in the strategic plan so we gave links to things like the master mobility plan and the human services strategic plan so that we have a sense of what are all of these overarching things that we and our boards in the community have said that we're interested in doing more of or that we don't do very well in the case of the strategic plan and so for our um event today we're going to start out we'll start out next with public comment and then our cfo is going to give us an overview of the biennial budget we will follow that with a little bit of information just to refresh our memories on community survey and strategic plan performance dashboards and then we're really going to go into the meat of our conversation so we're going to have everyone share their lists of budget priorities and then we'll kind of see if we can discuss and group some of those because we figure there's going to be a lot of things that multiple people are going to bring up and so we want to make sure to list those out we'll have a lunch break and then we're going to have the items that we come up with that are individualized items on sheets written out that we can then go around with dots and give our priorities and then have a conversation about output the goal of that is you know on the one hand we could just give the list of hey here are the 40 things that council has come up with as priorities as ranked by votes but we can also take it another step forward and go okay we obviously know the counselor the administration is not going to be able to include all of those in the budget so do we as council want to shorten that list to be really precise on these are what our top three to five priorities are or do we want to give the fullest and so we'll have that discussion and then give the administration an opportunity to just do a preview of their budget priorities we've got a little section for qt reports we're not going to present them but if anybody has any questions or discussions and then finally public comment and so our goal is just to go through this being responsive to everybody's needs it's really about having conversations and so those are kind of my ideas zach i know you've had a few things you wanted to say this introduction yeah and you covered most of them that was a lovely walkthrough the only other thing that i'll add is just be mindful of kind of where we're headed in terms of a deliverable of this so it was really important to lindsey and i when we heard from each of you that you wanted to have a discussion about budget priorities that we think about there being a useful deliberate rule that comes out of it like you can see was talking about so if we do end up going with a more focused list and say these are our priorities and we have a document that now we can hold up as we go into budget development or that the mayor can use that she's coming up with her proposal that doesn't mean that those are our only priorities obviously this is over two years now instead of just a one-year budget so there will be a lot of important things that go on in the span of a biennium but these are the most important things that council wants to get accomplished over the next two years so just keep that in mind to you as we're going through that exercise that's the only other thing excellent excellent um okay so clerk can you let me know if there is anyone on the call there's no one in person for public comment is there anyone who has joined us on the call for public comment today uh yes council president uh ann fletcher i believe uh is on the line and would like to speak fantastic is there anyone else should i give the overview of star three and all of that that is the only member of the public fantastic we would love to hear from ann and you're unmuted you should be able to speak now hi can you hear me you can great good morning everybody council members and staff uh thanks for this opportunity um i am a resident of the uh city and i also am representing people for climate action and i sent in some written comment to you yesterday i just wanted to make a couple of major points from that to refresh everybody's memory my main thought here is this is a hard process to prioritize and looking at your values what you truly value really should result in how you spend the the resources and the time the expertise that we have and any additional that we need and so this is a great opportunity to prioritize that expert time and sufficient funds for the implementation of issaquah's climate action plan so my three points are to consider do we have uh the uh the right strongest organizational structure to implement a plan that is connecting multiple departments multiple administration groups and uh staff and especially in the areas where we're emitting uh the most carbon which is buildings and energy transportation and land use and then connecting that with our our one manager level sustainability staff member my second point is that i think it's really important to do a realistic assessment of the climate action plan which i'm happy to hear that the council has asked the administration to look at those plans uh the the plan has an implementation section that provides a near and mid one to three year timeline and there's some benchmarking that needs to be done but really looking at that plan and assessing it would be a driver for the budget and the third point is to make effective use of the the city funds uh to to prioritize looking at this this is a new plan and a new area that we haven't really delved into and how do we get that integrated in and and build in the the time the expertise and the money to truly to truly uh monitor um and evaluate how it's going as it goes along and make be able to make the changes to have the funds and the flexibility and to have a rationale behind all of those items so i just think that issaquah has been great you've been great all in your support of climate up up until now and i i thank you for that but we just can't rest on our past laurels the challenging part is coming now and it's really easy to get distracted and tied up with business as usual so i just ask that you keep that in the forefront of your mind to move boldly into this challenging future that we have with the expert time organization and resources to show that we really value addressing the climate crisis and we really plan to succeed and achieve these goals you and best wishes for a a really great retreat thanks so much thanks and we appreciate your comments um so seeing that there is still no one on the line clerk yep okay so we can move on to our next item which is the biennial budget overview from robert oh thank you yeah hello appreciate being with you this morning so what we're going to do is i know we have some questions on how the biennial budget process works compared to annual budget so we're going to go over some of those just a high level overview of this and then i'll answer some questions so again council ratified the biennial budget ordinance will take effect january 21st to 23rd and again the period that we'll cover would be fiscal year 23 fiscal year 24. the staff is preparing a two-year spending plan for all government operations and capital spending for approval by council for that two-year period and excitement the budget ordinance will appropriate all city funds for the biennial period of 2023-24 so again that appropriation will cover the entire two-year period but the operating and capital spending plans you're going to see will be presented for each year both 23 and 24 totaling the biennial appropriations again you're going to fund one number for two years but you're going to see each fiscal year separately in the spending plans next slide so here's just an example of a spending plan and again you know this is subject to change this is just high level overview two departments that don't exist within the city so it's just a hypothetical the public health department very large agency of hearts i'm sorry do you have a way to make what you're showing larger on the screen a larger fraction of this yeah chris can be very enlarging to maybe 120 or just close off the stuff at the top we need to see ourselves well should just be that hundred percent on top yeah i'm not able to so the final budget example here didn't have a 200 2022 base so i guess the biggest difference i can say between an annual budget and a vitamin budget is when you get to that second year you're still working on a 2020 base you're saying okay 2022 here's assumptions from each year going from that base because we don't have to we don't have to previous fiscal obviously for year number so if you see here we have this hypothetical 10 million dollars our huge public health department and the huge solar waste department so 10 million dollars and 22 and then you see 10 million 523 11 million and 24. you go down to the second chart there and you see the difference from the base so again you can see here's your 10 million dollar base in 22 for the public health department five percent increase the first year and just for hypothetical ten percent of the second year it could be zero to say two percent just depends on the spending time and next slide please again this is going to be very small for everybody so i do apologize i just took the city of mercer islands by you know budget ordinance and you can see what they do is they just appropriate by fund 2020 you know two years of revenues two years of expenditures that's just one number can you go back to the previous slide i have a question of it so in your example um would we then for public health sorry be approving 21 million 500 000 and for solid waste approving 53 million 750 absolutely yes that would so again the two-year number like you said both fiscal years would roll up into the appropriation but the for the actual thing that we would approve would have a solid number that represents the fiber you know the growth that you are hoping for right the growth wouldn't be any automatically thing done later that's that's my point no right there's going to be a review process i'll get to the next slide there is going to be one step to reopen the budget if possible sure yes yeah but the original budget ordinance is going to look like that next page for mercer island where that's one number for the general fund one number for all of our funds in the city for the two-year period and so the mid value review so this is the this is the period this is by statute there will be a mid binary review that will include an update of the revenue expenditure forecast for the duration of the biennium with comparison to the appropriate amounts in the 2324 any budget ordinance that occurs between august and december of 2023 by the rcw codes you can't actually do it before but this is a chance to reopen the budget re-examine the assumptions of the second year and make budget amendments as necessary this does not preclude or stop the council from doing budget amendments throughout the year when we get grants we get other modifications this is just the statutorily required process and even when the process is just a review it doesn't require an amendment if it's not necessary there's just this review process and again um as we developed a pattern hopefully like when i came to you in april we're still going to be doing um quarterly reports to council on budget status so um throughout the biennial budget you know it's not going to be two years till we come back to you it's not going to be even until the video review you're going to see the progress report each quarter on how the budget is doing what that means they're doing expenditures and tracking that next slide is so handling of unexpected appropriations so this is where it will be a little bit of a departure from previous practice so when we get to the end of 2023 you're still within that two-year appropriation so right now when we go from one fiscal year to another staff often comes back to council and asks for reauthorizations this is for capital projects to run spending other operating budgets to carry it over from one year to another from 23 to 24 that process will not be in place because again you have that two-year appropriation you're still working so again if you have it's obviously up to the executive to control how the spending is within the departments but in terms of going to council for reauthorizations as long as a fund is within that appropriation uh no budget amendment or carryover would happen so again if you're in that two-year appropriation you go for 23 to 24 in this remaining it would automatically carry over that appropriation balance from the first year the second year because again you're technically in one appropriation so let me ask you a question on that one of the things that we've been dealing with as a city is unspend unspent areas which mean that we end up with the unallocated fund balance undesignated fund balance that is higher than our 15 so if i'm interpreting this correctly that means that we wouldn't necessarily deal with that in the midterm but if if we end up with two years of underspending within several departments that could end up at the end of that with even larger portions of undesignated fund balance that just hasn't been spent during that period of time again assuming the underspin is still happening but again if this does not not not preclude counsel from coming back and asking for a question amendment so do we anticipate having that because this has been something that has happened year over year do we anticipate that being something that we planned to do during that mid-year and i see city administrator bob quits up there raising his hand so i'll turn over to him yes thank you council president wallace members of the council good morning sorry i'm in town but not with you there um as i think we've talked about the issue of underspend and the growth in the fund balance the administration is committed to continuing to spend the dollars uh that the council budgets and so if we do have underspend as we move forward i think certainly it's our plan uh as we would come in for a second year of a biennium but to address that so i think as robert has said certainly it doesn't have to happen but i think as a practical matter uh it will happen certainly in the near term um today really is the beginning of the budget process uh as i think you will hear a little bit today and as we go forward uh we're still a little uncertain uh about a lot of things when it comes to our budget and so we're going to continue to make our best estimates if there is underspend you know we're committed to continue to invest that back into the community thanks and just a side note as we prepare by budget guidance and we're working on the operating budget susie's really taking the lead for us and dale also is helping out with preparing the operating capital budgets for the city we're really trying to work with departments to say what are you spending what are you carrying over you know if you're not spending something you're here do some house cleaning so we're really working with them to make sure that the spending plan is again like we said there's two years so we want to make sure that that second year is uncertain so we're really trying to clean it up justify everything and present a spending plan obviously to the council that is realistic thanks and so the next slide so i just want to have a disclaimer on this slide i know we've been asked for questions on you know what the fiscal picture is looking like this is very preliminary we have until now until at the latest december to adopt the budget there's a lot of moving pieces and changes for the purpose of this we're just trying to show that with some of the assumptions that we have right now that the city is still not in a situation where we're in concern we're obviously monitoring everything but i just want to show that right now our revenues seem to be stable on the general fund side so when you're looking at this chart this is just the general fund this does not include capital this is not a good read else any of the other funding sources this is just general fund and so what we're looking right now is pretty much we're just trying to show you the trend line the revenues are still tracking lower expenditures and again that does resonate to having that ending fund balance but that the numbers in here are subject to change so i just want to make that very clear that this number could be a revolving target but right now as we build a budget we are putting certain assumptions on the expenditures about house of living increases health care increases everything for the two year period because when we look at the few years we have to make assumptions not just for one year but for two years and so what we're trying to do is track it on a five-year forecast of 2026 just to show what the trend lines are at this point but this again this is one point in time december even november even september could look completely different from this picture what we're just trying to show right now is what our capacity is at this moment in time subject to change yes so robert do you look back over the last pick a number 10 years what kind of variability do we see in our revenue projections i mean are we seeing wild swings are we seeing wild swings in some areas and fairly stable in others i mean just just but particularly as we go into a biennial budget and we're now a rolling dice on two years um it'd be nice to have a sense of okay can we count on uh 65.3 million dollars or is it going to be 43.8 you know i mean so just i think you have a question i wish i did susie has a magic wand we can try that but uh customer is a good question so it depends on the revenue source i think that's the best way to do it if you're looking at sales tax that's our number one source but it's the most volatile source so what we're trying to do is actually that's the one that we we budget just by nature the most conservatively on because it's so around when you look at auto sales auto sales are very cyclical very fickle they've been going up and down up and down based on the shortage based on loans based on everything else in the economy if you look at community planning development that's another one that we're really trying to look at we're looking at what the trends are building permits that look at king county king county building permits our way down we haven't seen a full trend of that here and we have different demographics different issues than some of the other cities in the area we have one of the last cities that has space to build space to grow for example in the urban growth area in king county that's going to impact some of our future growth say in a slowdown and also just with our commercial because we're a headquarters account we're both a bedroom community and a headquarters town we have a little bit unique demographic so we have a utility tax that's kind of our base size when you look at utility tax and you look at anything even the solid waste increases that happen water increases sewer increases and just the demand for services that's pretty much growing each year so that's probably our most stable revenue source so because it's such a large source for us that continues to grow so we at least have that foundation now with sales tax we have some volatile parts of sales tax but then we also have kind of that baseline of sales tax where we know people are going to a friend buyer we know people are going to go to target we're still a regional hub um so call me north bend at this point aren't building any competitive retail neither is spanish they don't have that type of capacity to do so so we're always going to be a retail hub and even if you look at the trends during covid where you didn't see the volatility was with construction sector that's probably the one sector we're looking at that we have concerned about and it's not just our reach it's also our any sales tax reconstruction projects within the city also the lumberjacks when you look at home depot and people here has a large regional lumber yard so say they're they stop delivering to north bend the state north bend slows down that's going to impact us here so those are the things you're looking at right now with sales tax a lot of people ask is inflation going to increase sales tax that's the other question out there i know and the answer is yes or no yes you might see a small bump and actually heard some of the national statistics on retail yesterday saying that there was like a one percent increase in retail that was probably just driven by inflation but where does inflation start to cut into people's consumer spending happens and you look at okay they might spend more fred meyer but they're going to spend less of marshalls spend less at a high-end boutique and maybe less than among the pops here so there's there's those issues going on but the other thing that's also volatile that's that's difficult to forecast but we have a pretty solid you know trend over the past few years as our b o tax or business operations tax when you look at the grocery seats and you look at the expansion of costco you look at rei coming in look at some of the other large corporations that have a presence in the city that's been growing that's been growing pretty strong so this city you know barring a mass exodus from washington state that probably won't happen we're pretty we're in pretty good shape and weather recession with the caveat that we could see slow downs in construction and that is the sector construction does account for a lot of our sales tax now reed is a different story rita is more volatile that is not an astonishing is budgeted separately and appropriated separately for capital projects that is something we're going to come back to in later weeks as you get a better handle of it because it's pretty erratic because the good news is commercial's been very strong there's been some large commercial acquisitions in the community but there's also been a slow down to residential what does that look like in two three years that's a little more volatile so what i think would be really interesting as we go into the budget um is not to do a prospective but to do a retrospective on revenue so give us a look back and say over the last 15 years here's what we projected here's what came in because then we'll see how good our projections have been historically and that'll give me at least some confidence that we might have some sense of going forward and what's interesting and we absolutely can do that and provide that what's interesting about that is there's there's certain trends in there we would have to pull out for example the city still grew the revenue sources in 2008 and nine because the highlands is growing like crates and dallas is going like crazy the permits are already pulled so everybody else is going down isabella's going up so there's there's some of those items in there sure we'll have footnotes right can't get account without footnotes so we've been looking and actually when we've been forecasting looking a lot at 18 to 19. so we certainly can share that information um going into our august update take a macbook history of each reference source so what i'm hearing is there's a definite interest in getting to know some of our past trends and some of our future assumptions on revenue and expenditures and all of that and i'm happy to take other questions but this meeting is really about creating our priorities and this is just a teeny teeny tiny part of it because we're not coaching our priorities in what the actualities are yet we're setting a sense of here's here's what we want to accomplish we'll give that to the administration see if they can find ways to do that and if not we come back to the budget and you know figure out what what we might need to make adjustments so uh councilmember oh i thought i'd seen yours when uh arrested go ahead uh so this may or may not be a question on a five-year time horizon uh you said something interesting which is we're one of the only communities that has a sizable uh on a development space left do we know when we're projected to sort of run out of space because that's going to fundamentally change our financial model do we know when that occurs well this is andrea snyder um i i think we we look at when we do with the budget we look at um what is the development interest who's the serious development interest over the next couple of years and i think we have um a decently accurate picture of that just based on how long that development process takes and so uh we have been as you know inventorying our build buildable lands i think we are making the shift we're about to make this shift from having any greenfield development to redevelopment and we are seeing some interesting redevelopment but that is going to occur at a much slower rate and so i you know i would say that transition starting to occur right now and will really occur after the next biennium um to looking at more of a redevelopment mix so it is within the next five years but not within this biennium but it's going to mean that our ability to project based on past performance is going to go down right the uncertainty levels are going to go up because we don't really know what that model is going to look like the way we've known what it's looked like for the last 20 years i think that's true we still have areas that have not been built right there's the swedish development agreement there's plenty of uh larger parcels in the escala highlands so we're going to be seeing a mix like i said we're going to be in this transition area where we're going to have some greenfield development that we can see and predict and then we're going to be having more and more redevelopments of our central supply area um so i would say that next five years is still going to be a mix with one maybe two redevelopment projects still greenfield and then moving more into the redevelopment all right thank you thank you um so you explained a little bit about how to think about inflation on the revenue side as far as how it might impact um behavior of different sectors but i'm wondering if you could and maybe this is a conversation for later which is fine but at some point i think it'd be helpful to understand how to think about inflation because that's such a big issue right now in terms of both revenues and expenditures and how to factor in the fact that we're seeing very very high so at this point again because the numbers are changing monthly at this point we did we did build in some of that going into 23 we built in higher cost of living increases and here we go higher inflationary increases than we did in the out years and so again these numbers are subject to change what is the long-term trend of inflation most economists are still saying at some point in a level off but then again that level off means potentially recession if interest rates keep going up so that's why we've been susie and i've been talking a lot about what is a recession look like on these numbers so again the biggest impact would be sales tax more than anything i could discuss in the construction sectors specifically and maybe some of the available revenues from the businesses so so that that would be obviously with a prolonged recession that line would drop down towards that expenditure line and so that gets into more concerns even if inflation did drop although even in 2008 2009 2010 we still may take a robust absolutely but we had legos so and there's still construction going on there so that's the same thing we have construction we know we have two-year construction that is already on the horizon that's already happening the next two years after that of course the pictures will answer and then one related question on the ending fund balance if there's inflation over the two-year budget that is record high how do you think about the ending fund balance because you're you have a different i guess value of that um fun at the start and at the end due to the inflation that occurs every day yeah so again it's throwing a dart you know especially when you get to the second year but we did build in again we did build an inflation for both years of this forecast and we did go higher than we normally do so it is a higher number than we would normally factor in for 23 and for 24 as well so we're using higher assumptions than we would even going in the out years we're using four percent and traditionally use about two percent so so we have done higher but like you said it could end up being higher but that's when we come back and we review this forecast every quarter to make sure that we're going to hit those assumptions and like council know if the trends are changing but this is a generally held economic view that inflation washes out because it hits both sides of the ledger the same way it's only if you get differential inflation right where some sectors are more than other sectors that you have to worry about yeah and it's in this community too like on sales tax one of the trends that i'm looking at is how does inflation be you know impact people's behavior and spending habits and one of the downsides for the city is the fact that people have to shift from taxable to non-taxable spending so example non-perishable food items are not taxable we don't receive any tax from going to fred meyer and buying a piece of state but that piece of steak was 9.99 last year it's 20.99 this year people might buy that instead of going to marshalls and buying a lamp so that's going to impact us but same thing gas prices we don't receive any sales tax on gas so people are spending more on gas they might spend less than 70 minutes but the reason i say on both sides of the ledger is i'll tell you i'm having to spend a lot more for engineers this year than i had to last year absolutely they're making everybody in this town is making more money than they made a year ago if they're in professional fields right so they're going to spend more on those stakes because they can because they're making more money so it washes out as long as there is a recession yeah and that's actually exactly what we're looking internally at the expenditures that's what we're working with departments is looking at our contracts assuming that there's cost escalators going up and even the pass-throughs from other governments we're already seeing pastors from other governments that are obviously higher than they were in the previous year so yes that expenditure curve and we tried to estimate the base in here but again we're just showing that yeah some of that gap obviously that you see here will be taken by increased surface level adjustments council president walsh go for it um in the interest of time i think we've come to the end of the presentation the last slide is just a calendar that i think you're all pretty familiar with we'll be back to the council next month uh for more of a discussion but uh perhaps now is just a good time if there's any final questions otherwise we appreciate the council's uh comments and questions on the the larger issues of the two-year budget chris the clerk would request that when somebody has the floor they should speak a little bit more loudly we're having some uh virtual attendees saying that they can't hear quite so well great um is there any redistribution that we might need to do with the owls toward this end no okay just checking in seeing what our options are okay so i think the next item is the community survey and strategic plan performance dashboard and so dale did you have anything you yeah okay a little frame for our time exactly have any slides but um would it be helpful chris if i come closer um as you know from when i shared the final draft of our dashboard in late april the city has since launched a public-facing interactive performance measurement dashboard aligned to our strategic plan uh very exciting and a goal that we've had for a number that predates my time here at the city uh the dashboard went live on june 1st it was promoted in the mayor's newsletter in early june um and as it sits right now on our website it presents current as of year-end 2021 data for 52 of the 54 performance measures aligned to our strategic plan um it also communicates for each year for which we have data whether the city is meeting exceeding failing to exceed or has yet to determine a target for each of those measures um and that sits on the sort of menu landing page for each of the strategic goal areas since the early june public promotion i've had the opportunity to engage with just about 25 members of the public who either through reaching out to the email address on that on that webpage or via the survey below have engaged around our dashboard which is super exciting um and i just jotted down some trends in the feedback so one folks are loving the professionalism and navigability those were two words used uh i certainly didn't write navigability that was like get some good additions on there of the dashboard um i desire to see some of the some cuts of the data by demographics whether it be race ethnicity age gender neighborhood within the city or home language so a chance to sort of combine our census data with some of the some of the different measures we have specifically um a few on homeownership and being a renter or a homeowner there's been a lot of like who owns homes um questions that have come in um also questions about how the measures connect to one another and indicate if the community is making progress towards the strategic plan vision so like a love of the data and then like a but how does this how do we know if this is this good or not um and then making it more clear which and when indicators are being met or missed so not just letting us know the number but specifically being able to very quickly look and say like oh that one's been missed this year um this is the 1.0 version of the dashboard uh i'll be soliciting additional feedback in late 22 early 23. i mean i'm still listening feedback all the time but specifically to get ready to watch the 2.0 version in the coming year and then just i guess some quick reminders about how to navigate uh from that one main landing page clicking on any of the goal areas in the wheel will bring you to the landing page for that goal area from there you can click on any measure and it will bring you to the page with data and visuals related to that measure or the promise of data and visuals when we have the data for the two that we don't um and then you can use the navigation features in the top right of the page to either return back uh to the previous page you were on or navigate all the way home to that landing page but if you're old school and you just like to click through like a slide deck you also have the functionality to do that and a lot of people actually share that that's the way they move through it and they've appreciated that all the landing pages for the goal areas are front loaded so they can very quickly see the measures for each area at the top um and i think that's it i'm here to answer any questions you might have as you're clicking through uh that have to do with the functionality of the dashboard um yeah grateful to be here hello so i mean this is exactly i mean i had i have spent 12 of the last 13 years um talking about metrics this is exactly what i wanted um and so my question now is what do we do with this right and how do we uh use this down the road there's an amazing amount of super super strategic data here and and what do we and what does the administration do with this and how do we use it to inform decision making going forward i don't know if we have the answer to that but i think it gives a sense of a desire for conversations on that so yeah um and then we also had a presentation yes uh city administrator roberts yes thank you um today is a discussion of resources i think resources are an issue for the administration on performance measurement and business process improvement because i think as councilmember marx has rightfully indicated now that we have but what do we do with all this data and so i think that is a an issue that the administration is just thinking about what additional resources do we need to put forward on the business process reinvention side of basically we have a 1.0 person in dale um working on this and so she has some resources but to deal with the business process re-engineering uh but if this is something the council feels strongly about it would be useful to get some feedback today uh because we are as we're looking at the at the budget process uh how much more resources should we put into this uh the other thing i would mention is uh our work with the what work cities initiative through bloomberg philanthropies that takes up dale what probably 10 or 15 percent of your time working with other jurisdictions on this we're starting to have other staff and other departments work on some of these projects so council president members of the council as you're discussing resources and priorities you might want to keep this one in the mix because i think from the administration side we're grappling with how much more resources should we be putting toward the area performance measurement and business process for engineering versus other competing priorities great so i totally understand that and understand needing to maybe bring in some expertise to to think about how to uh redo some processes i mean i'm hesitant to tell the executive branch how they should run their own place but you know in my organization i have my directors um that i ask them for metrics of performance and i evaluate their performance based on their metrics right so this seems like something that a an element of this could be that some of these metrics are owned by your directors and and they use that as they come to us and talk to them about the health of their but again that's you know just an idea i agree with that i think one of the challenges we're facing and i think other communities face is there's a bridge needed that how can what's the resource to take these uh pieces of data and work with the operating departments and get them to understand uh what the processes then are necessary to move some of these numbers and so uh it's really two different kinds of resources it's that central administration additional resource to work with the department and then what a programmatic resources the department might need so there is no right or wrong answer but but i think there are two different buckets of resources one's bucket from departments and then one bucket uh again to help the departments understand the data that's being generated great yeah real quick wally can you clarify what you meant by business process when you're going referring to performance measure business process support um you know every every performance measure has an outcome and so those outcomes uh happen through a way we do business you know we could take any one of them um and so it's if for example your your planning permits for current planning aren't being processed um in a timely manner or through whatever your benchmark is then you have to go back and see why are there not enough people is it a systems issue is it a policy issue and so you try to break all that down and again there are different skill sets required in that you need the the actual folks who work on delivering the service involved you need sometimes a third party and again dale's been doing an excellent job of being that third party in some instances working with those those departments to understand what what are they doing why why are they handling a piece of paper the proverbial handling of the piece of paper too many times um you know so that's that's the pieces we're trying to go down to and the reality is is dale uh still works on the operating budget so it's really um you know what robert half the three-quarters of dale's time is devoted to performance measurement and another half for a quarter of her time is still devoted the operating budget so if we were to expand that and bring on additional resources is that something that would meet the council's needs moving forward so that's just something the administration is grappling with and again it's all about prioritization great okay um clark i think we also had a presentation on the um community survey so i just want to go through that really quick i'm not going to go through all 12 of the slides but could you bring that up great so again on the community survey you know as we are coaching our priorities in what are our needs what did we find in our strategic plan um what do we have in all of our various other plans in our capital improvement plan one of the other elements there is the community survey and i know all of us really thought that this last survey was very consequential it was great to be able to see the important satisfaction analysis and all of that so whenever you are ready to pull that up i think i'm just going to go through the first few slides so and next slide so yes so first thing i noticed on this slide uh because this is uh when we get to priorities you're going to hear this is there's nothing on there about housing and i realized i i believe this was based on our strategic plan right these priorities were taken from our strategic plan hi autumn monaghan administrative services director when we created the and formulated the survey we organized the questions by bull area so that that's how it was in my history that's what i was thinking i think at the time we did that because i participated in the strategic plan housing wasn't i mean it's emerged as a really big topic since the we did the strategic semester so i just want to point that out now in this summary on page 18 affordable housing is listed as number four on the summary so so it did get measured somehow but i just want to point out that on this particular slide people weren't asked about housing as a priority okay so just like that uh well i just wanted to from my perspective i think the land use planning and zoning that's a factor that impacts what kind of housing we get oh definitely that's the second one yes i see that but you know when you're asking people i don't know that everybody would connect land use with exactly with housing i agree with you but again you just need to call things out sometimes though yeah so like if it didn't have public safety you'd say well that's probably something if you didn't have healthy safety and nobody you know you'd be like oh nobody cares we'll probably see right no yeah yeah so just want to point that out on that particular slide yeah so this is really just which uh services the residents think should receive emphasis over the next two years we can clearly see that there are two or three at the top that are very consequential the flow of traffic and congestion management on esco streets land use planning and zoning and then maintenance of city street sidewalk and infrastructure as we go on to the next slide we can kind of see the percentage of satisfaction versus importance and so the flow of traffic and congestion management was highly important much lower satisfaction so we've all seen this before i don't want to dig into what each of those elements are but i just wanted to make sure we're using that as a place to kind of talk things through can you go to the next slide this is our very famous uh quarter situation where we can see again the areas where lower satisfaction higher importance and then also the continued emphasis where there might be a little bit of satisfaction there but um still very much important and so i don't think we need to go into the rest of this because it's just breaking down the areas but if you want to go to slide 12 that's the summary so the piece that we don't want to miss is that satisfaction in isabel is much higher than other communities so we still have that as a baseline and we've got a lot of positive perception um but there are areas that are emphasized as top areas for improvement and so those are many of the things that we already know but we now have data for and see our continued emphasis so in order to keep on with our schedule and i am keeping us on schedule um we have at this point a break if needed before going into budget priority setting um how are we feeling great no break yes love you people okay fantastic so our next part is really about giving yeah enough intro yes exactly jump up as needed do all of that um so this part is really about taking that bit of homework and saying let's throw it all out on the table let's see what matches up between things and then um we'll have a chance to discuss those items and kind of group them together so i'm wondering i'm happy to go up to the whiteboard and write things down as people call them out or if anybody else wants to do that happy to look around sure that's great my hands are quiet yeah so many hands okay so what i'm going to do to start out here is just see if anybody wants to start with their list and zach if you'll have like half of it for capital and half of it for operations that will allow us to kind of segment some of those ideas so does anybody want to go first okay we've got victoria and then chris you want uh you both together yeah go ahead and give one column and then the other so that zack knows where to write it and zach just right along and if we have somebody else who mentions the same thing we can just put an extra check mark or something like that can i do it breathe go for it okay so um i was reviewing the past budgets and i think that the 2020 budget where we were planning for 2021 but still in figuring out how much covid was going to impact the economy and going to impact our community i think that we find ourselves in a similar situation in some ways now because we have a lot of uncertainty about um how long the effects of food will last and the economic downturn how that will last and how that will impact especially um disadvantaged communities in in issaquah and so i think that with that framing i looked especially at 2020 given the uncertainties we have now and in that year we had a couple of themes including the social safety net public safety and investing in parts and open space and i think that those were focal areas that served us well in that creative uncertainty so building on that for this budget um i wanted to look at how we could expand on progress made in those areas and continue to support our community and uh become this welcoming community that we want to be so i thought of a rebranding of these as community resiliency which would expand to disasters and climate resiliency and protection against an economic downturn and then quality of life so this would extend the parks and open space but i think could also expand to our trails and mobility so with that i think of the green necklace as one idea that i really want to work on and so there's a number of priorities that get to that in my capital improvement list the green necklace is something that's um been a priority for a long time as councilmember marks talked about this is a long time coming this is not my idea this is something that counsels before us has put forward and i think our council has a real opportunity to make that happen i think it also um speaks to a number of our a number of things that we want to do in the near terms to set bitcoin art in terms of quality of life for our residents and it speaks to the communities needed to do better planning for growth and um and land use and becoming this welcoming community that we still want to be and um additionally we had this conversation recently about our park system and all of the benefits they have mental health um you know social well-being place to gather as well as physical well-being and getting people out of their cars and all the things that we want to be as a community um and so i think uh i think that to use an analogy that i really like that council member michelle started i think that investing in the green necklace is like creating a college fund that better enables all of the beautiful children of all of our art systems to thrive and um i would love to make this council uh have that become real so with that my first capital priorities are the ones in the green necklace so that's pre-corridor pko45 valley trail and creekside pk12 which currently starts in 2026. so move that enough tibbetts creek trail uh tl 009 um and one additional note there the pk45 pre-corridor had a conversation with director watling he indicated that the costs on that are likely to be higher than estimated um the first one is crete corridor yeah and 12 was which one which probably that's um valley trail and creekside thank you and then sorry rainier trail is 21. i don't think i said it okay is that tl zero two one um trailer tk 21. so those are the four in our cip that are specifically referencing the green necklace which is why they're in my top ones and then i have a couple other things uh and these are just because mainly because they're long-standing machines um squat mountain uphill bike lane sidewalk it's not on the cip it doesn't have a number it's in that um it's in the i think it may be added now it's in the mmp and it's in the walk-in world hillside park pk 31. and then pavement management and the annual concrete management that's tr30 and tr-54 fantastic so that's your capital list do you want to go over operations list do everybody's capital okay sounds good then we're off to chris all right i'm gonna pick some easy ones i have a little more of a transportation focus and some of this we've already talked about but tr003 which is the i-90 crossing between 10th and 12th um i think we need to fully fund that work uh tr am which is the uh northwestern road non-motorized improvement project or pinch point um and then tr 33 which is the southeast black nugget road retaining wall repair i think we've been kicking that cam for a long time and then when i first ran for council i was listed one vote well doorbelling because i said you know we're gonna have a damn dog park so can we get the dog park done pk 018 dog park we have a mobile dog park and then finally is pk32 hillside acquisition 32 32 32. yeah and we will be taking pictures of this and posting it i assume with the minutes and all of that yeah great that's all i got fantastic uh so uh most of mine were also green green that being necklace related so pk12 and pk45 um to that i would add st009 squawk valley park south creek restoration uh st009 uh sierra tango zero zero nine squat kelly park um which i consider part of the necklace uh i didn't include hillside although i would certainly of course plus won it um but i i just consider hillside pinch point to hopefully be um you know on the menu already and we don't have to well hopefully we won't have to argue to keep them uh in the near term but certainly important so that's me for careful so did you you plus one yeah you plus one thing for oh wait hillside acquisition is that what you said no that's what i said oh no there's a hillside park halfway up there's that there pk32 this one position is the first position for hillside park no it's no just okay uh so what is that is that the little piece of property that no it's a bucket of ongoing monies to acquire hillsides sort of like creek corridor purchases right ah i see so you wanted to plus this one yes i'm part of the side park specifically thank you so i have a very short list but tr028 uh northwest america motorized project is definitely the top of my list i think it's been you know let's finish this long promised project for that particular neighborhood and then i don't have a crd number for this but the tod project has just got to be up there somewhere let's be sure we have the funds allocated for that for the for the next two-year budget okay so is tmv a capital or an operating cost uh that would be more operating at three points okay all right so running around the uh circle okay good job oh and then plus one to the green next okay well should i should i add little strikes for you dude would that were those on your list barb or would you rather that just be because we'll also get to the point where we will we'll be able to vote yeah yeah yeah that'll be fine okay victoria did you have it do you have a question for you oh no i was just gonna say i think that um there's some options for the operating budget for the gop yeah but it's not unscathed yeah [Music] yeah i just want to welcome we have a couple members of the public here so i'm going to tell the acronym bureaucracy that we are that we um use plain english so that they can follow us and max over there with the soccer shirt on is on the island youth advisory board and so we want to make sure that we are speaking in a manner that is understandable to all yes so thank you we love that we love that okay so russell do you want to go next do you want me to i'm going to do an experience great go ahead um you can mostly just put red marks up there for mine squawk mountain sidewalk project it's high on my list i want kids to get to school safely i also would put a plus one beside the northwest smamish road project to promote intermodal transportation and then also with that in mind the uh the rainier project that we have up there for rainier trail i think that our conversation on scooters really emphasized the need for us to think about how we create other ways for people to get around the city without getting into their cars anything that we can do on the capital side to make that happen in a meaningful way i think is is a focus in the staff for the next couple of years that's it thank you okay i'm going to go next then so you can put a plus one next to the pavement management and concrete management line item also a plus one next to the non-motorized a plus one next to black nugget road retaining wall and then i've got new stuff um tr004 so that's a transportation project that's 12th avenue northwest and sr 900 or 17th avenue northwest this is an intersection that i think we need to just move ahead on and i understand there are a lot of groups involved wash state park etc but i'm very eager to get that project moving i've got fc 027 so this is a facilities project the new fire station 71. we've been talking about this one and um i think it is high time for us to focus on moving that fire station i think that enables us not only to provide better service but it also gives us an opportunity to really take some time and rethink the facilities that we have down and the space that we have down near veterans memorial park with the um council chambers and municipal court the fire station there i think we have a great opportunity to think through that in the future but the first step needs to be moving that fire station um i've got one from the mmp the master mobility plan which is on their map they've got a number system so it's 97 which is the tier one sidewalk gaps and so i think that might actually cover the squawk mountain sidewalk ideas but in the mmp they really highlighted tier one two and three areas where we have sidewalk gaps where we could close those gaps and so i wanted to go with kind of their assessment of where the most important things were and just really quickly for the members of the public that mmp is our mobility master plan which describes our transportation policies [Laughter] um i've got one that isn't in any of our capital improvement plans which is street lighting so when i was looking over the community survey one of the things that people were dissatisfied with was our street lighting and we've got several neighborhoods one of which is south cove that just doesn't have any lighting and so that can be called out for mobility that can be called out for quality of life that can be helped out for public safety and that's something that i think we need to consider first of all adding to our capital improvement plan but second of all prioritizing because it's something that needed to be called out um and then tola do you want to comment on that or yeah um i just wonder is uh is the assumption that more streetlights is good in all neighborhoods i don't know if the assumption is it's needed everywhere but people were i guess you could say are people dissatisfied because there's too much i i guess i'm asking because i suspect that there may be some neighborhood specificity to this i think i think swap mountain has a long heritage of minimal um overhead lighting as well as being a mountain side yeah and um would not want more necessarily it wouldn't wouldn't necessarily work yeah i i absolutely agree with you as a concept there and perhaps something we need to explore further but i think in the very least we can say that south cove is interested in more street lighting um and so there may be other neighborhoods as well uh victoria um i believe that in the title 18 which is our municipal land use code conversation um that light pollution is also raised as another issue that we want to address and so just a consideration on the street land there's also light pollution the impacts that that has on wildlife and on our environment as well so something else to think about in the street lighting is in addition to the neighborhood considerations yeah yep um and then i've got two from the icap so ob which i i think that was just overview and the icap is the isoqua climate action plan um ov 2.5 which is solar on the community center roof and then ov 2.6 which is electrify our municipal fleet vehicles and so i call those out both as things that we can get done toward our climate action plan but also honestly things that will save us money in the long term both of those things are things that will lower our operating costs because we'll either have solar coming through to offset our power use or electric vehicles which will offset our gas use and so i think those serve many different purposes toward that idea and i'm at 10 but i had three more so i'll just save those as lower priority items yeah is the fleet uh is that is that a capital expense complete catalog sentence [Music] yep yeah it will have an effect on our operating budget but it is a capital expense anything that is fleet facilities all of that um russell and just to clarify my fleet here meeting our city fleet and then through our garbage contract we're going to work with our contractor on there therefore vehicles in the city right okay yeah and i don't i assume there are certain fleet vehicles that there are valid electric options for and certain others like maybe our snowplows where there aren't but this idea is just let's budget toward that idea um yeah that's the okay does the fleet study get into sorry this is super off topic get into detail about um whether specific vehicle types have innovated enough to be practical for use of long-term it should yes okay yeah great now it's up to you to add your list that's up to me okay um all right um so my top priority in terms of capital budget priorities was uh tr 28 and northwest manage road project i'm really happy to see so many other people agree with that um the tip that we just described the transportation improvement um program describes seven hundred thousand dollars in rework or great dollars um for that but then also another for 2023 but then also another 5.5 million dollars in construction work for 2024 that i'm just not necessarily convinced we have general fund capacity to do yet i think that's going to be tied into community conversation about a potential transportation ballot too so in the very least my ask here is that um that we match the 2023 funding described in the transportation improvement um program which is 700 000 for design and engineering work so i checked that one um tr-003 which is the centralized multimodal i-90 crossing with someone i thought yeah that's another big one for me um and uh it was eight hundred thousand dollars of arpa and planning work for 2023 that was in uh the tip but then most recently uh with with the community investment strategy that's been updated to a million so my ask is that we go with the community investment strategy um and then a couple other things pk 12 which is uh valley trail and creekside sensitive land acquisitions which i agree with uh pk 18 the dog park i completely agree um that we need to um be prioritizing the funding that's described in the cip for that uh pk32 which is hillside acquisitions i agree with that and then uh pk 45 creek corridor i agree with vicki on that being an important priority and component of our green necklace over the next two years a couple other things i wanted to add there has been a lot of community satisfaction with recent funding within our pavement management program our annual concrete maintenance program so i will press one to that but then also add water 15 which is our water main replacement program which i think there's also been a lot of satisfaction in that so my ask for those three things is that we continue to fund it at the better level that's currently envisioned in our cip um and then i will add i'm not sure it's not very actionable yet but just for the sake of discussion for the sake of feedback for the administration i want to add consolidated city hall to this list um i know it's not a capital project that we can invest in right now but i want to make sure that we're thinking about what that can be and how many different goal areas we could check off the box with a facility like that and where that could go and just start thinking about that in the next couple years exact toward that idea do you envision um any operations costs related toward the idea of creating a consolidated city hall or because i think you're right we probably don't have the ability to it might be better in operations in terms of thinking do we have the staff or consultant capacity that we begin this work and to start thinking about it so yeah right yeah to the other side real quick since facilities yes so we just recently issued our feed for project management services to help us in a few key areas uh starting this year in fact uh first around just assessing what space we do need and then um my goal is that we have some options for council to consider next year as far as are we are we consolidating a city hall are we purchasing are we leasing what are the options with some rough order of magnitude and cost um so that we really can start formulating a plan for what's next that's great so so i know that's coming before uh services safety parks uh just a couple days but i just i i really want to see us get going on this i've seen this topic start at least i'm gonna say four possibly five times in the last 12 years so let's actually like have this plane take off the runway because i don't want to see it go down the runway for a while and then slow down and stop it yeah thank you for that councilmember martz um i think one of the things that is going to make it happen this time is that we had a pandemic we had a complete upheaval in how we work and we are now really starting to understand what the future of work looks like so we are tracking other businesses who are trying to figure out what their space is going to look like i feel like we're in a really strong place and i think autumn's groundwork that she's doing right now we're bringing you something we are bringing you something that's for sure uh sydney administrator buff quits just to amplify everything that's been said city hall northwest is closed far as you know are moving forward to a consolidated city hall uh we have largely been consolidated uh since we closed city hall northwest in march of 2020. so we don't we've not talked about it a lot and again uh the item on service and safety parks coming up is really the first opportunity uh but we have made a pretty big strides already uh to do that in the midst of everything we've gone through okay and just added a conversation on the future of consolidated city hall with other services with respect to the courts i know they're always looking to add other cities i'd also throw out that after the most recent supreme court decision on indian sovereignty that we also reach out potentially to the snokwami tribe to see if they would like to join as well since north bend and slovenia are already part of our consolidated court system if we can provide a stable court system with competent representation on all the different sides whether it's the defense or the prosecution side and the judge it helps when the state is looking at whether or not they intervene on these cases or whether or not the tribe is able to stand on its own and do the things it needs to do for its sovereignty so if we can help in that effort and still get more services provided in the consolidated court i think it's a win-win on both sides so i just asked the administration to take a look at that as a potential customer as well i i want to enthusiastically plus one that is and because we're in a retreat give me 30 seconds to talk about um so we may have other opportunities to partner with local tribes but i've been thinking recently about the lands acknowledgement that we often do at meetings and there's a court case on an educator in seattle who's gotten in trouble because they want to use a different land statement but we need to do more than have land statements right and if we as a municipality have an opportunity um to assist uh local uh tribal organizations i think it would really benefit us and put some meat on those on the sentiment that we still often share about the challenge plus one there so i'm gonna plus one thank you council member marks i have an ongoing uh juliana's not here to remind me how often but it's a monthly or quarterly meeting with two of the tribal council members right now where we are coordinating our efforts and advertise like co-promoting each other's human services grants and all the rest of it and we're working on finding other areas where we can work together and we will have a land acknowledgement at some point it is very issaquah specific for all the tribes that have ever been in this beautiful area that we live in and so that work is ongoing and it's very exciting um and thank you for bringing it up again it's really exciting great yep okay zach you're running back in so um i think at this point we can get our operations ideas down and then we'll have to kind of go back there may be a few areas that we can kind of tie in on the capital side but i think in general would you rather do that first wrap up capital or come back or maybe yeah let's wrap up capital actually um [Music] [Laughter] so our goal is to eliminate anything off this list we'll do that more in the dot area um but are there any things that you know you guys did a really great job of hitting the mark on what the homework was getting down to something that was on the cip or one of the plans numbers like that um maybe the only one that would overlap is the tier one sidewalk gaps with the squawk mountain uphill sidewalk and all of that does anybody agree that those are can kind of be matched up or do they need to be separate ideas all right uh well so i put up the squat button up still cyborg one and i think that it should be its own one because it's such a long-standing um priority it's been in the walk-and-roll plan and it's now one of the top tier projects in the master mobility plan and yet it's not even an rcip so i really think that it's different yes there are other tiers like once i once said a lot of that is tier 1 sidewalks but that project i think needs to be called out and emphasize on its own to get done so my preference is to keep it separate and advocate for that specifically well and i might make a comment and echo that i think it might be of benefit to have an emphasized or focused priority on a specific neighborhood as opposed to sidewalk gaps across the city in terms of do-ability in my so mind the person who put down this here one sidewalk i'm going to say let's cross that off and just keep these off mountain because i don't want to have people feel like they have to split votes between those so yeah just cross and then i think all of the others are really distinct projects and so the goal will be to have each of those out on sheets so that we can split out our votes on various things and then let me just count how many we have because i have to figure out how many votes do we okay um pavement management program and the concrete management plan are technically two different items do we want them to be two here they cover two different things one's yeah i like them together because of the idea of maintenance over new projects but i could see them as separate anybody else two for together i like it together three together okay let's do it that way and then the green necklace projects those are each individual right okay so we've got four five six seven eight nine ten i guess that's a conversation for council if one of the priorities we could vote on that could end up on the list is green necklace is that as effective as calling out a particular project that is a priority for us in the coming biennium or not so that would be a question i would raise in victoria house well i think that if we can why i propose them all together is because like i was saying i think if we invest and start taking steps on all of these at this point in time then that's the way we actually get this done so i would put them all together if i think that we've been doing kind of pieces every once in a while but that the green necklace the whole idea is connectivity so i would jump together plus one all right that's two that's a good point and i would put them together but for a different reason which is um i want us to invest in the necklace but um the nature of acquisitions and whatnot is that sometimes opportunities pop up in some of the buckets more than others and i want to vote for acquiring lands in the necklace and working on the necklace and let um you know let parks and the administration figure out where those opportunities are within them that's good i think these two are the ones that are uh that's a good point so we've got two up there that are acquisitions and two that are trail projects you wouldn't want to count those one as green necklace acquisitions and one as green necklace trails i would like to keep them together just on the basis of their strength as a grant project if it's seen as a whole while we might not get funding for any one of them uh at one time it's stronger if it's seen as an overall project to kind of get you know tibbetts creek trail um uh funded for instance if it's seen as a larger project that the state or any other funder can see as a long-range goal for us and we're really committed to it so are we feeling like all four of them together or acquisitions and trails all together okay so then so that's one that's one yes and this is together okay so um then we can move on to operations and we'll just kind of have to we'll figure out during the lunch break how many jobs we want to give to everybody for operations versus capital so perhaps we could have a quick conversation about that with the council too before we go on it right social event you're saying rotation about why not about yeah all right okay so this one is a little bit more difficult because we don't have specific you know like numbers and call outs from the cip so there may be more people describe them in different ways and we might need to adjust together but the goal is to get your three to ten operations priorities dola all right so i'm focused on you know six months ago we said public safety and social services um and um my mind are going to be in those veins and so um but social and social and economic vitality i decided within that to focus on major employers on the employment side of that so um we have under se zero sorry se1 increase in recovery of existing businesses we have a couple of potential actions that we haven't done yet conduct a study to propose tools that would give issaquah a competitive advantage to recruit employers that fit the city division so i would just call that recruitment study or or business recruitment study and what's the objective uh se1 se1 c1 which potential action is it it the potential action is not enumerated with uh with an acronym okay so i'm just going to call it it was it wasn't well i know i'm just well the first i don't know but if we could just call it a business recruitment study is what it is so kind of related to that develop an employer recruitment plan eg major employers marketing commercial space i guess that's really it's sort of a i guess the first one is competitive advantage and the second one is employee employer you know what i'll just leave that as a business recruitment study that's what i that's what i want um the other a sec but a second thing is a recruitment metric i am struck by the fact that although we have great metrics we do not actually have a uh any sort of metric i believe at the moment to reflect se1 so i think an sc1 metric of some form whatever the administration thinks is is a good signal would be fine with me um so then under um public safety um cs3 uh public safety resources meet our diverse community needs we don't actually have any potential actions so i'm going to suggest a couple um one is evaluate body cameras um i hear from officers that they would love to have body cameras if it's done right it's a it's an advantage for it makes the public safer safer and it makes police it's time to light up police operations in a way that the police like um evaluate adding more non-lethal tool options so um there are there are lots of non-lethal tools that are on the market right now i stress adding not replacing um just adding things that additional tools that uh our officers might have that are not lethal um and then um a third thing operationally would be a property time metric we do not have a a crime metric specifically related to property crime and we're hearing from the public that property crime is an area of particular interest thank you that's it for me yeah victorian question um question on the uh non-lethal tool so would that in your mind include programs because we've recently added um programs you know staff members that are there for mental health or if there's not i mean i think those are already being integrated right i was wondering if there are specific literally tools tools on the tool belt that that officers uh might value you know in helping resolve situations that they don't necessarily have thanks yeah just clarifying those literal tools or literal tools yeah yeah i like it okay anybody we've got chris and barb i didn't see which one of you guys okay chris i'm going second on everything right and my kind of builds on told us but a little bit differently i don't want to and and i was trying to uh channel the what's what's useful and what's less useful um but i want to see us reduce property crime back to our pre pandemic level and how you go about doing that that's your business but i want to do that i want to find a way to integrate our boards commissions plans strategic plan and budget and cip process into a comprehensive integrated whole so that it's not a bunch of stuff so it needs to link together so some way to bring all of those things together uh yeah well you know it's integrate our planning processes is really what it is and if you call it integrated planning and then if you just remember from the record that it's all of those things that we do to plan as a integrated community planning i know what he's talking about it's fine and we've been talking about it for a long time it's more of a it's councilman gray that's a great point um if you think about the new boards and commissions we've added in the last couple of years if you think about the strategic plan and the new plans that have come along since the strategic plan it's just building up the connective tissue so that the review cycles are known and understood and that after something is updated and we know how how and why we're doing it and how it hangs together because otherwise it's frustrating to people who build a plan and then it falls into an abyss uh i want to improve the resident's perception of the built environment um i want to increasingly wait wait wait wait wait wait wait wait wait you got to think about buddhism yeah and similar with the reduced property crime no i i disagree with you on that i think that that's the mayor and the city administration's job to figure that out i don't want to tell you how to introduce property time i want you to come back and tell me that it's done and how you're how you're going to do it so how do we as a council then choose that as a priority if we don't know the how well i think policy is about the what uh execution is about the how our job is about policy the administrations is about the how we tell you what we want to accomplish council member ray's got a great point there yeah we have a crime analyst coming on and we have dale markey working with the police department and so just giving us the what is mine it's fine because then we can tell the narrative back the council of these are the resources you've paid for and maybe new resources we're going to put in the budget and the outcome will be that you will be able to see that we are reducing property crime i i don't think it's our place to say add three new people right i think it's hard to say here's a problem um we are a policy body not an administrative body so we need we say the directional stuff we want to i think we should say here's what we want to accomplish and then turn it to the experts and say how best to do it because i'm i am no expert and i wouldn't have any idea how everything is property crime but i know you guys do well and just uh just to add a little bit to that not that it's bad to get more specific though because we have all these planning documents that have described with experts what are the best practices in terms of a particular areas and there's another way of thinking too that we are a policy board and the executive is management and they carry out the policy that we enact to so i think there are multiple ways of thinking about it and if we um if anyway no thank you thank you for that i think council member ray has hit on a really good point here and that is that you don't need to tell us how to do it how much to spend how many people to hire you do need to tell us what you want that's very helpful i i mean i think we should be about outcomes and and what outcome do we want to accomplish i want to reduce property credit you know and and i want uh yes to get people excited about our built environment and you know get it back up to where it was five years ago because it's plummeted thank you um for the great metrics so chris i think that's totally fine but i also want to point out we do have a plan that does have potential actions in some areas right and and we reference those potential actions so it's i'm not disagreeing that the way you're facing it today but it's also true that we often do prescribe not people with dollars but uh specific deliverables from the administration for the strategic plan yeah and and those are things that the administration came up with well but that we yeah yeah we did but in the end we're actually going to do this yeah and we're going to sign off on these too they're going to come back and say oh so here's how we're going to address proper crime we're going to do we're going to have a crime analyst we're going to do community based policing we're going to do this we're going to do that and we're going to say yep yep no i don't want to do that so all right here's what we heard here's how much it's going to cost so i don't understand this this current one crew perception of builds environments what do you mean by built environment well it's one of our strategic goals and it's one of our performance measures and we we don't particularly uh score well on it and and we've been declining the people don't like the built environment so it may have a lot to do with title 18 our bland juice code might have to do with how we do permitting it might have how we do reviews and i don't know i just want it fixed all right all right so that's that one um wait one second victoria well i just on that one when we when i'm not gonna interrupt but i accept to say that title at 18 is i have some thoughts from our conversations about the environment on how we could address the whiteboard the follow-up list yeah we're title 18 which is our municipal land use code and so that might be an option to help with some of those things because we want to do everything in the update so um maybe we could add some ideas under that when it's over to me love it love it i just have to push back i'm looking at the strategic plan built environments this own the only place it's mentioned neighborhoods retain their charm and distinctive character pattern and settings that include both built-in natural environments that's the only reference to those environments okay go look at the performance measures then sorry i lent you the wrong legislation it's from the community survey okay oh that's right yeah it's from the community all right um so also from the community survey is are not from the community survey from our performance metrics i have noticed that our hours of equity training for our city staff has not been increasing so i'd like to see us do an increase in the amount of equity training we're doing by at least 15 um and then i have a couple of things that i didn't have when we started today but i've walked them on one is we we need to have to improve our data analysis and capability and build out a continuous improvement program how do you want that written uh increase our build out our data analysis capability and those two different items i think i think they go together they're they're they are they are highly integrated and i think i think that was kind of where wally was going with that build out data analysis capability and implement a continuous improve process improvement program just to be clear thank you yeah and then uh my other walk-on is we and and it sounds like this is in flight but i want to make it a priority which is we need a master facilities plan we need to know where we're going with facilities we need to know what city hall is going to be we need to know where fire station is going to be we need to know all of those things that we don't know all right that that's all that's all i do it's all i need have you seen that's all you need fantastic that's what's going to make you happy uh so i'm looking at my list here and i i need to say that these are not in like first second third fourth or anything like that so so let's see where do i want to start um so i think i think i definitely would like to see us add a second position in the office of sustainability so what's the outcome the outcome is that i would like to see the uh give me a second the mayor has a comment okay i think um what's most helpful for the administration is what you want done out of the climate action plan that's right because then we can figure out is that a third of a position plus a consultant so yeah give give us uh something in a plan that you think needs to be resourced and then we can come back with the research because it might be more like this is really more for public works exactly so you've got these specific action items under human services climate action pick it and say this is what we like to do and then we can resource it because it may not be a position it might be consulting though exactly yeah no i'm sorry i did not copy on it but that is exactly where i'm going so uh what's the outcome i'd like to see the um climate action plan accelerated i'd like to see um uh and i'm hearing from people in the community who feel it's not going fast enough and i'm sure you've also heard from those folks but we have a goal in uh 2030 uh and here we are in 2022 we're talking about a budget because of 24 we're almost halfway through so i think that we need more resources now if that's in person or if that's a consultant or however it's done um that's that would be one of my definitely top priorities same thing with this next one and so let me start by saying this could be done many many many different ways but uh i'll just throw it out there i think that we need um we need some way to really focus on our housing on a progress on housing and i'm feeling really kind of um either frustrated or at sea on this issue how are we doing and i'm not saying that this isn't happening but what i think we need to do is kind of bring it all together so the council knows how many affordable housing units are on the line how many uh housing that's affordable is on the line how many single family houses is on the line how many multiplied um are we encouraging people to come here and there's just a whole mix of things that um i just feel like don't have a good grasp of what's happening or what we could be doing as a council to make it happen faster so so i thought of like a housing czar or a consultant or you know just uh reassigning some people that are already there to just focus more intently on that but i would really like the council to start receiving information on a regular basis about our housing picture and where we're going with it and how we can encourage it um how we can encourage more progress in that area okay can it finish your question is is that part and it might be it might not be is that part of our larger data strategy though you know it's just one important element about housing it's more like no i'm thinking more of the data okay how are we um how are we making strides towards our goals okay how are we making strides towards our goals and right now as a council member i don't know that i have the information so it's it's database it is data but then it's also action what can we do to accelerate um our understanding uh and it fits under the summary was we have seven areas of the submarine that said should be our focus how well is planning for future growth going quality of the development in issaquah availability of affordable quality housing and cost of living music while we're on that were four of the seven items and so i really think we need to focus on housing so but i will let the administration figure out that so and then oh no here's another one so so uh in the area of transportation um we lost the transportation demand manager because of of cobain i would like to see that that focus come back and transportation demand manager is someone who's encouraging people to take transit encouraging people to know where the trails are so they know where to walk encouraging people to bike um working with a employee employers to get ride share and ban goals going and if you look at the traffic out there you can see that we're back to pre-coded levels and so i think it's really time for us to start thinking about how do we bring somebody in consultant an employee somebody who's really got that outward facing i even thought it might be part of a communications group because it is an outward-facing position it has to be a person that knows a lot about transportation but it also has to be a person who knows how to effectively do outreach the public and do informational campaigns for the public so it's kind of a mix of transportation savvy with how do we communicate with the public so or can i ask you to speak up when you're i just want to make sure everybody online can hear is everybody having a hard time with me i think you're fine oh okay all right uh and then uh the last one and this will be no surprise is i'd really like us to see us increase our human services grant funding investment and at the recent civic meeting i know so at the last meeting we agreed to accelerate the um the investments so that we're not waiting to 25 to start using a formula to start boosting it but even doing that we are still nowhere near meeting the need we have 1.3 million dollars in requests for grant funding and we are only able to uh if if we apply that if you prove it in the budget it'll be 400 543 000 um so less than half of what we're being asked that doesn't take into account the fact that the inflation is affecting our nonprofits just as much as it is us labor costs are growing for them just as as it is for us and uh also we are seeing increased need and um i expect that we'll have more non-profits coming into israel to provide services so that grant funding is right now is even with the acceleration and which i appreciate very very much but even with the acceleration is nowhere near meeting our needs and so i'd like to see us um i'd like i'll say it again like like to see us double what we're doing but if that's not possible i'd like to see us make a substantial investment in the human services grant funding all right that's it that's fine okay we have a next volunteer victoria okay so um i have several that are already up there my first one with the icap one i do think we need more resources so um if we're gonna leave it at that that's fine i think they do need to be in-house [Laughter] several on title 18 which is our municipal land use code so in our conversations on that we have put a number of things as important but not possible to be done in the current update and so i would like to see consulting resources or in-house resources to make several of those happen in the in the near term or get those started and i think that they will also help with this perception of built environment but they i think also need to be probably indicated on their own so um on the whiteboard list item 25 has to do with expand and diversify the housing options that will take a big community conversation and we'll take a lot of research on how to make it work for us and so there needs to be some resources on that uh also in the title 18 whiteboard is number one which is a stream buffer update study and then on and that has to do with developments and protecting our streams and then title uh title 18 whiteboard number 28 is about parking um and so this has to do with parking mins and max and um frankly it has to do with a lot of how we develop because it has to do with sustainability and how car integrity we are and how expensive housing is which is really important so it's not directly but it is one of our drivers that we can work on regarding housing employability as is the as is the diversity of housing and getting smaller housing types um and that's also in our housing strategy work plan is in the icap and it's in a lot of our plans so that one i think there's a lot of different numbers and systems you could attribute that one too but i want to do it so from that list um number 25 or number one can you go over those ones again uh what were those what the priorities that you listed out so the first one you said was item yeah okay so would you group all of that together as work on title 18 backlog whiteboard issues um with kind of some call outs i'm thinking when we're voting right can i can i add something i really appreciate the council member kind of is is looking at things on the list you are also going to go through uh exercise as a council where you're going to look at that whole whiteboard but she's letting you know right now there's three things that during budget process are very important to her so i don't want you to decide the fact that everything on the way forward very much like the way you said it is important but cannot all happen within this first update that is the work plan for the next four to five years is what's on that like and that's what planning policy will continue to work on you're actually giving them a work plan that's very well laid out so um you're gonna have another opportunity thank you for putting a few on the table today that's really good yeah i mean they're budget priorities for me yeah that's right so then should we uh consider that as individual budget priorities or a group budget party or we can come back to them because some people might like i'm going to bring up some very specific actions with regard to housing diversity from our plans and we might want to group that together into a separate thing so maybe maybe we just get to that yeah because it also touches on house marketing michelle's um yeah affordability it's not exactly the same but it's it's in the mix so yes okay so i had a ta plus one on tv which i think could be a study lessons learned also that'd be great um and then i had one that was kind of similar to the um integrated community planning although i just had sync up the tip cip mmp and icap which are a lot of acronyms but that's transportation improvement capital improvement master mobility and it's my climate action plan and sync those up but i guess we'll just put plus one on the integration oh that's exactly it's just a little smaller scope i just want to have a dream big well you've got comp plan in there too yeah [Music] um okay and then i have two more one is um so i it's different i think then but it can be in a conversation about the human services so we have you know recently the ssp committee looked at a grants program and emergency housing options and so i thought maybe establishing a program for pilot projects of that sort could be a focus because it seems that that's going well but we're still expanding in that area i think we should continue to expand in that area and then my last one is that um this dashboard theta one this let's see maybe add the data analysis capability of continuous process improvement yes yeah yeah russell do you have questions or are you wanting to go next i always want to go dance dudes so we had an arborist and we got river artists and so it would be good when we go to talk about our risk to talk about why we got rid of our argos that's fantastic russell thank you i'll go through just a couple that i have in mind um i think that we should look at whether it's appropriate to have behavioral staff to 24 7 24 7 coverage with our police it's very effective to handle the problem right when we have first contact whether it's a person's just experiencing homelessness means getting put back into transitional housing right away or a person needs some mental health care right away we can get to them early and get to the problem i think it makes a big difference so i'd ask the administration take a look at that on the housing focus i would uh ask that on as an overarching principal we think about attainable housing that allows our young people to return home and our seniors to age in place this is kind of overarching ideals on the icap focus i think that we need to evaluate whether it might be appropriate to increase our canopy levels in parts and open space and whether or not the open space number is a little bit higher than our parts number because we need to keep our cars still open for fields of play and playgrounds and things like that but our open space number could be higher to bump up that overall number so we continue to be a leader in tree preservation arborist issues tree uh city usa issues so how do you pull that down as a budget ass well i think that i'd like the administration to evaluate whether or not um our tree canopy is appropriate whether it can be increased in certain areas um split out the categories a little bit later tree canopy evaluation line yeah you should combine it that would be great which is what the arborist and tree canopy analysis and again i'm just going to ask maybe if this could come off um but we need arborists expertise whatever that is um but what i'm hearing is you want focus on the health of the forest and tree canopy we have the potential growth of the tree county we have for many good reasons so you can i think you can put those two together we want the canopy to be where it's appropriate where it will thrive city administrator uh the administration has been talking a lot about this largely coming from the title 18 discussions and so the the terms we've been using is urban forest management um and from our perspective that covers i think everything you're you're talking about here today is the additional investment in in professional services either city staff contract staff to help us manage the urban forest fantastic thank you just two more quick ones just coming back are you comfortable with that or i think we should at the very least consider and have information about the arborist issue but um yes it's fine as as a part of the conversation about the forestry okay so let's put it down as urban forest management and then knowing that when the administration comes back with budget they will need to justify and have a conversation about arborists versus outside dollars versus study et cetera right now you just have two more i'd like the administration to take a look at whether or not it might be appropriate to support some of our city staff supporting any of the civic groups or other groups that are outside of our regular city purview um i'll kind of harken back to a day where we had a police standard when i was on council that encouraged a 35 community um involvement kind of uh value so that they were on the streets 35 of the time not necessarily writing reports or making arrests or transporting people but we're out on the streets talking to people and and getting close to the community as we're coming out of code but i'd like the administration to take a look at whether or not there are some positions in our city that can serve on a border commission or be active in another group whether it's the chamber or eia i know we have eia people that are next official members but whether or not there are opportunities for us to get closer to the groups that are out there so that we can become a stronger community we'll know about the problems earlier we'll be able to intervene on an earlier basis to to help with the issues before they become something that goes to the press or becomes a larger issue so just an opportunity to think about that and lastly i'd ask the administration to um look at campaign finance for 2023 whether or not we um put caps on or increase the caps that are already there and whether or not we do public financing for campaigns i know we've talked about access to the council an increase in the bench of people that might want to come onto council and if we had some campaign financing officer number say 500 for people that were um signed up to run and pass the date to um you know to withdraw but 500 for instance would cover the filing fee and then give them a little bit more to handle any infrastructure things or logistics for their campaign just to get started right so it's not a barrier for people that might want to run uh to consider coming onto the council so we have a wide variety of people that are running and have contested elections that make a difference russell was just talking about does the city have a matching fund for charitable contributions our matching employer match not that i'm aware is there a reason we couldn't yes there is a reason i was afraid you'd say that wally get the public funds i i just want to preview that suggested campaign financing exploration might not be uncontroversial would be controversial oh there you go sorry yeah yeah just go back to you so council member joe i'm thinking um you are bringing up something that is good policy discussion but i'm not sure that it's going to feed into our budget so i'm hearing a great idea here but i i think you the council at some point might want to take your idea and talk a bit more about it well if we decide to do some financing for it it would impact the budget potentially and i know that we should have the conversation now if we're going to talk about the 23 election to be effective for the 23rd election so i'm throwing it out if it doesn't get any support i certainly understand but it's a conversation all right uh so value items from like you bellevue has a program that they um it's more like civics education bellevue yeah so that's it's not exactly your point but i think it's related because it's about what it's what you do as city council what you do as a board member how the city government works process and so and presumably they budget for that because that could be another option that might require a good suggestion okay one second bart did you have a comment or is your thing still up i'm currently working with a couple of residents on a volunteer issaquah essentials we've just gotten all the building material they do have dedicated staff resources and it's a it's quite an expensive course but even as a community program i'm thinking of doing this just like i did how to run for office i'm thinking of launching a a version of an issaquah essentials but if the council is interested in this i wasn't going to use any city resources to do it i was just going to use volunteers in the community i think it's a great idea i think it's a way that you offer opportunities to board and commission members to learn all of what the city does and to get students excited to get residences bellevue does it to broaden their candidate they do it it works the program is well loved but they actually have people like two people i think who brought in that program and it's quite amazing great suggestion and then uh councilmember joey you've had one on housing that i wasn't sure how to capture yeah i think that just keeping the ones that are up there are fine i've just talked about um letting our young people return to our city and letting seniors uh age in place should be kind of the overarching focus as we talk about attainable housing at all all levels of all levels of expenses so there's one on the bottom that says add resources on housing okay who haven't we heard from have we heard from everybody there okay then i can go can i ask um the one that uh russell i believe added that had to do with the ipd i don't i can't read what's written there 24 7 behavioral health sports for law enforcement that's law enforcement okay i'll regret it we'll rewrite everything [Laughter] [Music] well i'm running into a problem okay then i will go ahead and go um my first priority is the title 18 backlog list which i think yep that yeah i think you can put there um i also have the title 16 building code um so i want to make sure toward the idea of icap and just making sure that our built environment is better we can start talking about the building code um a mirror 24 7 the behavioral health um item there yep plus one um and then the consolidated city hall up there i kind of had that down as facility planning i know that's been mentioned elsewhere yeah master facilities plans so i wonder yeah do we want to combine those two yes so get rid of city hall and put two yeah don't get rid of city hall there's gonna be a line item there and put two marks next to master facilities plan are we just a clarifying question on that for the administration are we envisioning that what's going to services safety and parks the review of our facilities and their assets will turn into a master facilities planners a separate thing that we're under consideration that's a great question um autumn's work that she's doing right now will feed into a master facilities plan that is a forward-looking plan that talks not about the staffing needs now but the staffing needs in the future so that we are planning ahead and you can see that um city hall whatever city hall looks like where it is what it looks like is a piece of that plan but the master facilities plan gives you the whole picture and the goal is to be able to then bring forward a recommendation of that for a city okay um so i'll read this out before you write it down but in the master mobility plan policy 6.3 is partner with public agencies and or private companies to pilot new types of small-scale transit services and neighborhoods that are not currently served by transit i know we have that is listed as a major challenges in our work plan and so i want to explore hey if we're not willing or if some transit isn't willing to take that on with us what our opportunities are to do something that would serve our community um so in a way it's like that's already on our work plan list but this is potentially a different level of investment in that area sorry can you see a little bit more about that i would would you mean if south transit's not going to work so metro yeah um so we just got in the q2 reports that there are major challenges to that because they're really not willing to partner with us on that as a project and so i think we need to potentially explore other ways of going about that including with us paying for a service running or whatever that is but it would be an entirely different level of funding than i think we had contemplated in the past i'm having flashbacks to the conversation about a new city hall because this is a topic that has come up every couple of years for the last 12 years so which is which is to say you're probably right yeah basically i'm not willing to wait anymore um i i totally agree um clarification are they unwilling or are they unable or are they just so difficult to reach that we don't get any response kind of a little bit of a new one yes oh andrea oh good inside stuff okay hi uh just real quick um we uh they are unwilling so our partner for local transit options would be metro and we have been trying to talk to them about a local transit shuttle option and they said it's completely off um off their priority list so they're they're putting that on hold they don't know when they're going to consider such programs again we actually have uh options coming to tab this month we've been working on this item and it will go to the mobility and infrastructure committee pending tax discussion next month so um we trying to get in time for some of these budget priorities as well so we're bringing forward some options so anticipate some conversations soon about what these options might look like and i'm attending um yes okay let's be good conversations thank you so andrea what you're saying is i'm reading your mind and just giving you a plus one to anything that you are going to include in the question fantastic great um and then i've got two more neighborhood communications i feel like we've fallen behind on that area and so i don't know whether that needs to be additional staff i know we used to have a neighborhood coordinator obviously we've had a time period where a lot of things have gone virtual we need to establish and kind of roll with that but i feel like there's a lot more that we could be doing there that might require resources um and then some sort of transportation staff or whatever is needed to support the capital projects that we have on our ask list so transportation staff from my perspective that's much different from the transportation demand management this is transportation capital staff just to make sure that we are staffed up because we have run into problems where we've tried to ask to get things done and we've heard hey we have staffing issues and so i just want a focus on that area and that's my list on to you zach all right well cool uh okay so some of these will be uh red marks um but the first one i kind of got specific though um within our particular plan so i'll get through this and then i'll write the right hand it's not already there so the first one uh and going through the strategic plan um objective uh growth and development for potential actions a and b really call out to me um so um i would really like us to kind of begin it's a whiteboarded some of it is a whiteboard issue and i'll get to i'll read them off in a second but i'm not in i don't think we have the ability to complete them but in the very least to begin the process of investigating and evaluating best practices and emerging solutions uh engaging with the community and assessing our future options and these are around missing middle housing and near neighborhood businesses so in particular the budget priority here would be ensuring we have the resources and the staff our consultant capacity to begin this work because i do think um in particular the community engagement is going to be big around those issues so it's strategic plan objective gd4 which is across the city there are a variety of public amenities housing types educational and other services that contribute to a livable community so protection potential action a is identifying implement code changes and activities to address neighborhood-based and community-wide gaps and amenities and services so this is a goal i've been thinking about for a while in terms of some neighborhoods have incredible walkability to businesses and goods and services that support their lives like dry cleaners when i lived up in the highlands i was able to walk to my dry cleaners walk to pick up food during the pandemic because it was right across the street go to the movie theater every now and then and when i grew up in south cove no such luxury existed i had to walk or bike down northwest smash road and avoid cars so um that's something that i'm really interested in starting to get in on what are the kinds of innovative practices that municipalities in the region and across the country are doing to address that it also complements our climate action plan our normal ability action plan by eliminating single occupancy vehicle trips for small trips so um and then a potential action b is to develop code amendments to address missile middle or other housing options so again this work is cited and supported in a lot of our planning documents the housing strategy work plan strategy eight um which is about housing diversity um and the central is called plan which references housing diversity and access to housing across income levels several times and also our climate action plan that in the implement implementation matrix tl 1.3 is adopt codes prioritizing missing middle housing so anyways the kind of ask is to begin work on and let me know if you think this fits somewhere maybe this does fit i think it does yeah because the amenities is also whiteboarded it is wonderful is in like at least three plans like you said so i also wasn't sure how to this might be better because we reference it you know a lot of our plans put point in the same direction um and i think the administration from illustrating understands kind of what we're getting at here from a budget okay so that's that one um the next is and i'm kind of surprised that this wasn't brought up yet although i suppose this fits into it so strategic plan objective mobility three potential action days to develop a citywide transit plan that includes lessons learned from case studies on stationary planning the mobility master plan also goes a little bit further to say develop an adopted transit master plan that defines transit policies transit routes and streets where transit should be prioritized key locations to serve transit and transit projects and programs to be led by the city of issaquah i wanted quick clarification that those are the same action because they're kind of called out differently okay um so then uh this is a top priority for improvement in the 2021 community survey getting around by public transit um so the budget party here would be to make sure that we have the staff resources right now in the planning calendar it's listed on december 31st which i think so just making sure that it will um that will complete the work by the end of 2024 which i think is described in the work plan so um do you want to put it down as transit master plan yeah i'll do that i think it's related to mnp i think it is but i think this is something because it does feel like the transit master plan you call out underserved neighborhoods but this is for if you're talking about action as opposed to planning for action in the upcoming budget those might be different so you feel like we need a transit master plan more than what we have in the mobility master plan um is kind of the call out there well the intents around both plans are different right so the transit master plan we would use to be able to highlight where the area is service and needs are for transit different and more focused than mobility i think a deputy council president has it exactly correct so the transit master plan transit plan is actually something that um we're finalizing the contract on right now uh so uh we are getting that work started this year um and some of that work will help inform the ciptip project list next year um so continued support of the transit plan would be great for next year uh so we can finish that out in accordance with the work plan um but it is different it's more specific than the master mobility plan um and talks about how we can ready ourselves for the light rail um station what are the actions that we can do um what are the investments we need to make for uh getting ourselves ready for light rail and providing connections to light rail and then all of the transit service improvements we can make um in addition to that so that's really the focus of the transit plan so maybe we leave it separate yeah is that what you're thinking okay uh transit master plan all right so the next thing might also be a whiteboard issue then so um the climate action plan uh tl 1.1 talks about incentivizing dense misuse and transit oriented development and part of the considerations there is evaluating parking minimums and on-street parking needs so i i think that's this one right so i can't double the market that's there but i'm really just interested in again us exploring what best practices are and evaluating our options and connecting with the community because that's going to take time and money does that include what did you think yeah okay um human services strategic plan oh okay so uh in the human services strategic plan oh this gets really um specific um focus area three strategic approach 3b strategic action 3.7 c and i'm only listing this out so the staff are going back and looking at planes they can find it but this is to help to implement a minimum of one of the following services in issaquah that respond to the homelessness day center temporary transitional or permanent housing so one of their strategic actions is to advocate and work with local and regional partners to create a minimum of one housing program either temporary transitional permanent for individuals who are experiencing homelessness of law so i know we're currently in the middle of exploring a kind of temporary housing model for our unhoused population in nissan um the budget priority here would be ensuring that we have the resources and staff support to continue that work into the combine thanks um yes we're we're we love in isabel we love the pilots so yes there is a pilot with an ask and then that program could be transitioned into a permanent program where we may be able to get a contract for service with the keycount regional homelessness authority so thank you for bringing that up wally i don't know you know we don't have monica here today i don't know if you want to add anything about where we're headed with the pilot only that we've been to committee we have a plan we have the dollars that are necessary we have a funding source so um i think we feel really confident that as long as the council from a policy perspective is an agreement uh that we have a plan and funding to move forward let me ask a question robert how does it work with a two-year budget if we go into something and say we want to pilot something and we find that it works do we just come back with that mid-year and say we're going to bump it up and somehow we have to find money for that from other things yeah and that's a great way of doing things but now i'm looking at a two-year thing and going wait if i pilot something do i not get a chance to really do anything about it okay you like the pilot so then to clarify is this something i should put up on the board for a coming biennium priority or is this a pilot that will occur um i i put it up there because it's our priorities right and do you think there's something else up there so my mine is the same idea human services as a pilot well because it was specifically the homelessness yeah yeah yeah so i took this to mean kind of like a bucket of money that we would use for ongoing pilot programs well it was it was a bucket of money to so my idea which maybe i don't know uh but was to have a bunch of money to build on success of pilot programs in government services with the homelessness pilot as the example so i think whatever you come up with for yours i think mine is can be part of that i'm fine with taking that off if everyone thinks that that or just knows that that's kind of part of that flavor this one barb and then wally oh um so maybe wally could uh help me with this but i believe the money from this is coming from a specific uh stream of money sales tax that the city of issaquah has retained uh is the funding source and so that is a multi-million dollar uh funding source susie has the precise number um i always seem to get it wrong but uh there are sufficient money being generated from that sales tax uh to pursue the pilot as a more permanent program or as councilmember huns indicating if there's other options or other programmatic opportunities there's funding there as well i also just want to chime in and say if the king county regional homeless authority believes that this is a great contract for service i would propose that we get the contract use their funding and you repurpose this money for other initiatives that you're interested in yeah okay okay um what else um all right i've got kind of uh now a list of things that i haven't really thought that um deeply about some of them are up here though um so councilman remarks is absolutely right you know we have a strategic plan objective that we recently created last year around public safety resources that meet community needs but we don't have any potential actions listed under these i think these are interesting and worth exploring um and i think as was said earlier that the crime analyst will come up with some data that might lead us to some potential um actions same with the data on the property crime venture is something we should definitely explore creating i think that's a great idea [Laughter] all right um what else i don't like being this broad but i thought anne's comments were well said about the climate action plan um and i think it is up to i've listed a couple priorities from the climate action men that are important and i think there are a couple that have been laid out on the table that are important but to ant's point and the point of others i think it's really important for us to unders try to get a sense of what's it going to take to implement the plan in the timeline that is currently set out so short-term actions by the end of next year are envisioned to be complete and i'm not sure if we're on track to do that so i almost started thinking about do we need resources to have a work plan of the icap that says if we're on track and then a description of why that is that might inform whether or not we need staff or consultant resources beyond what we currently have is that some sort of a pin to accelerate icap implementation i think so um and then just to you know reiterate that again i don't like being this broad but it's important because if we're able to actually meet our timeline of the climate action plan i think that that will be a signal to the region to act more aggressively on climate because i feel like people without plans and then don't necessarily meet the timelines all the time so if we're able to do that that is a beacon of progress right um another thing i i might be alone on this but the new solid waste contract rates are are going to be quite a shock to our residents i do think that we need to create a runway somehow um so i'm going to have that it did it didn't seem like there was a lot of support um on that idea but uh a runway of uh uh like a couple years i think is important for us to in the very least run away and completely much more by runway are you suggesting that we supplement the cost to our citizens out of sustainability fund or sustainability funds general fund and bundle just yeah whatever tools are available to us to consider and then we can kind of discuss what the or the administration can kind of think about the scope of that support as well but i think it should be an aspect of our budget discussions our upcoming budget discussions um with that i had an interesting conversation um with someone uh just yesterday about potentially adding funding in the budget for a new water sewer and storm water rate study to just keep it in the budget just in case inflation drives up a need to redo that study so i wanted to put that in there but maybe i don't maybe that's something the administration is already considering and doesn't need to be a priority um well so you said water sewer right yeah um so i'm on the regional water quality committee for the and the sewer rate i know is expected to really increase a lot yeah um but the drivers of that are not within the city's purview that there's not very much that the city would be able to do unless it's something like a rebate so i guess i'm just wondering i don't know that a study i guess i'm wondering first of all is it really all of those things that you would want to need and then what's the there's limited actions yeah well by the study i mean our expenses might be much more than what we've planned in the current five-year rate analysis so if inflation continues to go up we might need to reevaluate how we're approaching those those needs because those aren't funded by anything except for water revenues right so so let me ask you a question is this just specific to water and sewer or is this more of a do we need to do a mid biennium inflation analysis of our rates for things so it's things like recreation our permit costs you know all of the things that we charge does that get toward the idea i think that's interesting hopefully before we we end today we can talk at the end more about inflation and you know this is really uncharted territory uh for us uh for many number of years uh i i think it's going to become something we just do um there will be you know drivers on a whole variety of levels of those things like classes if all of a sudden we discover no one's taking our classes because they cost too much that's going to be an impact for that if the council from a policy perspective wants to be thoughtful about uh charges uh waters or anything else we could do that so i think that's going to be part of our normal operating that will continue to keep the council prized and as we would do the uh the mid biennium check in with you a year from now i think that's just going to be part of our standard procedure so i certainly the council could prioritize it but i i think i can safely say the administration will be doing it anyway okay great you want to just i'm okay removing that then if that director moon did you have anything you wanted to add or is that no okay all right um neighborhood engagement um ditto i think that that's something that we should consider if we're in a good um place to be able to consider what kind of support that needs i think that since we lost that worker it has been well taken care of though but in terms of what what are we envisioning community engagement to be we talk about that quite a bit and that might need some staff support or perhaps um training across departments in terms of how to communicate with community but mayor quality did you have another one i'm going to use the word pilot again you guys piloted your first community listening session which was great and there are neighborhoods that are going to request you do that as well so i think we should have some conversations about what it is that you expect as well because um i think we have a couple of events coming up national life house and concerts in the greens and councils attending as well so it may be something different than what we were doing in the past but i really appreciate your efforts to try the listening sessions and to be showing up at these community events i think that's awesome anyway it may look different than it was but you definitely have been trying some great things lately so the administrator and just to remind the city council in this budget before 22 you added one full-time position to communications to do precisely what you requested so we now have a full-time communications manager who is not spread among other responsibilities and uh you know additional support staff there so we're doing we're doing what we need to do plus autumn's still managing the whole shooting match so um you know i think we're feeling very comfortable but again we're still coming out of the pandemic uh well we're really not coming out of the pandemic we're but but things like things remain uh fluid uh but i think we're feeling comfortable with the resources we just need to continue to see what the world throws at us and act accordingly all right well we'll set i'll leave that up there though but that's a that's a good point um and then the last thing that i had was based on what um city administrator about which i said earlier about performance measurement stop support i thought that was really interesting and i know that was already up here was it this one yeah um and those are my upgrade okay so before we break for lunch what i would ideally like to get out is are any of these things similar do they need to come together do we need to consolidate anything so that while i'm eating i can spend lunch writing down on the sheets so that we can go with the voting next section i have a process question yes uh is there an opportunity to now that there it's all up there to sort of opine about what we see putting it all together and and what not separate from the the blocking tackling of combining things but to comment towards the overall picture yeah i'm just trying to decide whether that we should have some time before we do the voting i think is really where i want to let people have a few minutes to push their agenda if i say it's so bluntly the oh that's what i intend to do and i want to give them space to do that um so do you feel comfortable yeah that's fine okay that's a good answer thank you i just wanted to make sure that yeah somewhere before we start placing dots great so what do we see that might need to be grouped or kind of assigned together as far as a potential way to indicate priority i'm seeing like when i'm thinking about how i'm going to be able to indicate priority i'm not sure how i'm going to do it across the cs3 evaluate body cams and on lethal tools versus reduced property crimes like if i want to indicate a support of those areas so how do people feel between those do we feel like they're different uh radically different okay well the property crime metric seems to go with reduced property i think those are going to go together sure because this is almost the outcome this is the way that's right yeah if you do chris's you'll get the property metric so maybe what i would say in my mind is cs3 is about funding for police tools where as the reduced property crime is data analysis and coming up with strategies does that make sense am i reading that right or should do we specifically call out cs3 evaluate body counts as one and evaluate non-lethal tools is another well i'll just point out that they are uh at least an order of magnitude different in size right the body cams is a big possibly multi-year effort right it actually fits better in a biennial budget than it does in a single year budget right and and adding additional non-lethal tools is much much smaller potential action so i i sort of like keeping them separate just in the sense that the body chemist one is a i just want to acknowledge it's a non-trivial it also comes with an i.t records requirement right okay so we'll keep the two of those separate for evaluate body cams versus evaluate additional non-lethal tools property crime metric i'm going to say cross that out there because it really belongs in the other area as as the person who said it i support that right okay yes yes okay what else do we see so business recruitment you know i i think um i i could be convinced to get rid of the improved perception of the built environment and and that concept is captured in the resources to deal with the white board i think that's just the level of specificity so i'd be okay with that if you erase that other one great we see a connection between ad resources on housing and accelerating action on housing with title 18 specifically or did we see that as different i personally see that as kind of the same work that would be documented like in terms of a budget so maybe but this one's focused on an outcome right yeah and this is how we get to a particular housing outcome that's having these conversations unless there's something beyond 18 that's required questions yeah so do you just want to leave it right yeah mary lou so i i do think they're different um and i'm just saying that from the point of view that there are cities around us that have their own housing authorities and we do not so we don't have a revenue stream to support a housing authority for a city of our size so that one that's in the bottom corner that's a big that's a big one so that would require some conversation of how to do that because we currently don't do that at all right now we support non-profits that do it but we don't do it okay what else do we see is everything else on there individual items nothing that needs to be grouped i'm wondering about but whistle joe is not here um i don't have an objection with that i think it also kind of goes into the other outreach items that are up there so any kind of combination would be acceptable so can we put that in with the neighborhood engagement maybe we'll call that top one rather than neighborhood communications um which also includes things about getting police out and encouraging staff community engagement with several bullets underneath put all those things under it yeah community engagement i think instead of neighborhood yeah then you'll cover i think yeah yeah yep yes yeah and i think i'll throw out um early elimination of the campaign finance uh topic if people would like i i think it's important to build the bench out but there may be better ways to do it rather than having uh the city take on any type of a funding or formal project now you've got everything let's throw it out there well maybe that's a means to an end and maybe the better ask is the more of a conceptual of building the bench and and getting civic engagement uh energized does it fit then better under another category out there for civic engagement that are building um interesting boards and commissions and involvement in our specific process yeah i mean i'd be interested in civic engagement yeah but i think it i think it is a different one so is that different from community engagements council member joe i i think part of what you're saying as well is about broadening the access to our problems and i'm sure that there is a work planning conversation that the equity board has yet to have about civic engagement and making it more accessible and more effortful so i like that i think putting a few of these things together okay so crossover campaign financing civic engagement part oh i just i don't want to lose the the comments that uh customer jill gave about city staff being involved in community organizations i don't know that we need to put it in there as a budget priority but i think just to capture that idea um and i'm sure you heard it so yeah but that was a little piece of that community engagement that i think is important as well can't read what's underneath campaign finance new solid waste rate runway and then i removed new one got it got it so how are we feeling about this list narrowed focus all of that so now pick your top two and we're done yeah um [Laughter] so good job on us for staying pretty much on time what we have right now is then 30 minutes for a lunch break um when we come back at 12 15 ish um we will have all of these things written out on other sheets so we can do the dot prioritization activity um started with funders you know discussions sales pitches all of that um so we can start to yeah go for it um this has probably been one of the most enjoyable uh retreats that i've ever been to and the reason why something that council member ray kept harping on when we were doing the strategic plan was like but are we really going to use it what are we really going to buy into that this is a framework that we can go forward with that we can talk about budget that we can prioritize and wow you are totally doing it today just by everybody's homework that you did you came to the table with lots of ideas that really were born out of community movement so this this to me you know before you get into your one dot that you're allowed to place up there this has been a very very good conversation and so council member ray i think we got there i think the strategic plan is a living document and that you guys are using it exactly how the best uh effective way they can so great great conversation great you're free for 30 minutes moves in there okay keeping us on schedule being the main person bringing us back but um so the next part of our conversation is about kind of the dog prioritization activity the output discussion so from our initial set of lists we had 16 total projects for capital priorities and 24 priorities for operations that our clerk is working on putting around the grouping we are going to give people about one-third of the number in dots so you're going to get six dots for the capital priorities eight dots for the operations priorities we're going to do capital first um so if you i'll give everybody an opportunity to kind of talk through hey this is what's i think is important for capitals and why we should focus on that area we're going to try and keep it short and quick um mark has to get out of here at 12 30. and so i want to make sure we get both sets of dots um done before that point and then we can have kind of the output conversation we're going to pass these around while everybody's doing their spiel um take one color and let's see do we do we have um seven colors chris wait okay i'll look at it so capital wait before you start process question these don't appear to have we had the we had the best ones correct we're just going to do it uh how does everybody feel about that six dots or like for individuals or technically yeah you should be able to use multiple boxes okay how many say you can put as many dots as you want well up to like three times [Music] two or three okay sounds good okay so capital um what do people want to talk about for a few minutes before we go into voting anybody anybody want to sell stuff yes go for it well um so i think community resiliency and recovery from the last couple years is very important and so just want to pitch one more time the idea of setting up a college fund so that all beautiful parks projects can go to college and i think that that would be the green necklace investment i'll be putting a lot of dots there isn't that okay anybody else want to talk through capital stuff i got i got two i want to pitch we heard from too many people about the pinch point we got to do the pinch point got to get it done and then we don't talk enough about the routine on black nugget road and we got to get it done it's we're just kicking the can down the road so both are expensive but both need to be funded and you know we gotta get creative to figure out how to fund them you gotta get creative can i ask a question about the notion well well i mean you don't you don't replace your car usually until the maintenance costs are such that you have to replace your car you don't replace your car really because five years are up you know we did address this wall about 10 years ago and we decided not to do anything at the time because uh it didn't need to be done like that and so the question is um why right now instead of when the engineers tell us we need to do it uh well if i i just was curious about the same thing so i wouldn't looked in the cip and it looks like it's actually the wall replacement is required by year 2024 i was wondering if we had anyone on staff that could speak to that probably not today but there is a good question there one of the community perceptions is that it looks like it's a problem but the reality is the seepage and all that may not be the problem it's the structural integrity of the tie-backs and all the rest of it so i think we need to get you some more information on it you could also decide my opinion only an aesthetic something that takes the if it is structurally sound if there is a date for a repair you can consider doing something to get the community here level down the drainage is not the issue construction stability yeah and so um sometimes you don't know that your car is about to break down and you wish you would replace it before your transmission goes out and you spend several thousand dollars replacing your transmissions like a couple years ago so um some of this is being a little bit proactive trying to get ahead of it before we have a disaster because if it failed it would be catastrophic and it's not a you know it's not a matter when the when the transmission is going out the transmission's going out so so maybe it's getting the professionals to tell us when the transmission is going to go out and it's going to fail um but it's one we've been talking about forever okay so i've got seven colors here um [Laughter] or whether we're just going to say take off a set of six and terror and such yeah okay so i'm gonna pass around i don't think he needs more than [Music] blue out of the atmosphere stick a stake in the ground but the environment put the uh cars on the road that are setting an example and set the infrastructure out there as well that'll help uh encourage others to follow that path okay so you need to tear off or just recognize you can only take sips for um capital and capital is all of this stuff on these walls that is black don't bury into the green areas and yes sorry um just the sight out of the black negative road they're turning them all no 33 um the department we have a request in already from the department that design work would start in 23 construction would be in 24.5 which is the plan for this draft budget the other thing i will say is what we are doing here as a project for priorities is somewhat irrespective not taking into account what the budget actualities are um this is not us narrowing ourselves down and saying i think the only thing we're going to be able to accomplish is x this is putting some priorities out there and then letting the administration utilize it in what the actual numbers are and then also letting us when we're coming back to our budget analysis and taking the proposal and making a decision is and how do we want to use our priorities if they're not all in the budget which obviously they won't be so yeah okay everybody ready go [Music] yeah exactly [Music] um it was um is okay up right yep okay so what i'm going to do is a real quick read through okay guys i'm going to do a real quick read through um so that it's heard on community and all of that will also take pictures um but the next thing we need to start thinking about is are there some natural groupings and the way that i think zach and i had figured it was the bottom grouping is zero to one and then we need to figure out where that uh match point is so think about all that i'm going through so we've got tr004 the 12th avenue uh sr 900 zero votes fc027 new fire station three uh street lighting zero icap solar on the community center route zero icap uh electric complete we have four uh wt015 water main zero st zero zero nine squat valley park zero pk zero three two hillside acquisition zero pk zero one eight dog park two uh tko three three black nugget retaining wall two we've got t r um 10th and 12th avenue i-90 crossing two uh tr030 and zero five for the concrete pavement management programs we've got four votes pko three one hillside park we've got two votes squawk mountain uphill sidewalk four boats and then the green necklace including the creek corridor valley trail acquisition and tibbetts creek trail and rainier trail we've got 11 votes okay so it is 12 35 i'm gonna wait on uh this ranking and we're gonna say we have eight votes to put on the uh operation side to give mark a chance to do that and then we'll come back to kind of where we see the things yes i think you said three three three three three on one i i know we're tight on time don't worry about this so i i just i just wanted to six months ago you know we said public safety was going to be one of our priorities for the year and we don't have a lot here we have a lot we also send human services right public safety resources we have a lot for human services we don't have much on the public safety side and although you know the ipd and the chief and the mayor's office has done an amazing job in turning that ship around we still have a lot to do i'm not saying that the things that we have here are necessarily the best i mean i like chris's goal-oriented version of it i really think um that we should that i would like people to consider this uh evaluation of the campus the ipd uh officers have told me it's a good thing civil libertarians think it's a good thing it's very expensive it isn't saying that we're going to do it but it's it's saying we would you know seriously ask the administration to seriously look at it i think it would send another signal um to the officers that we are not done supporting them that we get we are going to have an ongoing support for them so that's funny all right so i just want to say additional things about the additional housing resources um again this is a really important i think it's a root one of those root causes that we need to address in terms of a whole range of issues in our community uh mayor paulie's comment about uh housing authority i was reading a great article about ellensburg little ellensburg has a housing authority they have invested in affordable housing units and but we're not there yet because we don't have the data driving it we don't have the policy in place and all of that and so i would love to see us have more personnel resources in that area so i'm going to put my dots there no more than three so no more than three yes i'm going to do a pitch for data analysis capability because that's right i look at almost everything up here and if we do data analysis and we align to that data analysis that we learn from our data we're going to move the needle in almost all of these so it's it's the it's the great foundational activity that i think will it's a gift it'll keep on giving okay can i ask what is sp se1 yes he wants the public state p.o that's s cs3 let me check [Applause] okay so we need to write that down and then also mmp policy 6.3 is local transit so we need to be able to know what that is um the mmp policy next to that so that's that and then um title 16 works just want to make sure everybody knows that building code different from title 18. and then let's see what else over here might need um planning build update analysis increased hours especially additional nothing um body cams and accelerate i cap new solid waste runway okay do all of those what what do we got did you read body cams over there yeah flying oh we've got those twice so yeah well we said we wanted body cam separate from the oh yeah so just pick that one scratch out that and then stretch out body cameras yes great what was the other other one so there's one more that needed oh just title 16 i just want to make sure that's building code but that's fine um okay how are we feeling eight dots yeah ready set go up [Music] um [Music] yes we should have one over there that is the mmp for locals a surprise that's the local um transit here where's the green pen here yeah which one's that uh and then see policy 6.3 is yeah is the underserved neighborhoods yeah transit neighborhood transit is transpose staff different from transport demand manager yes transportation staff is for capital projects and such transportation demand manager is about communication for alternative modes okay thank you um [Music] yeah this is a lot easier doing it first than we tried to do last year online oh yeah yeah it's just more fun uh [Music] so hard you know if you're gonna add something you have to take something out all right it's not gonna be so much [Music] so if the orange dots are up i see before she heads out yeah i can program yes you can photograph them okay so i'm just gonna read them out so that we have them on record as well and then before bart gets out of here so for the operations side we have tod the transit oriented development no votes title 16 building code no votes community engagement one vote master mobility plan policy 6.3 neighborhood transit three votes additional transportation staff no votes spse one business recruitment study one vote spcs three body cams four votes 24 7 behavioral support two votes civic engagement one vote transportation demand manager one vote increased human services grant money two votes title 18 whiteboard seven votes human services pilot example urban forest management five votes reduced property crime or vote i was going to read these off and then give you just a chance to summarize anything if you feel like you need or are you out of here okay okay fantastic here we go um community planning one vote increase hours of equity training no votes build out data analysis six votes master facilities planning for votes transit master plan two votes additional housing resources five votes spcs three non-lethal tools two votes accelerate icap four votes and new solid waste runway zero votes okay so we will obviously take pictures of that and have that included in the um this is a great one thank you so much we'll see you guys okay bye-bye okay so the next part of this is really about hey how do we create how do we decide what we want to create as an output hypothesis and where are those lines so there's a few different ways that we can look at this we can give this just as it is to the administration and to ourselves and use the votes as just a 1 to 16 ranking type of thing we can take it and develop buckets so a bottom bucket with very little support a little bucket with some support and those top outlying areas where we see a lot of support we can just leave it in buckets or we can decide hey we really want to be strongly supportive of two three four items for each of these categories and be able to communicate that in a ranked order to the administration and we might take that top bucket and really further say okay between those we're going to take what came rose to the top and be able to say this is the council's top priority um beyond even what are out on the dots i would like to suggest something in that in previous years maybe an adaptation suddenly worked in previous years there was a time where what we would do is uh the council would ask for something administration would come back with a sort of a clarify clarification sheet right and it's like okay this is what we think we're hearing this is what we think the effort is involved from a budget standpoint so what i might what i would suggest is that we consider having a threshold and saying above that threshold we ask the administration to come back with a with a one pager on each hypothetically we get that far enough ahead of the budget process that we could review it and if we had further questions um we would arrive at budget with those spec sheets in good shape so that we could discuss whether it would be a good or bad or a different thing wally um i i don't know that you need to put yourself through that pain um from what i've heard um you know is very consistent with the administration's thinking nearly on every topic so i think we're going to be able to deliver most everything you're asking for i really just have one question in my mind on prioritization and that's the title 18 white board um because there are lots of projects there they vary widely in cost and i think those lend themselves to the kind of analysis that council member marks was just talking to um and so i i think the question for the group council president this afternoon is do you want to spend some time talking about the title 18 projects now should we put that on for a study session or a committee of the hole rather between now when the budget comes out with that kind of here's our here's what we're thinking is on the some of the costs but the rest that you have put out there is very much in line with the presentation that's in your packet of the administration's priorities so we think we can accomplish much of what you've already identified today without having further prioritization shorter yeah i mean i i was predicating my suggestion that the administration was going to want to at least uh you know try to bound things or that there are things here that you know they want to push back on and if there's not then yeah you need to do what you don't need to do okay um zach before going to you i think uh did you have something on the title 18 yeah well i think my suggestion on that would be to have a separate either committee a study session or cookie at the bowl because i think it's i think it would be helpful especially i'm i'm in the clinical environment committee so i've seen the whiteboard we've discussed in that committee uh recently but for other council members and it would be helpful for them to have some time to process that list and look through it and you know then then go into that prepared um so that would be my suggestion because i think that that's more fair especially to the council members that aren't in that committee yeah okay so i didn't know that by the way i was going to say that was a really good idea that maybe we should pursue a committee at the whole meeting on that topic um i am going to advocate that we do do some form of prioritization here whether or not we rank might not be necessary i think we should come out of this with our top two capital priorities maybe our top three operating priorities ranked by the number of votes that they have and maybe we can have a discussion about that if they don't need to be ranked maybe it's just this is our tier one priorities for each and then um we can include the list of all the other votes kind of in an attachment to that document but then we have a really focused list heading into budget development for the administration but also for council to say if we come out with with these um some of them are really big like green necklace in title 18 but if we go into budget knowing that these are our top priorities and we come out satisfied then we will have you know had a successful budget development season um i think keeping it focused um in short is also beneficial because of concerns with inflation uh it's also our very first two-year budget ever so i i think it might be better to be more conservative in that approach and then also as uh city administrative was pointed out the other day by email we have a lot of labor agreements that will be coming up that i think we need to be mindful of as well so i would i would suggest that we stay as focused as possible on our lists and come out with maybe top two capital top three operating um and go into budget season with that document held high um going forward thanks to the administrator no i'm sorry i just left my camera on um we can we can certainly uh do that i i guess my my message is is that we can give you probably more than your top two or three um but if you feel from a policy direction that you'd like to do that certainly by all means but i think nothing i've heard today is not really going against anything we haven't already modeled um so but whatever the council's pleasure yes and then okay so um that's great i mean that's great to hear you've already said that so then i guess the question for council is if we go with top two or top three it might be our you know thought as also makers that we want additional investment than whatever the proposal is in those ones and because those are our top priorities we might need to move buckets around and prioritize a specific priority but um i don't necessarily think that's direction we need to go but maybe that's a conversation we can have along this process well you know and i think that some some cities might have to do that but i don't think that we do i mean i think that the council and the administration are working very collaboratively um you know i i don't know i mean i don't know that the community is looking for something different i think the community is just looking to get it done the projects that are the priorities the operational initiatives so um you know i i think the council's been very loud and clear today about what you want to see done many of the projects especially on the capital side you were loud and clear last year on um so they're already in the pipeline um so i really think it's a function of time council president of how much more time you'd like to further refine what you've already identified as priorities okay russell i would support uh deputy president council member all comments i i would like us to do three at the top just for a couple reasons one we're unsure what the pandemic is going to bring and if we end up having a new wave we know that at least we're going to shoot for these three if something else happens it kind of gives us a little bit of a focus also around the community talking about what we're doing it's hard for us to talk about seven or eight projects but it's easy for us to talk about the top three that we're focused on and so people can hold this accountable people can hold the administration accountable for what we're saying we're going to do and then getting it done if we get more than that done at the end of the year that's kudos to us and that gives us extra talking points but at least the community knows exactly what we're trying to focus on and what we're going for and getting it done so there's a communication aspect to it as well now the administration can get all those things done that's that's fantastic and that gives us bragging rights but focusing on the top three or four or whatever number we choose just helps us kind of focus the conversation with the community when we're out there talking and gives you both sides the administration and the council uh the the accountability that we need as elected and um guardians of the city so to speak okay i might so when i'm looking through this list um i think capitals really easy to kind of bucket if i'm looking at it we have two that stand out with 11 and eight votes which is the green necklace and the northwest manish pinch point the next number of votes underneath that is four folks so i think we can very clearly say those are top two priorities and then we've got a grouping in there of eight other priorities that are between two and four votes and then six priorities with no votes so do do we feel like we need to take northwest spanish and green necklace and rank those or do we feel good with those three sets of buckets victoria uh well i was just gonna say earlier so the ones that didn't get any votes they were originally on someone's yes of your priority so they're they're still important to us they're just the lowest ranked ones but no votes doesn't mean that somebody didn't choose it initially um and then on your question um they're so they're different because the pinch point is already in the pipeline and so i think um supporting that is is different and that was one of our top priorities last year as well so the one that kind of is the emerging new priority great necklace but that puts them on different planes i think so i don't know that we need to bring them they're just different both important but different so i would say i like your grouping basically i think that's enough okay anybody think we need to do more than that i mean i might suggest that i'm probably coming out of this meeting with what wally said feeling uh excited and sort of expecting to see something related to the stuff that's between two and four and so if if there's things that are in the two to four range that you all don't intend to present in the budget it would be great to hear that ahead of time yeah we could break or we could yeah just have a conversation yeah okay does that sound good to the administration to look over that mid-tier list of two to four and if it's not something that you feel you can accomplish being able to explain and we can have dialogue about certainly you know i think i think the green necklace project's always a challenge because there's property acquisition involved and so you know we're going to have to come up with a a process that one we have staff to aggressively go after property which perhaps is not for sale as well as have proceeds to purchase um and so i think that's you know one of one of the questions ultimately for the council will be what what is the bucket of funds for proceeds to purchase um you know we every time a property has become available we've had money because we have been putting money aside uh that hasn't been an issue and so if the council is requesting that the administration accelerate that process um so the devil gets in the details of you know how do you encourage sellers to sell uh and do it in a uh economical way so uh we'll take on the challenge as you all are aware we've already indicated um through the capital financing work uh desire to put some additional energy to this so i i think i think we're going to be fine with that um something else that i i think everything else that's on the list and autumn andrea robert please correct me if i'm wrong is otherwise in our plans to work on so you know unless there's a council direction to wildly accelerate that which i'm not hearing those projects will continue to move forward anyone in the room staff please correct me if i'm misstating that no i think wally that's exactly correct and i think based on that idea of green necklace requires acquisition also requires trail creation and other things that maybe by that being on the capital list we're saying yes we need to allocate money to acquisitions and trail creation but it also sounds like maybe we need to have a strategic conversation or like have some prioritization around where is it most important to do the acquisition and how can we do so in a feasible way well and it's and it's a staffing issue too because who's who's working these projects right now we we had before the pandemic two uh park planners uh we are down to one park planner um as we look at being able to do this will there be a staffing component as well i mean i think i think the administration has plenty of of good feedback from the council today again these are all things we've been thinking about anyway i think we'll be able to put together a budget that meets the council's needs okay so do we feel good on the capital side of giving those three buckets with the direction of if something is in that mid bucket and it isn't going to be in the budget we want to hear about it and have an early conversation yes okay operations is more difficult um i think of the 24 we've got five that have zero votes of priority we've got another 11 that have one to two so that gives us our bottom two thirds maybe but then we've got two other potential buckets we've got a top tier and we'll have to figure out where we want to leave that we've got one with seven votes one with six votes and two with five votes so if we took that as the top tier that would end up with four at that top but then we've got another four with four votes and one with three books that almost indicates that maybe there's four tiers or something so let me see if i can read off um these top areas so with seven votes we've got the title 18 white board with six votes we've got the data analysis and tied with five votes we've got urban forest management and additional housing resources so it's possible that's a top tier but then we also have with four votes accelerate the icap facilities master plan uh reduced property crime and body cameras yeah what is with three was the neighborhood transit so i could get it worked the same way that it did with capital where the top four get special attention and the the ones that had three or four votes again if the administration isn't intending to uh come forward with the proposal and budget time talked ahead of that to understand but do we feel like that three level is the right area um versus going down to two i think there's one two three four five that have two so that feels like it would make the bucket too big so the top tier would be four items and the next tier would be five items that feel comfortable thumbs up um within that top tier since they're all very close together with seven votes six five and five do we feel like we need to do any kind of additional ranking or is grouping those in with the idea that they have six seven six five five does that make us feel comfortable you know what i like about those four things if you look at them they're all very different they're you know so i like two they're kind of like adjacent so i kind of you know i kind of think they are you could put them at the same same level you know even though they broke just slightly differently but they all looked um so the pr the practical problem with these four uh really go back to title 18 because that list could be worth two hundred thousand dollars or it could be worth two million dollars uh based on how many projects off that list you want to do in whatever interval you want to do them in um the the data analytics is likely at fte or a portion of an fte so that's a modest cost the urban forestry the administration really feels this is extremely important we've been working on models there and that is also probably an fte um the housing we're also trying to sort through that and that is probably uh consultant costs or a portion of an fte so those three combined you know are you know two hundred thousand dollars let's say uh or the title 18 uh blackboard whiteboard one project could be more than that i don't know that we are looked at really any of the projects that are under 200 000 we've started costing some of them um and andrea i i don't know if you have any recollection but certainly the ones we've costed it seems like 250 was perhaps the lowest amount i've heard as we've done some preliminary costing so the bottom the the next three could be as much as one project on the title 18 white board so i think that's going to be the question for the council and maybe again it's not one that needs to be solved today but it'll become a cash issue the other issue too is that the data analysts the urban forestry and the housing are likely ongoing costs where the title 18 is going to be one time mostly so um you know we we're happy to noodle through this if the council wants to provide additional direction or priority that's helpful of course um but that's what makes that group of four harder the the next group um kind of are all the same kind of bucket of lower costs generally um you know we can sort through that as well but uh you know those those first four become problematic just from a dollars and cents happy no surprise to hear you put body cams in the low-cost bucket well it's an evaluation of body cams well that's true it's an evaluation of the big things well body cameras are not as expensive as they used to be uh we we already the administration was already planning on coming forward with us we know it's at least a two year project that we would not be able to implement in 23 so that the dollars would likely be at 24. we would be able to do the 23 part with existing staff thank you i'm happy i'm stopping it yes so wally what i'm hearing in some cases is maybe we were a little bit too conservative and a little bit too cheap but we should have gone for more is kind of what i'm hearing no no no no not at all i think again you know all kidding aside uh that the administration and the council is on the same page because we're all we're playing off of the same hymnals the strategic plan the master mobility plan uh the icap you know we're all reading the same documents and so that the administration and the council are like you know very much in the same place is that we're listening to the community that we're listening to these boards that are working so incredibly hard um we're ending up more or less in the same place again dollars or dollars inflation's inflation um but i think it's great then and a lot of communities around us can't say the same thing um i just want to add on to i think a very good point that wally made many of you know my my interest in town has been land use for 30 years right so this title 18 project is huge to me and i do think your big budget conversation is going to be how much or how little or how fast you're going to get through that whiteboard that's that's the big i think that's the big piece you guys need to talk more about at some point not today but at some point because you know it'd be sure nice before my term ended you got through the whole whiteboard but that's just me but there's a lot of good stuff on there and you guys have to decide what kind of bike you want to take and then we have to figure out if we can support that so toward that idea what i was gonna say continuing on what i heard from wally is it sounds like we are going to need to have another conversation about what that title 18 whiteboard list is and so does the council feel like doing that in a counsel the whole is a good idea does it need to start with the pde and then move on does the timing have to be it has to happen before budget season is all of that right well we're in budget season it's july no no no no yeah i was gonna say i think going to a committee the whole is fine because it is a budget discussion and what i was going to say was i really liked how wally was talking about this and i think it's okay for us to do the structure of the list kind of as we were describing it um with the seven votes six votes and five votes all being in one category recognizing that title 18 has this asterisk next to it right now and that we have this upcoming conversation about what can we get accomplished in the biennium from the white board and then that will be in place of title 18. that's what that will mean not all of the title 18 whiteboards so i think as long as all of councils is in agreement on that which looks like there's some nodding um then i'm okay with that kind of list structure okay anything else so it sounds like we've come up with this idea that there are buckets and for operation and capital that top bucket which is either two or four projects respectively we just think our super priorities have to be a budget the next set we are asking for and saying hey if they're not able to be because you guys know the budget realities then let's talk through what that is there's a few things in each of the areas that might need more conversation to get down to specifics on what it means for the green necklace and kind of how we approach the strategy for that also on title 18 with the white board what is in scope on that what can we accomplish in this budget cycle versus future um and how we have a conversation with that with the larger council hey guys we're early that's okay we love this okay so at this point we have the potential for a 10-minute break followed by the 20 minutes of the administration budget priorities some opportunity for q2 reports and public comment so keep it on keep going roll on and you know people can get up as needed so we will roll on to administration budget priorities is that something wally's going to do so chris if you could put up the powerpoint so i can see it too just one moment so i'll i'll make this quick because most everything on here is something we've talked about next slide here are the seven buckets we came up with uh next slide we haven't talked a lot today about staffing um you know we we have in the last two years probably gone through you know two thirds to three quarters of staff turnover and so for an organization of about 250 people to think that we have hired you know over 150 new staff and though that period is a daunting large issue and it continues to have impacts on everything we do um and so as we look about look at the budget moving forward you know not only our fiscal health but staffing issues are really important um inflation we've talked about uh 10.1 as we go to the bargaining table uh that number the june 30 inflation number is the number we start bargaining with and so where we've had two percent and three percent increases in our contracts we are now at least at the bargaining table going to be starting with 10.1 percent that's a huge huge hit to our budget um every um percentage of payroll is about 200 250 000 robert is that in the ballpark um so that 10 potentially means 2 million so that is something we need to continue to be mindful of um you know not only that we are seeing the need to make adjustments on full-time uh staff pay on a classification by classification basis as we've gone out to hire people that's going to continue we have not come to grips completely with all the costs associated with part-time staff and so we've made adjustments there we'll continue to make adjustments uh on the fiscal side uh the revenue stabilization we've already talked to a little bit today and we'll talk more we'll be coming to the council next month with our mid-year budget and revenue forecast so we'll leave the rest of that discussion but clearly we're still in the midst of seeing stabilization there and then the staffing stabilization we've just had a recruitment and retention staff member in hr could come join us in the last several weeks you know we're going to have to continue to look at uh the costs associated with recruitment and retention and as we're building the budget we're trying to make sure that there is dollars available for that as well next slide apple improvement i don't know that there's much else to say i think we've talked about all of these points today um let's just go to the next slide police and human services uh again i think we've covered that the performance measurement piece uh appreciate the council's interest in that and so we will uh in the budget come back i think with some adjustments on how we staffed that we've also talked about the homelessness issue the pilot and the staffing resources required there next slide in the environment um again i've covered that urban forest management something that we've been thinking of um and then the park strategic plan update i think we continue to struggle with the time tempo of park planning and so we're going to continue to invest dollars in that as we move forward next slide we've covered all of this uh next slide uh facilities uh again something that's not really been on the council's radar over the last year or so uh in the meantime we've been very uh aggressive cleaning out city hall northwest we've talked a little bit about the report that's coming uh to committee uh in the next week or two so that's on our plate and on your council's plate next slide then citywide initiatives we have another community survey coming up next year so we'll need to budget for that we've talked about communications we've talked a little bit about equity we're going to need to continue to invest resources in having staff implement the equity framework and we've talked about the performance measurement piece next slide that's it i'm president happy to answer any questions but as i said earlier i think this conversation today really echoes uh that the council and the administration are largely on the same page of issues that are important in this spot okay um i have one comprehensive plan i know that's coming up i haven't seen that in any of our priority lists are we looking at potentially needing more staff or that taking staff time away from some of these priorities that we've established and we'll be here about that during the budget presentation so that we understand that we are staffed up for not only our one time but our other needs and i think you'll hear about it with the title 18 white board because the nice folks that would worry about the title 18 whiteboard the same folks have to worry about account plan update so um i think you'll hear about it in that context okay i'm thinking more of the staff and time commitment that's going to be needed i you know i'm on the affordable housing committee and other things and i'm hearing regionally everybody's like comp plan's going to be a big thing staff isn't going to be able to do other things and so i want to be able to hear clearly from the administration that when we're looking at this budget cycle we are aware and have considered that and that it's not going to hurt these other priorities that we've established i don't want to hear oh we don't have staff for that if it's this known thing coming up so and and and the question back to the council will be how aggressive on title 18 white board do you want to be and depending on what the answer to that question is is going to have an impact on the resources we have for the comp plan great let's have that conversation because my answer is so aggressive so looking forward to it and and then and then it it comes down to how much cash are we spending i mean it's one-time dollars we you know have one-time dollars to allocate um those would come from you know otherwise we would likely spend them on capital projects and so then you get to the list of capital projects that weren't in your top bucket um and then they'll that'll compete with funding uh planning consultants yeah um one thing i want everybody to consider too especially since you're hearing it at the regional level is planners aren't in abundance right now neither are engineers and all cities are going to go through this comprehensive plan update so while getting the impact from the council on how aggressive you want to be we will have to go and do a reality resource check to make sure that there are consultants available for our title 18 just remember we're the only ones with the title 18 white board nobody else is doing what you're doing which is to build this new toolkit so we'll you know let's talk about what you want to do and then we have to do a resource reality check and see because we don't want to tell you that we can take on all these contracts to do things when the contractors are working on people's comprehensive plan updates so it's a we'll figure it all out after you have your conversation about where you guys want to land and then um can we robert can we pull up the slide that you had on the budget calendar yes i just want to kind of close with some of that idea on this budget conversation so that we are all aware of that i also like to ask what is potentially different in this budget cycle with you taking the help on this and with it being a biennium budget what should we be aware of process-wise and calendar-wise that might be different from our previous processes oh you could probably answer it from last year but yeah but i think i mean we're really aiming first with the process you know we tried to start a little bit it's towards the end yeah we started a little bit i think ahead of last year i think stephanie's i'm just in a different place um this year um so we have started it and i know we have adele was here susie so we have dale and susie and myself working on the budget this year so that's the difference for previous years i think again starting earlier we have already gone actually we've already gone through the request process with staff already so we have the the operating budget um actually closing in about a week or so with steps so we started really early we already had a prioritization meeting with senior leadership team and wally and andrea so we've already had that discussion and so you know keeping on track we have the august 8th is going to be our kind of deep dive forecast but again like i said before there's a lot of things that could change between now and adoption you do have the ability to change between our adoption so if we saw a revenue drop say we're going to run the increase before the end of the year we can come back and make changes and we don't like to make last minute changes of course but again as long as the budget's open if something fundamental does change we're in a recession or some other other impact obviously we will have that ability to go back during that time so another thing i see on the calendar is that we are taking the budget and budget deliberations to each of the committees so can you talk through what that will be because that's obviously different from any of our previous processes is yeah what what are you expecting as an outcome of that that's different from maybe say going to committee of the whole because it looks like i'm seeing only one committee to committee of the whole but only one for deliberation and again that can be extended so again we're you know we're being pretty aggressive on that back end schedule again we can we can stretch that out if needed have an additional meeting and actually stretch out another council meeting actually two council meetings maximum so we could do that but as far as the committee about the infrastructure committee and the services safety and parks that's going to be really focused on capital the capital requests so if you need the whole really look at the operating wise we've got the executive budget of the other budgets so those two would really be focused on the capital discussion so that's why we want and that's the way we understand it of course the council wants a different format we're certainly open to it but that's how we presented it so far we've looked at the committees and said okay but the capital was it does it fit with the committee the whole or does it fit the different components and so that's what that was well it seems like pde when you're looking at capital is looking squarely at the green necklace just as another thought there um but do any of the council members have questions about that that all of this is different from how we've handled it previously because we didn't have committees um we did some of us well i mean i think we did use this on different pieces yeah yeah okay feeling good about that any other questions or thoughts about the budget schedule or how we're going to handle this as a two-year process nobody's as nervous about this as i have one am question so i i would assume you know we don't do the allergy the reallocation in the mid year or the middle of the two-year budget but at the end of the two years if there were funds that were unspent that you wanted to reallocate to that same project in the third year then that that would be that reality yes every authorization as we go into a new two-year biannual budget i'm wondering if the administration has thought about perhaps just putting out a brief blurb about the changes in the budget how community members or organizations can contribute to that budget and maybe a couple references both to this session's recording in the previous session that you did educating the council about the budget process just because it's different the public may have a regular process if they're in terms of requesting funding and now that's changed we just need to know kind of how the landscape has changed for their proposals or their requests sure okay i know on the calendar one thing that i admitted that we have presented before was at some point um from september to october we have we have one public meeting so that's also up to council if you don't have more than one public meeting the public hearings that we have as requirements oh you're talking about like outside okay yeah so something that's a community engagement ask questions provide feedback etc okay okay and can i ask one question uh that's president walsh just to clarify you are okay and the council's okay with the structure we have here in terms of the committees where we're just bringing for those community pieces we're just bringing the capital we're operating between yeah this is common practice for communities that have committees how we use it yeah i think the only thing you carved out of the communities with the capital because the capital pieces tend to be there's they tend to be big lots of details whereas the operating budget can turn out as detailed um i think the planning development and environment committee just by its okay so i think that may close out the administration budget priority we did receive the q2 reports the work plan and the capital project list open to questions comments discussion anything i thought it was staying straight forward but really good information as always if you have questions when i ask you can email in and we can continue on items like that seeing no questions i will mark that one down and then the last opportunity for public comment do we have anybody on the line nobody in person and looks like anne just dropped off okay no worries i'm sure we'll learn from her um okay gosh guys we have we have 30 minutes we should just sit here and [Music] um i am going to then during the meeting at 128 and thank everybody staff